{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,2,21]],"date-time":"2025-02-21T20:20:27Z","timestamp":1740169227867,"version":"3.37.3"},"reference-count":24,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","license":[{"start":{"date-parts":[[2021,1,1]],"date-time":"2021-01-01T00:00:00Z","timestamp":1609459200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by-nc-nd\/4.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Access"],"published-print":{"date-parts":[[2021]]},"DOI":"10.1109\/access.2021.3117979","type":"journal-article","created":{"date-parts":[[2021,10,5]],"date-time":"2021-10-05T04:25:24Z","timestamp":1633407924000},"page":"136721-136735","source":"Crossref","is-referenced-by-count":0,"title":["Research on Quantifiable Target Index System of Distribution Network Planning for Energy Internet"],"prefix":"10.1109","volume":"9","author":[{"ORCID":"https:\/\/orcid.org\/0000-0001-7709-8921","authenticated-orcid":false,"given":"Feng","family":"Wang","sequence":"first","affiliation":[{"name":"State Grid Hubei Electric Power Company Ltd., Wuhan, China"}]},{"given":"Bin","family":"Zhou","sequence":"additional","affiliation":[{"name":"State Grid Hubei Electric Power Company Ltd., Wuhan, China"}]},{"given":"Jizhou","family":"Hu","sequence":"additional","affiliation":[{"name":"State Grid Hubei Electric Power Company Ltd., Wuhan, China"}]},{"given":"Cheng","family":"Ye","sequence":"additional","affiliation":[{"name":"PowerChina Hubei Electric Engineering Company Ltd., Wuhan, China"}]}],"member":"263","reference":[{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1109\/EPDC.2015.7330508"},{"key":"ref11","first-page":"20","article-title":"Research on forecast model of power company main grid investment scale","volume":"3","author":"fang","year":"2016","journal-title":"China high-tech enterprises"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.3390\/su10010256"},{"key":"ref13","first-page":"9050","article-title":"A survey on investment demand assessment models for power grid infrastructure","volume":"9","author":"li","year":"2021","journal-title":"IEEE Access"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1109\/JSYST.2018.2850882"},{"key":"ref15","first-page":"77","article-title":"Techno economic evaluation of power grid planning","volume":"30","author":"chunhong","year":"2011","journal-title":"Technology and Economics"},{"key":"ref16","first-page":"54","article-title":"Comprehensive evaluation and decision of urban power grid planning based on interval analytic hierarchy process","volume":"24","author":"jun","year":"2004","journal-title":"Chin J Elect Eng"},{"key":"ref17","first-page":"1249","article-title":"Comprehensive method on evaluation of distribution network planning","author":"xiao","year":"2008","journal-title":"Proc Int Conf Electric Utility Deregulation Restructuring Power Technologies"},{"key":"ref18","first-page":"282","article-title":"Economic risk assessment of power grid planning project based on two-level fuzzy comprehensive evaluation","volume":"12","author":"tao","year":"2007","journal-title":"China Elect Power Educ"},{"key":"ref19","first-page":"81","article-title":"Evaluation method and case study of urban medium voltage distribution network","volume":"29","author":"jun","year":"2005","journal-title":"Power Grid Technol"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2016.2562680"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2017.2658952"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1007\/s40565-014-0095-6"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1109\/TPEL.2015.2417356"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1109\/IICSPI.2018.8690335"},{"key":"ref7","first-page":"2180","article-title":"Research on life-cycle comprehensive low-carbon benefits of wind power generation from distribution planning perspective","author":"zhang","year":"2020","journal-title":"Proc IEEE 4th Conf Energy Internet Energy Syst Integr (EI2)"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1109\/PES.2009.5275291"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2017.2668143"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2020.2989896"},{"key":"ref20","first-page":"105","article-title":"Research on post evaluation index system of DSM","volume":"6","author":"liang","year":"2011","journal-title":"China Elect Power Educ"},{"key":"ref22","first-page":"193","article-title":"Construction of smart grid evaluation index system","volume":"2","author":"jingmin","year":"2012","journal-title":"East China Electric Power"},{"key":"ref21","first-page":"24","article-title":"Smart grid evaluation based on anti entropy weight method","volume":"40","author":"rui","year":"2012","journal-title":"Power Syst Protection Control"},{"key":"ref24","first-page":"808","article-title":"A new method for determining the weight of interval reciprocal judgment matrix","volume":"6","author":"zulin","year":"2017","journal-title":"Math Prog A"},{"key":"ref23","doi-asserted-by":"publisher","DOI":"10.1109\/JSYST.2013.2269731"}],"container-title":["IEEE Access"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6287639\/9312710\/09558751.pdf?arnumber=9558751","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,9,8]],"date-time":"2022-09-08T20:10:37Z","timestamp":1662667837000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/9558751\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021]]},"references-count":24,"URL":"https:\/\/doi.org\/10.1109\/access.2021.3117979","relation":{},"ISSN":["2169-3536"],"issn-type":[{"type":"electronic","value":"2169-3536"}],"subject":[],"published":{"date-parts":[[2021]]}}}