{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,26]],"date-time":"2026-02-26T13:47:00Z","timestamp":1772113620770,"version":"3.50.1"},"reference-count":30,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","license":[{"start":{"date-parts":[[2021,1,1]],"date-time":"2021-01-01T00:00:00Z","timestamp":1609459200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/legalcode"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Access"],"published-print":{"date-parts":[[2021]]},"DOI":"10.1109\/access.2021.3049197","type":"journal-article","created":{"date-parts":[[2021,1,5]],"date-time":"2021-01-05T22:04:17Z","timestamp":1609884257000},"page":"7183-7192","source":"Crossref","is-referenced-by-count":23,"title":["A Technical &amp; Economic Evaluation of Inertial Response From Wind Generators and Synchronous Condensers"],"prefix":"10.1109","volume":"9","author":[{"ORCID":"https:\/\/orcid.org\/0000-0001-8570-4899","authenticated-orcid":false,"given":"Ha Thi","family":"Nguyen","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-2486-1927","authenticated-orcid":false,"given":"Meadhbh Ni","family":"Chleirigh","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-4695-6705","authenticated-orcid":false,"given":"Guangya","family":"Yang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref30","doi-asserted-by":"publisher","DOI":"10.1007\/s40565-017-0346-4"},{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1049\/iet-rpg.2015.0137"},{"key":"ref11","first-page":"885","article-title":"Modeling of GE wind turbine-generators for grid studies","volume":"4","author":"clark","year":"2010","journal-title":"GE Energy"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1007\/s40565-018-0430-4"},{"key":"ref13","author":"kiviluoma","year":"2014","journal-title":"REserviceS D5 4 Frequency reserves from wind power and PV in alarge footprint"},{"key":"ref14","year":"2013","journal-title":"Capabilities and Costs for Ancillary Services Provision by Wind Power Plants"},{"key":"ref15","article-title":"REserviceS D5.5: Ancillary services fromwind and solar PV at transmission level&#x2014;Evaluation and conclusions ofcase studies","author":"kiviluoma","year":"2014"},{"key":"ref16","article-title":"Technical regulation 3.2.5 for wind power plants above 11 kW","year":"2016","journal-title":"energinet dk"},{"key":"ref17","first-page":"1248","article-title":"Hydro-Qu&#x00E9;bec grid code for wind farm interconnection","volume":"2","author":"bernard","year":"2005","journal-title":"Proc IEEE Power Eng Soc Gen Meeting"},{"key":"ref18","first-page":"1","year":"2018","journal-title":"Technical Requirements for the Connection of Generating Stations to the Hydro-Qu&#x00E9;bec Transmission System"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1109\/ISGTEurope.2014.7028810"},{"key":"ref28","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2019.2914342"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2015.2417758"},{"key":"ref27","doi-asserted-by":"publisher","DOI":"10.1109\/TIE.2018.2835389"},{"key":"ref3","article-title":"Modern wind generators","author":"ragheb","year":"2019"},{"key":"ref6","year":"2018","journal-title":"Need for synthetic inertia (SI) for frequency regulation"},{"key":"ref29","first-page":"1","article-title":"Applying synchronous condenser for damping provision in converter-dominated power system","author":"nguyen","year":"2020","journal-title":"J Modern Power Syst Clean Energy"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.3182\/20140824-6-ZA-1003.02615"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1049\/iet-rpg.2018.5263"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1109\/TSTE.2018.2856938"},{"key":"ref2","author":"olguin","year":"2014","journal-title":"Large Scale Renewable Power Generation"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1109\/TEC.2009.2026609"},{"key":"ref1","article-title":"Security of electricity supply in a low-carbon Britain","author":"bell","year":"2016"},{"key":"ref20","year":"2012","journal-title":"Presentation of ENTSO-e Draft Connection Codes"},{"key":"ref22","author":"johnson","year":"2020","journal-title":"Grid Code Frequency Response Working Group System Inertia"},{"key":"ref21","first-page":"13","article-title":"Grid code frequency response working report","author":"whyte","year":"2012"},{"key":"ref24","first-page":"1","article-title":"Wind farm inertia emulation to fulfill Hydro-Qu&#x00E9;bec&#x2019;s specific need","volume":"7","author":"brisebois","year":"2011","journal-title":"Proc IEEE Power Energy Soc Gen Meeting"},{"key":"ref23","author":"stein","year":"2011","journal-title":"Frequency Response Technical Sub-Group Report"},{"key":"ref26","first-page":"1","article-title":"The Bornholm power system an overview","author":"\u00f8stergaard","year":"2010"},{"key":"ref25","year":"2016","journal-title":"RoCoF Alternative & Complementary Solutions Project Phase 2 Study Report"}],"container-title":["IEEE Access"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6287639\/9312710\/09314120.pdf?arnumber=9314120","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,12,17]],"date-time":"2021-12-17T19:55:58Z","timestamp":1639770958000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/9314120\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021]]},"references-count":30,"URL":"https:\/\/doi.org\/10.1109\/access.2021.3049197","relation":{},"ISSN":["2169-3536"],"issn-type":[{"value":"2169-3536","type":"electronic"}],"subject":[],"published":{"date-parts":[[2021]]}}}