{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,15]],"date-time":"2026-04-15T02:33:34Z","timestamp":1776220414602,"version":"3.50.1"},"reference-count":61,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","license":[{"start":{"date-parts":[[2020,1,1]],"date-time":"2020-01-01T00:00:00Z","timestamp":1577836800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/legalcode"}],"funder":[{"DOI":"10.13039\/501100001809","name":"National Natural Science Foundation of China","doi-asserted-by":"publisher","award":["51877072"],"award-info":[{"award-number":["51877072"]}],"id":[{"id":"10.13039\/501100001809","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Access"],"published-print":{"date-parts":[[2020]]},"DOI":"10.1109\/access.2020.3020548","type":"journal-article","created":{"date-parts":[[2020,8,31]],"date-time":"2020-08-31T21:05:23Z","timestamp":1598907923000},"page":"158875-158882","source":"Crossref","is-referenced-by-count":10,"title":["A Survey on Post-Evaluation Indicator System for Multi-Energy Infrastructure Investments"],"prefix":"10.1109","volume":"8","author":[{"given":"Kun","family":"Sheng","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yun","family":"Li","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jinming","family":"Li","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yidong","family":"Chen","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-0569-377X","authenticated-orcid":false,"given":"Jianting","family":"Zou","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yuanyuan","family":"Zhang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-8514-0499","authenticated-orcid":false,"given":"Yang","family":"He","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref39","doi-asserted-by":"publisher","DOI":"10.4028\/www.scientific.net\/AMM.357-360.2881"},{"key":"ref38","doi-asserted-by":"publisher","DOI":"10.1201\/b19880-52"},{"key":"ref33","first-page":"70","article-title":"Study on the method of post project evaluation for FGD in thermal power plant","volume":"39","author":"yang","year":"2006","journal-title":"Electronics& Power"},{"key":"ref32","first-page":"2458","article-title":"On post-evaluation of power plant construction project based on improved back propagation neural network","author":"niu","year":"2010","journal-title":"Proc 29th Chin Control Conf"},{"key":"ref31","first-page":"1416","article-title":"Study on indicator system for post-evaluation of thermal power plant construction project","volume":"38","author":"niu","year":"2010","journal-title":"East China Electric Power"},{"key":"ref30","first-page":"1","article-title":"Post evaluation index system of smart grid pilot city planning","author":"li","year":"2012","journal-title":"Proc IEEE PES Innovative Smart Grid Technol (ISGT)"},{"key":"ref37","first-page":"49","article-title":"Research on process post-project evaluation for power plant construction project based on AHP and matter-element and extension model","volume":"37","author":"niu","year":"2010","journal-title":"J North China Electric Power Univ"},{"key":"ref36","doi-asserted-by":"publisher","DOI":"10.1109\/CCDC.2019.8833059"},{"key":"ref35","doi-asserted-by":"publisher","DOI":"10.4028\/www.scientific.net\/AMM.448-453.2753"},{"key":"ref34","doi-asserted-by":"publisher","DOI":"10.1109\/ICEE.2010.624"},{"key":"ref60","first-page":"3","article-title":"The key points about the post evaluation of the wind farm","author":"wang","year":"2012","journal-title":"Proc IEEE Int Conf Environ Sci Inf Appl Technol (ESIAT)"},{"key":"ref61","doi-asserted-by":"publisher","DOI":"10.4028\/www.scientific.net\/AMR.1044-1045.1753"},{"key":"ref28","doi-asserted-by":"publisher","DOI":"10.4028\/www.scientific.net\/AMR.722.86"},{"key":"ref27","first-page":"363","article-title":"The post-evaluation index system for preparatory work of transmission and transformation projects","author":"ma","year":"2011","journal-title":"Proc IEEE Power Eng Autom Conf"},{"key":"ref29","first-page":"206","article-title":"Post evaluation of large wind\/solar hybrid power generation project based on matter-element and extension model","volume":"33","author":"dong","year":"2015","journal-title":"Water Resources and Power"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1016\/j.energy.2019.05.057"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1016\/j.energy.2018.02.078"},{"key":"ref20","first-page":"1597","article-title":"Study on post evaluation index system for the scientific and technological projects in electric power grid companies","volume":"40","author":"hu","year":"2012","journal-title":"East China Electric Power"},{"key":"ref22","first-page":"32","article-title":"Economic post evaluation of medium-voltage and low-voltage transmission and distribution project","volume":"35","author":"zhou","year":"2019","journal-title":"J North China Electr Power Univ"},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.1109\/ICRMEM.2008.86"},{"key":"ref24","doi-asserted-by":"publisher","DOI":"10.1088\/1755-1315\/330\/5\/052034"},{"key":"ref23","first-page":"1","article-title":"A preliminary investigation on smart grid&#x2019;s low-carbon index system","volume":"34","author":"tan","year":"2010","journal-title":"Autom Electr Power Syst"},{"key":"ref26","first-page":"1041","article-title":"Research on