{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,8]],"date-time":"2026-05-08T15:54:26Z","timestamp":1778255666009,"version":"3.51.4"},"reference-count":21,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","license":[{"start":{"date-parts":[[2020,1,1]],"date-time":"2020-01-01T00:00:00Z","timestamp":1577836800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/legalcode"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Access"],"published-print":{"date-parts":[[2020]]},"DOI":"10.1109\/access.2020.3030637","type":"journal-article","created":{"date-parts":[[2020,10,13]],"date-time":"2020-10-13T19:37:21Z","timestamp":1602617841000},"page":"186335-186347","source":"Crossref","is-referenced-by-count":35,"title":["Two-Stage Congestion Management Considering Virtual Power Plant With Cascade Hydro-Photovoltaic-Pumped Storage Hybrid Generation"],"prefix":"10.1109","volume":"8","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-7252-3316","authenticated-orcid":false,"given":"Nan","family":"Lou","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-8776-1130","authenticated-orcid":false,"given":"Yong","family":"Zhang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-7156-9283","authenticated-orcid":false,"given":"Yuqin","family":"Wang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-6102-1321","authenticated-orcid":false,"given":"Qixing","family":"Liu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-7097-4850","authenticated-orcid":false,"given":"Huiyong","family":"Li","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-2177-6812","authenticated-orcid":false,"given":"Yu","family":"Sun","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-3792-7251","authenticated-orcid":false,"given":"Zongtian","family":"Guo","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref10","first-page":"139","article-title":"Congestion management considering multi-time interval demand response","volume":"34","author":"sun","year":"2010","journal-title":"Power Syst Technol"},{"key":"ref11","first-page":"48","article-title":"Congestion management model and characteristics analysis with participation of interruptible load","volume":"27","author":"shi","year":"2015","journal-title":"Proc CSU-EPSA"},{"key":"ref12","first-page":"78","article-title":"Management of transmission congestion of cross-region interconnected electricity market based on demand response","volume":"11","author":"liu","year":"2017","journal-title":"Southern Power Syst Technol"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1109\/OPTIM.2008.4602362"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1109\/PES.2008.4596877"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2012.06.019"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2010.09.014"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2016.2569603"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2015.12.101"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1016\/j.anucene.2016.09.030"},{"key":"ref4","first-page":"1268","article-title":"Multi-objective optimal operation of cascade hydropower stations based on objective adjacent scale and marginal analysis principle","volume":"39","author":"zhang","year":"2019","journal-title":"Proc CSEE"},{"key":"ref3","first-page":"918","article-title":"On ecological operation of cascade hydropower stations along Wujiang river in Guizhou province","volume":"27","author":"lyu","year":"2016","journal-title":"Adv Water Sci"},{"key":"ref6","first-page":"15","article-title":"Analysis of maximum photovoltaic integrated capacity and its influences on distribution networks based on probabilistic load flow","volume":"19","author":"liu","year":"2018","journal-title":"Electr Eng"},{"key":"ref5","first-page":"1560","article-title":"Research of permitted capacity of distributed photovoltaic generation based on voltage deviation chance constrained","volume":"33","author":"sun","year":"2018","journal-title":"Trans China Electrotech Soc"},{"key":"ref8","first-page":"227","article-title":"A multi-source coordinated short-term dispatch model considering the dispatchability of nuclear power plants","volume":"33","author":"hou","year":"2018","journal-title":"Trans China Electrotech Soc"},{"key":"ref7","first-page":"4040","article-title":"Coordinated optimization scheduling of multi-region virtual power plant with wind-power\/photovoltaic\/hydropower\/carbon-capture units","volume":"43","author":"sun","year":"2019","journal-title":"Power Syst Technol"},{"key":"ref2","first-page":"1597","article-title":"An optimal method of short-term scheduling for hydropower system with pumped-storage units","volume":"41","author":"jia","year":"2017","journal-title":"Power Syst Technol"},{"key":"ref1","first-page":"2816","article-title":"Multi-objective optimal control of cascaded reservoirs during drawdown period before flood season","volume":"39","author":"cao","year":"2019","journal-title":"Proc CSEE"},{"key":"ref9","first-page":"3630","article-title":"Electricity transactions and congestion management based on blockchain in energy Internet","volume":"40","author":"tai","year":"2016","journal-title":"Power Syst Technol"},{"key":"ref20","first-page":"74","article-title":"Comparison and research of mutation operators in multi-objective evolutionary algorithms","volume":"45","author":"wen","year":"2009","journal-title":"Comput Eng Appl"},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.3724\/SP.J.1001.2012.04108"}],"container-title":["IEEE Access"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6287639\/8948470\/09222147.pdf?arnumber=9222147","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,1,12]],"date-time":"2022-01-12T01:08:53Z","timestamp":1641949733000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/9222147\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020]]},"references-count":21,"URL":"https:\/\/doi.org\/10.1109\/access.2020.3030637","relation":{},"ISSN":["2169-3536"],"issn-type":[{"value":"2169-3536","type":"electronic"}],"subject":[],"published":{"date-parts":[[2020]]}}}