{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,1]],"date-time":"2026-04-01T18:12:10Z","timestamp":1775067130372,"version":"3.50.1"},"reference-count":21,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","license":[{"start":{"date-parts":[[2022,1,1]],"date-time":"2022-01-01T00:00:00Z","timestamp":1640995200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/legalcode"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Access"],"published-print":{"date-parts":[[2022]]},"DOI":"10.1109\/access.2021.3051230","type":"journal-article","created":{"date-parts":[[2021,2,9]],"date-time":"2021-02-09T06:32:27Z","timestamp":1612852347000},"page":"72373-72380","source":"Crossref","is-referenced-by-count":29,"title":["Fault Reconfiguration Strategies of Active Distribution Network With Uncertain Factors for Maximum Supply Capacity Enhancement"],"prefix":"10.1109","volume":"10","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-9724-8859","authenticated-orcid":false,"given":"Xiaoqin","family":"Wang","sequence":"first","affiliation":[{"name":"State Grid Zhejiang Xinchang Electric Power Supply Company, Shaoxing, China"}]},{"given":"Xudan","family":"Sheng","sequence":"additional","affiliation":[{"name":"State Grid Shaoxing Electric Power Supply Company, Shaoxing, China"}]},{"given":"Weixing","family":"Qiu","sequence":"additional","affiliation":[{"name":"State Grid Shaoxing Electric Power Supply Company, Shaoxing, China"}]},{"given":"Wanli","family":"He","sequence":"additional","affiliation":[{"name":"State Grid Zhejiang Xinchang Electric Power Supply Company, Shaoxing, China"}]},{"given":"Jing","family":"Xu","sequence":"additional","affiliation":[{"name":"State Grid Zhejiang Xinchang Electric Power Supply Company, Shaoxing, China"}]},{"given":"Yang","family":"Xin","sequence":"additional","affiliation":[{"name":"State Grid Zhejiang Xinchang Electric Power Supply Company, Shaoxing, China"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-6010-7761","authenticated-orcid":false,"given":"Jiabin","family":"Jv","sequence":"additional","affiliation":[{"name":"College of Electrical Engineering, Shanghai University of Electric Power, Shanghai, China"}]}],"member":"263","reference":[{"key":"ref10","first-page":"70","article-title":"Bi level optimization of maximum power supply capacity of active distribution network based on chance constrained programming","volume":"46","author":"zhou","year":"2018","journal-title":"Power Syst Protection Control"},{"key":"ref11","first-page":"196","article-title":"Maximum power supply capacity model of distribution network considering multi time scale electricity trading market","volume":"38","author":"fan","year":"2020","journal-title":"Hydropower Energy Science"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2020.2995164"},{"key":"ref13","first-page":"1289","article-title":"Optimal real-time scheduling of energy storage systems to accommodate PV generation in distribution networks","author":"li","year":"2018","journal-title":"Proc IEEE Innov Smart Grid Technol (Asia (ISGT Asia))"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1109\/TSTE.2019.2961432"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2010.2053053"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1109\/PESGM.2016.7741472"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2019.2942012"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1109\/JESTPE.2016.2523546"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1109\/TSTE.2018.2796102"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1109\/CICED.2018.8592224"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1016\/j.enconman.2020.112909"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1109\/ICPSAsia48933.2020.9208613"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2019.2930552"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1109\/TIE.2015.2493142"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2020.3027705"},{"key":"ref2","first-page":"102","article-title":"Day ahead optimal dispatch of active distribution network considering micro energy grid access","volume":"32","author":"chen","year":"2020","journal-title":"Automation of Power System"},{"key":"ref1","doi-asserted-by":"crossref","first-page":"101","DOI":"10.1109\/TII.2015.2500161","article-title":"Dynamic multiple-period reconfiguration of real-time scheduling based on timed Des.supervisory control","volume":"12","author":"wang","year":"2016","journal-title":"IEEE Trans Ind Informat"},{"key":"ref9","first-page":"643","article-title":"Calculation of maximum power supply capacity of three-phase unbalanced distribution network based on mixed integer second-order cone","volume":"53","author":"zheng","year":"2020","journal-title":"J Wuhan Univ (Eng Ed )"},{"key":"ref20","doi-asserted-by":"publisher","DOI":"10.1049\/iet-rpg.2020.0163"},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.1109\/COGEN.2016.7728970"}],"container-title":["IEEE Access"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6287639\/9668973\/09321405.pdf?arnumber=9321405","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,10,20]],"date-time":"2023-10-20T19:59:06Z","timestamp":1697831946000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/9321405\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2022]]},"references-count":21,"URL":"https:\/\/doi.org\/10.1109\/access.2021.3051230","relation":{},"ISSN":["2169-3536"],"issn-type":[{"value":"2169-3536","type":"electronic"}],"subject":[],"published":{"date-parts":[[2022]]}}}