sustainable post evaluation of wind power project in northeast power grid","volume":"39","author":"li","year":"0","journal-title":"East China Electric Power"},{"key":"ref25","doi-asserted-by":"publisher","DOI":"10.4028\/www.scientific.net\/AMM.71-78.2341"},{"key":"ref50","doi-asserted-by":"publisher","DOI":"10.2991\/icmse-15.2015.49"},{"key":"ref51","first-page":"1428","article-title":"Study on post-evaluation of economic benefits for power plant construction project based on fuzzy neural network","volume":"38","author":"wang","year":"2010","journal-title":"East China Electric Power"},{"key":"ref59","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-54924-3_40"},{"key":"ref58","first-page":"668","article-title":"Environmental impact post evaluation for thermal power project based on combinational weight","volume":"38","author":"zhang","year":"2010","journal-title":"East China Electric Power"},{"key":"ref57","doi-asserted-by":"publisher","DOI":"10.1016\/j.eiar.2015.07.004"},{"key":"ref56","doi-asserted-by":"publisher","DOI":"10.2991\/lemcs-15.2015.314"},{"key":"ref55","doi-asserted-by":"publisher","DOI":"10.4028\/www.scientific.net\/AMM.209-211.1480"},{"key":"ref54","first-page":"1","article-title":"Research on comprehensive benefit post evaluation of photovoltaic poverty alleviation projects based on FCM and SVM","author":"liu","year":"2019","journal-title":"Proc 3rd Int Conf Environ Energy Eng (IC3E)"},{"key":"ref53","doi-asserted-by":"publisher","DOI":"10.1016\/j.enpol.2017.08.013"},{"key":"ref52","first-page":"277","article-title":"The Study on the post-evaluation of benefits of the abandon hydropower","author":"tao","year":"2014","journal-title":"Proc 3rd Int Conf Machinery Electron Control Eng (ICMECE)"},{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1186\/s41601-019-0116-6"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2018.02.223"},{"key":"ref40","first-page":"112","article-title":"Technical post-evaluation on power transmission and transformation project based on comprehensive evaluation method","volume":"34","author":"wei","year":"2010","journal-title":"Power Syst Technol"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1016\/j.enconman.2018.08.068"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1016\/j.heliyon.2019.e01396"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1016\/j.enbuild.2016.05.043"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1186\/s41601-019-0132-6"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.2991\/csic-15.2015.60"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1109\/EI2.2018.8582636"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.4028\/www.scientific.net\/AMM.415.280"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.4028\/www.scientific.net\/AMR.756-759.2668"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1109\/TSTE.2019.2961432"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1016\/j.energy.2013.10.041"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1049\/iet-rpg.2018.6005"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2015.2390640"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1016\/j.scs.2019.101973"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1016\/j.rser.2019.04.015"},{"key":"ref49","doi-asserted-by":"publisher","DOI":"10.1088\/1755-1315\/93\/1\/012053"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1186\/s41601-018-0080-6"},{"key":"ref46","doi-asserted-by":"publisher","DOI":"10.1109\/ICETCE.2011.5775830"},{"key":"ref45","doi-asserted-by":"publisher","DOI":"10.4028\/www.scientific.net\/AMM.438-439.839"},{"key":"ref48","first-page":"33","article-title":"Comprehensive post-evaluation method of power network renovation project based on fuzzy interval evaluation and analytic hierarchy process","volume":"33","author":"yang","year":"2009","journal-title":"Power Syst Technol"},{"key":"ref47","first-page":"108","article-title":"Post-evaluation of investment benefit for grid construction project in regions without electricity","volume":"35","author":"zeng","year":"2014","journal-title":"Electr Power Construct"},{"key":"ref42","first-page":"738","article-title":"Increased power supply calculation method for power transmission and transformation project post-evaluation","volume":"40","author":"lu","year":"2012","journal-title":"East China Electric Power"},{"key":"ref41","first-page":"54","article-title":"Discussion on the post-evaluation method step of wind farm generation","volume":"46","author":"wang","year":"2013","journal-title":"Electronics& Power"},{"key":"ref44","doi-asserted-by":"publisher","DOI":"10.1109\/ICEEE.2010.5660464"},{"key":"ref43","doi-asserted-by":"publisher","DOI":"10.1016\/j.renene.2018.08.009"}],"container-title":["IEEE Access"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6287639\/8948470\/09181611.pdf?arnumber=9181611","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,12,17]],"date-time":"2021-12-17T19:55:34Z","timestamp":1639770934000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/9181611\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020]]},"references-count":61,"URL":"https:\/\/doi.org\/10.1109\/access.2020.3020548","relation":{},"ISSN":["2169-3536"],"issn-type":[{"value":"2169-3536","type":"electronic"}],"subject":[],"published":{"date-parts":[[2020]]}}}