{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,2,21]],"date-time":"2025-02-21T20:20:43Z","timestamp":1740169243684,"version":"3.37.3"},"reference-count":47,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","license":[{"start":{"date-parts":[[2021,1,1]],"date-time":"2021-01-01T00:00:00Z","timestamp":1609459200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/legalcode"},{"start":{"date-parts":[[2021,1,1]],"date-time":"2021-01-01T00:00:00Z","timestamp":1609459200000},"content-version":"am","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/legalcode"}],"funder":[{"DOI":"10.13039\/501100001809","name":"Key Project of the Natural Science Foundation of China","doi-asserted-by":"publisher","award":["U1865202","52039004"],"award-info":[{"award-number":["U1865202","52039004"]}],"id":[{"id":"10.13039\/501100001809","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Access"],"published-print":{"date-parts":[[2021]]},"DOI":"10.1109\/access.2021.3126764","type":"journal-article","created":{"date-parts":[[2021,11,8]],"date-time":"2021-11-08T22:35:42Z","timestamp":1636410942000},"page":"154524-154539","source":"Crossref","is-referenced-by-count":1,"title":["A Refined Load Distribution Method for Large Hydropower Stations With Multiple Units Considering Constraints of Substations"],"prefix":"10.1109","volume":"9","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-8350-3900","authenticated-orcid":false,"given":"Xiao","family":"Chen","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-0563-0090","authenticated-orcid":false,"given":"Jianzhong","family":"Zhou","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-2698-9115","authenticated-orcid":false,"given":"Benjun","family":"Jia","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref39","doi-asserted-by":"publisher","DOI":"10.1016\/j.energy.2017.09.131"},{"key":"ref38","doi-asserted-by":"publisher","DOI":"10.1007\/s10064-018-01440-8"},{"key":"ref33","doi-asserted-by":"publisher","DOI":"10.1109\/59.918302"},{"key":"ref32","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijepes.2012.07.023"},{"key":"ref31","doi-asserted-by":"publisher","DOI":"10.1016\/j.enconman.2013.07.047"},{"key":"ref30","doi-asserted-by":"publisher","DOI":"10.1016\/j.energy.2012.05.026"},{"key":"ref37","doi-asserted-by":"publisher","DOI":"10.1155\/2020\/6679317"},{"key":"ref36","first-page":"1914","article-title":"An integrated dispatching mode for daily generation scheduling and inner-plant economic operation of cascade hydropower plants","volume":"38","author":"lu","year":"2014","journal-title":"Dianwang Jishu Power Syst Technol"},{"key":"ref35","first-page":"1","article-title":"Real-time load-adjusting method of cascade hydropower plants considering hydrological regime-changing conditions","volume":"34","author":"zhou","year":"2015","journal-title":"Shuili Fadian Xuebao\/Journal of Hydroelectric Engineering"},{"key":"ref34","first-page":"110","article-title":"Practical method of in-plant economical operation of Xi-Luo-Du hydropower plant with large number of generator sets","volume":"35","author":"li","year":"2016","journal-title":"Shuili Fadian Xuebao\/Journal of Hydroelectric Engineering"},{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1016\/j.enconman.2009.07.020"},{"key":"ref40","doi-asserted-by":"publisher","DOI":"10.1016\/j.enconman.2012.08.024"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1109\/PTC.2005.4524670"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1109\/59.867163"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1049\/iet-gtd.2017.1257"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2016.2641390"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1016\/j.energy.2019.03.117"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1016\/j.jhydrol.2017.09.029"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1016\/j.enconman.2014.11.036"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1007\/s12667-015-0189-x"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2013.2288933"},{"key":"ref28","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2006.873410"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1002\/ep.13396"},{"key":"ref27","doi-asserted-by":"publisher","DOI":"10.1016\/j.epsr.2003.12.013"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2009.08.012"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1016\/j.jhydrol.2019.04.017"},{"key":"ref29","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijepes.2010.01.023"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1007\/s00202-019-00793-x"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1016\/j.jhydrol.2017.03.074"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2021.116828"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1016\/j.jenvman.2021.112958"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1007\/s11269-019-02435-0"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1007\/s11069-020-04469-9"},{"key":"ref46","doi-asserted-by":"publisher","DOI":"10.1051\/e3sconf\/202019900008"},{"key":"ref20","doi-asserted-by":"publisher","DOI":"10.1016\/j.enconman.2005.01.002"},{"key":"ref45","first-page":"88","article-title":"Neural network estimation methods for varying output coefficients of hydropower stations","volume":"40","author":"jia","year":"2021","journal-title":"Shuili Fadian Xuebao\/Journal of Hydroelectric Engineering"},{"key":"ref22","doi-asserted-by":"publisher","DOI":"10.1007\/s11269-006-9092-5"},{"key":"ref47","doi-asserted-by":"publisher","DOI":"10.1007\/s11269-017-1657-y"},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.1080\/1206212X.2016.1218241"},{"key":"ref42","doi-asserted-by":"publisher","DOI":"10.1109\/59.744500"},{"key":"ref24","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-35380-2_64"},{"key":"ref41","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2020.3005941"},{"key":"ref23","doi-asserted-by":"publisher","DOI":"10.1016\/j.enconman.2014.11.024"},{"key":"ref44","doi-asserted-by":"publisher","DOI":"10.1016\/j.jhydrol.2020.125556"},{"key":"ref26","doi-asserted-by":"publisher","DOI":"10.1109\/TEVC.2002.806788"},{"key":"ref43","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2016.2522469"},{"key":"ref25","doi-asserted-by":"crossref","first-page":"1465","DOI":"10.1007\/s11269-010-9755-0","article-title":"Optimization of multireservoir systems by genetic algorithm","volume":"25","author":"h?n\u00e7al","year":"2011","journal-title":"Water Resour Manage"}],"container-title":["IEEE Access"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6287639\/9312710\/09606912.pdf?arnumber=9606912","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,1,24]],"date-time":"2022-01-24T20:55:15Z","timestamp":1643057715000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/9606912\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021]]},"references-count":47,"URL":"https:\/\/doi.org\/10.1109\/access.2021.3126764","relation":{},"ISSN":["2169-3536"],"issn-type":[{"type":"electronic","value":"2169-3536"}],"subject":[],"published":{"date-parts":[[2021]]}}}