{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,16]],"date-time":"2026-01-16T21:02:52Z","timestamp":1768597372820,"version":"3.49.0"},"reference-count":29,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","license":[{"start":{"date-parts":[[2020,1,1]],"date-time":"2020-01-01T00:00:00Z","timestamp":1577836800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/legalcode"}],"funder":[{"DOI":"10.13039\/501100010193","name":"Korea Electric Power Corporation","doi-asserted-by":"publisher","id":[{"id":"10.13039\/501100010193","id-type":"DOI","asserted-by":"publisher"}]},{"DOI":"10.13039\/501100007053","name":"Korea Institute of Energy Technology Evaluation and Planning","doi-asserted-by":"publisher","id":[{"id":"10.13039\/501100007053","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Access"],"published-print":{"date-parts":[[2020]]},"DOI":"10.1109\/access.2020.3015517","type":"journal-article","created":{"date-parts":[[2020,8,10]],"date-time":"2020-08-10T21:30:18Z","timestamp":1597095018000},"page":"148169-148180","source":"Crossref","is-referenced-by-count":19,"title":["Adaptive Protection Method of Distribution Networks Using the Sensitivity Analysis for Changed Network Topologies Based on Base Network Topology"],"prefix":"10.1109","volume":"8","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-1546-3839","authenticated-orcid":false,"given":"Mi-Gon","family":"Choi","sequence":"first","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0003-2992-1041","authenticated-orcid":false,"given":"Seon-Ju","family":"Ahn","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-0258-1369","authenticated-orcid":false,"given":"Joon-Ho","family":"Choi","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0003-0210-1676","authenticated-orcid":false,"given":"Sung-Min","family":"Cho","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-9533-3072","authenticated-orcid":false,"given":"Sang-Yun","family":"Yun","sequence":"additional","affiliation":[]}],"member":"263","reference":[{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijepes.2019.105551"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2013.2294879"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2009.2029057"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2010.2041560"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1109\/TII.2017.2682101"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2015.2420711"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2017.2749321"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1049\/iet-gtd.2018.5810"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijepes.2020.106026"},{"key":"ref19","year":"2008","journal-title":"KEPCO Department of Power Distribution Planning Guidelines for Distribution Network Protection"},{"key":"ref28","first-page":"14","year":"2008","journal-title":"Protection of Electric Distribution Systems"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1049\/iet-gtd.2015.0394"},{"key":"ref27","doi-asserted-by":"publisher","DOI":"10.3390\/en13051294"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1016\/S0378-7796(01)00176-6"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1049\/iet-gtd.2016.1563"},{"key":"ref29","first-page":"14","article-title":"Mid-to-long term operation plan of distribution control center according to expansion of distribution system intelligent equipment","author":"choi","year":"2017"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1109\/TIA.2017.2717880"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2015.2506155"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1049\/iet-gtd.2016.0614"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2017.2724766"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1049\/iet-gtd.2017.0586"},{"key":"ref1","first-page":"7","year":"2015","journal-title":"Architecture Design and Implementation"},{"key":"ref20","first-page":"113","author":"burke","year":"1994","journal-title":"Power Distribution Engineering"},{"key":"ref22","year":"2018","journal-title":"Operation Standard of Distribution Center"},{"key":"ref21","year":"2015","journal-title":"Management Procedure of Standard Operation Procedure"},{"key":"ref24","year":"2009"},{"key":"ref23","doi-asserted-by":"crossref","first-page":"1672","DOI":"10.1049\/iet-gtd.2017.1674","article-title":"Planning the coordination of overcurrent relays for distribution systems considering network reconfiguration and load restoration","volume":"12","author":"sharma","year":"2018","journal-title":"IET Gener Transmiss Distrib"},{"key":"ref26","doi-asserted-by":"publisher","DOI":"10.1016\/j.epsr.2005.02.005"},{"key":"ref25","doi-asserted-by":"publisher","DOI":"10.1049\/iet-gtd.2017.1229"}],"container-title":["IEEE Access"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6287639\/8948470\/09163368.pdf?arnumber=9163368","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,12,17]],"date-time":"2021-12-17T19:55:05Z","timestamp":1639770905000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/9163368\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020]]},"references-count":29,"URL":"https:\/\/doi.org\/10.1109\/access.2020.3015517","relation":{},"ISSN":["2169-3536"],"issn-type":[{"value":"2169-3536","type":"electronic"}],"subject":[],"published":{"date-parts":[[2020]]}}}