{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,29]],"date-time":"2026-04-29T22:15:15Z","timestamp":1777500915286,"version":"3.51.4"},"reference-count":40,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","license":[{"start":{"date-parts":[[2022,1,1]],"date-time":"2022-01-01T00:00:00Z","timestamp":1640995200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/legalcode"}],"funder":[{"DOI":"10.13039\/501100001809","name":"National Natural Science Foundation, China","doi-asserted-by":"publisher","award":["61973089"],"award-info":[{"award-number":["61973089"]}],"id":[{"id":"10.13039\/501100001809","id-type":"DOI","asserted-by":"publisher"}]},{"DOI":"10.13039\/501100012166","name":"National Key Research and Development Program, China","doi-asserted-by":"publisher","award":["2018YFB1802403"],"award-info":[{"award-number":["2018YFB1802403"]}],"id":[{"id":"10.13039\/501100012166","id-type":"DOI","asserted-by":"publisher"}]},{"DOI":"10.13039\/501100003453","name":"Guangdong Natural Science Foundation, China","doi-asserted-by":"publisher","award":["2022A1515011175"],"award-info":[{"award-number":["2022A1515011175"]}],"id":[{"id":"10.13039\/501100003453","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Access"],"published-print":{"date-parts":[[2022]]},"DOI":"10.1109\/access.2022.3179711","type":"journal-article","created":{"date-parts":[[2022,6,2]],"date-time":"2022-06-02T19:36:42Z","timestamp":1654198602000},"page":"61326-61341","source":"Crossref","is-referenced-by-count":5,"title":["A Queuing Network Model for Solving Facility Layout Problem in Multifloor Flow Shop"],"prefix":"10.1109","volume":"10","author":[{"ORCID":"https:\/\/orcid.org\/0000-0001-9705-1661","authenticated-orcid":false,"given":"Xiaopeng","family":"Liu","sequence":"first","affiliation":[{"name":"Key Laboratory of Computer Integrated Manufacturing System, Guangdong University of Technology, Guangzhou, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Huiyu","family":"Zhang","sequence":"additional","affiliation":[{"name":"Key Laboratory of Computer Integrated Manufacturing System, Guangdong University of Technology, Guangzhou, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-2140-551X","authenticated-orcid":false,"given":"Jun","family":"Lin","sequence":"additional","affiliation":[{"name":"China Electronic Product Reliability and Environmental Testing Research Institute, Guangzhou, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Xuanrui","family":"Chen","sequence":"additional","affiliation":[{"name":"Key Laboratory of Computer Integrated Manufacturing System, Guangdong University of Technology, Guangzhou, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Qingxin","family":"Chen","sequence":"additional","affiliation":[{"name":"Key Laboratory of Computer Integrated Manufacturing System, Guangdong University of Technology, Guangzhou, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ning","family":"Mao","sequence":"additional","affiliation":[{"name":"Key Laboratory of Computer Integrated Manufacturing System, Guangdong University of Technology, Guangzhou, China"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2017.03.015"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-017-0895-8"},{"key":"ref3","article-title":"Study on multi-floor facility layout problem based on M\/G\/1 lift handling system","author":"Chen","year":"2009"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2016.02.026"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2014.09.023"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1016\/j.compchemeng.2019.106573"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1016\/j.cherd.2020.10.020"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1016\/j.energy.2018.06.105"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1016\/j.apm.2020.10.032"},{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1002\/SERIES1345"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1287\/opre.30.1.125"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(87)80012-7"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1109\/TSE.1980.234493"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1002\/j.1538-7305.1983.tb03204.x"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(99)00018-1"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2003.09.002"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2016.1166286"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2017.1334975"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.2307\/3212352"},{"key":"ref20","doi-asserted-by":"publisher","DOI":"10.1016\/S0278-6125(99)80033-8"},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.1007\/s00291-004-0189-z"},{"key":"ref22","doi-asserted-by":"publisher","DOI":"10.1080\/07408170701745345"},{"key":"ref23","doi-asserted-by":"publisher","DOI":"10.1080\/07408178808966181"},{"key":"ref24","doi-asserted-by":"crossref","first-page":"91","DOI":"10.1023\/A:1018940310682","article-title":"A decomposition method for analyzing inhomogeneous assembly\/disassembly systems","volume":"93","author":"Gershwin","year":"2000","journal-title":"Ann. Oper. Res."},{"key":"ref25","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2005.01.025"},{"key":"ref26","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2006.12.016"},{"key":"ref27","doi-asserted-by":"publisher","DOI":"10.1007\/s10479-014-1639-x"},{"key":"ref28","doi-asserted-by":"publisher","DOI":"10.1007\/s11134-006-9396-4"},{"key":"ref29","doi-asserted-by":"publisher","DOI":"10.1080\/07408170701488086"},{"key":"ref30","doi-asserted-by":"publisher","DOI":"10.1007\/s10479-011-0870-y"},{"key":"ref31","doi-asserted-by":"publisher","DOI":"10.1080\/0740817X.2012.665201"},{"key":"ref32","doi-asserted-by":"publisher","DOI":"10.1109\/TASE.2013.2243910"},{"key":"ref33","doi-asserted-by":"publisher","DOI":"10.1109\/TASE.2012.2200676"},{"key":"ref34","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2013.12.002"},{"key":"ref35","doi-asserted-by":"publisher","DOI":"10.1007\/s10479-014-1665-8"},{"key":"ref36","doi-asserted-by":"publisher","DOI":"10.1287\/opre.16.3.651"},{"key":"ref37","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4615-0373-6_5","article-title":"Two-Moment approximations for throughput and mean queue length of a fork\/join station with general input processes","volume-title":"Stochastic Modeling and Optimization of Manufacturing Systems and Supply Chains","volume":"87","author":"Krishnamurthy","year":"2003"},{"key":"ref38","article-title":"Two-Moment approximations for the variability parameter of the departure process from a fork\/join station with general inputs","author":"Krishnamurthy","year":"2002"},{"key":"ref39","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2019.1685709"},{"key":"ref40","doi-asserted-by":"publisher","DOI":"10.1080\/05695557508975028"}],"container-title":["IEEE Access"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6287639\/9668973\/09786808.pdf?arnumber=9786808","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,2,1]],"date-time":"2024-02-01T02:37:18Z","timestamp":1706755038000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/9786808\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2022]]},"references-count":40,"URL":"https:\/\/doi.org\/10.1109\/access.2022.3179711","relation":{},"ISSN":["2169-3536"],"issn-type":[{"value":"2169-3536","type":"electronic"}],"subject":[],"published":{"date-parts":[[2022]]}}}