{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,19]],"date-time":"2026-02-19T14:40:32Z","timestamp":1771512032340,"version":"3.50.1"},"reference-count":28,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","license":[{"start":{"date-parts":[[2021,1,1]],"date-time":"2021-01-01T00:00:00Z","timestamp":1609459200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/legalcode"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Access"],"published-print":{"date-parts":[[2021]]},"DOI":"10.1109\/access.2021.3081993","type":"journal-article","created":{"date-parts":[[2021,5,19]],"date-time":"2021-05-19T20:50:20Z","timestamp":1621457420000},"page":"75608-75616","source":"Crossref","is-referenced-by-count":19,"title":["Line Protection Operate Time: How Fast Shall It Be?"],"prefix":"10.1109","volume":"9","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-4505-7401","authenticated-orcid":false,"given":"Sinisa","family":"Zubic","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Zoran","family":"Gajic","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-2357-2533","authenticated-orcid":false,"given":"Davor","family":"Kralj","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1109\/CPRE.2018.8349782"},{"key":"ref11","year":"2020","journal-title":"Line Distance Protection REL670 Version 2 2 ANSI&#x2014;Technical Manual ABB"},{"key":"ref12","year":"2021","journal-title":"SIPROTEC 5 Distance and Line Differential Protection Breaker Management for 1-Pole and 3-Pole"},{"key":"ref13","first-page":"1","article-title":"An experimental analysis of high-speed-distance protection","author":"dzienis","year":"2010","journal-title":"Proc Mod Electr Power Syst"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1109\/CPRE.2015.7102184"},{"key":"ref15","first-page":"1","article-title":"Preventing line faults with continuous monitoring based on current traveling waves","author":"kasztenny","year":"2020","journal-title":"Proc 15th Int Conf Develop Power Syst Protection"},{"key":"ref16","article-title":"Controlled switching of high voltage SF6 circuit breakers for fault interruption","author":"thomas","year":"2004"},{"key":"ref17","article-title":"Reliable fault clearance and back-up protection","author":"lindahl","year":"1999"},{"key":"ref18","first-page":"1","year":"2016","journal-title":"IEEE Guide for Breaker Failure Protection of Power Circuit Breakers"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1109\/TSTE.2018.2856938"},{"key":"ref28","first-page":"1","year":"2019","journal-title":"IEEE Guide for the Application of Transient Recovery Voltage for AC High-Voltage Circuit Breakers with Rated Maximum Voltage above 1000 V"},{"key":"ref4","article-title":"Synchronous ABB for one cycle interruption delivered to keeler substation, Bonneville Power Administration, U.S.A","volume":"19","author":"ohse","year":"1973","journal-title":"Fuji Electr Rev"},{"key":"ref27","first-page":"1","article-title":"A POTT scheme, using transient directional elements, for a complex 525 kV transmission corridor comprising long, heavily loaded and heavily series compensated parallel lines","author":"kockott","year":"2019","journal-title":"Proc Western Protective Relay Conf"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1109\/TPAS.1978.354714"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1109\/CICED.2014.6992256"},{"key":"ref5","year":"2021","journal-title":"Inertia and Rate of Change of Frequency (RoCoF)"},{"key":"ref8","year":"2006","journal-title":"IEEE Standard Rating Structure for AC High-Voltage Circuit Breaker"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2018.2883208"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1109\/TPAS.1980.319792"},{"key":"ref9","year":"2020","journal-title":"High-voltage Switchgear and Controlgear - Part 100 Alternating Current Circuitbreakers"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1109\/TPAS.1974.293847"},{"key":"ref20","author":"tsos","year":"2016","journal-title":"challenges and Opportunities for the Nordic Power System"},{"key":"ref22","doi-asserted-by":"publisher","DOI":"10.1016\/j.rser.2015.11.016"},{"key":"ref21","first-page":"391","article-title":"Frequency stability enhancement for a system with integrated renewable energy sources and HVDC link","author":"al talaq","year":"2020","journal-title":"Proc Int Seminar Appl Technol Inf Commun"},{"key":"ref24","first-page":"1","article-title":"Practical experience with ultra-high-speed line protective relays","author":"metzger","year":"2018","journal-title":"Proc 45th Annu Western Protective Relay Conf Spokane"},{"key":"ref23","doi-asserted-by":"publisher","DOI":"10.23919\/AEIT.2019.8893427"},{"key":"ref26","doi-asserted-by":"publisher","DOI":"10.1109\/IREP.2013.6629358"},{"key":"ref25","year":"2008","journal-title":"Protection System Reliability Redundancy of Protection System Elements"}],"container-title":["IEEE Access"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6287639\/9312710\/09435412.pdf?arnumber=9435412","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,12,17]],"date-time":"2021-12-17T19:56:13Z","timestamp":1639770973000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/9435412\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021]]},"references-count":28,"URL":"https:\/\/doi.org\/10.1109\/access.2021.3081993","relation":{},"ISSN":["2169-3536"],"issn-type":[{"value":"2169-3536","type":"electronic"}],"subject":[],"published":{"date-parts":[[2021]]}}}