{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,2,21]],"date-time":"2025-02-21T20:21:51Z","timestamp":1740169311314,"version":"3.37.3"},"reference-count":39,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","license":[{"start":{"date-parts":[[2022,1,1]],"date-time":"2022-01-01T00:00:00Z","timestamp":1640995200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/legalcode"}],"funder":[{"DOI":"10.13039\/501100003787","name":"Natural Science Foundation of Hebei Province","doi-asserted-by":"publisher","award":["E2022202136"],"award-info":[{"award-number":["E2022202136"]}],"id":[{"id":"10.13039\/501100003787","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Access"],"published-print":{"date-parts":[[2022]]},"DOI":"10.1109\/access.2022.3197606","type":"journal-article","created":{"date-parts":[[2022,8,8]],"date-time":"2022-08-08T19:50:29Z","timestamp":1659988229000},"page":"84078-84093","source":"Crossref","is-referenced-by-count":0,"title":["A Production Scheduling Method for Resolving Multiple Equipment Operation Conflicts in Lithium Battery Mills"],"prefix":"10.1109","volume":"10","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-3299-9069","authenticated-orcid":false,"given":"Yanjun","family":"Xiao","sequence":"first","affiliation":[{"name":"Tianjin Key Laboratory of Power Transmission and Safety Technology for New Energy Vehicles, School of Mechanical Engineering, Hebei University of Technology, Tianjin, China"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-1572-8638","authenticated-orcid":false,"given":"Guoqing","family":"Ren","sequence":"additional","affiliation":[{"name":"School of Mechanical Engineering, Hebei University of Technology, Tianjin, China"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-7054-9141","authenticated-orcid":false,"given":"Shuhan","family":"Deng","sequence":"additional","affiliation":[{"name":"School of Mechanical Engineering, Hebei University of Technology, Tianjin, China"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-0054-158X","authenticated-orcid":false,"given":"Feng","family":"Wan","sequence":"additional","affiliation":[{"name":"School of Mechanical Engineering, Hebei University of Technology, Tianjin, China"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-2213-052X","authenticated-orcid":false,"given":"Peng","family":"Kai","sequence":"additional","affiliation":[{"name":"School of Mechanical Engineering, Hebei University of Technology, Tianjin, China"}]}],"member":"263","reference":[{"issue":"8","key":"ref1","first-page":"11","article-title":"Improved discrete firefly optimization algorithm for solving flexible job shop scheduling problems","author":"Zheng","year":"2021","journal-title":"Comput. Modernization"},{"issue":"3","key":"ref2","first-page":"6","article-title":"Hybrid Gray Wolf optimization algorithm solves flexible job shop scheduling problem","volume":"33","author":"Jiang","year":"2018","journal-title":"Control Decis. Making"},{"issue":"4","key":"ref3","first-page":"28","article-title":"Variable neighborhood search migratory bird optimization algorithm for flexible job shop scheduling","volume":"34","author":"Zhu","year":"2017","journal-title":"Microelectron. Comput."},{"issue":"2","key":"ref4","first-page":"111","article-title":"Improved simulated annealing algorithm for flexible job shop scheduling optimization","volume":"38","author":"Li","year":"2015","journal-title":"J. Wuhan Univ. Sci. Technol."},{"issue":"2","key":"ref5","first-page":"476","article-title":"Flexible job-shop scheduling optimization based on two-layer particle swarm optimization algorithm","volume":"35","author":"Kong","year":"2015","journal-title":"J. Comput. Appl."},{"issue":"3","key":"ref6","first-page":"159","article-title":"Flexible job shop scheduling based on improved artificial bee colony algorithm","author":"Wang","year":"2021","journal-title":"Combined Mach. Tools Automated Machining Technol."},{"issue":"12","key":"ref7","first-page":"3231","article-title":"Flexible job shop scheduling optimization method based on small habitat particle swarm algorithm","volume":"21","author":"Zhong","year":"2015","journal-title":"Comput. Integr. Manuf. Syst."},{"issue":"7","key":"ref8","first-page":"126","article-title":"Multi-objective optimization algorithm for flexible job shop scheduling based on energy consumption","volume":"43","author":"Zhang","year":"2020","journal-title":"Mod. Electron. Technol."},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.3390\/math7080688"},{"issue":"21","key":"ref10","first-page":"11","article-title":"A study of low carbon scheduling for flexible job shops considering lead times and critical targets","volume":"55","author":"Li","year":"2019","journal-title":"J. Mech. Eng."},{"article-title":"Study on the production planning and scheduling method of the heater-hot rolling section","year":"2014","author":"Hu","key":"ref11"},{"issue":"10","key":"ref12","first-page":"1960","article-title":"SPC-EA algorithm for smelting, casting and rolling integrated scheduling problem","volume":"26","author":"Zhang","year":"2019","journal-title":"Control Eng."},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1109\/tii.2019.2944247"},{"issue":"2","key":"ref14","first-page":"536","article-title":"A review of genetic algorithms for solving flexible job shop scheduling","volume":"28","author":"Huang","year":"2022","journal-title":"Comput. Integr. Manuf. Syst."},{"issue":"2","key":"ref15","first-page":"316","article-title":"Superheuristic genetic algorithm for solving fuzzy flexible job shop scheduling","volume":"37","author":"Li","year":"2020","journal-title":"Control Theory Appl."},{"issue":"22","key":"ref16","first-page":"6163","article-title":"Research on multi-objective flexible job shop scheduling based on immune genetic algorithm","author":"Zhao","year":"2008","journal-title":"J. Syst. Simul."},{"issue":"11","key":"ref17","doi-asserted-by":"crossref","first-page":"156","DOI":"10.3901\/JME.2010.11.156","article-title":"Multi-objective flexible job shop scheduling based on improved non-dominated ranking genetic algorithm","volume":"46","author":"Zhang","year":"2010","journal-title":"J. Mech. Eng."},{"issue":"7","key":"ref18","doi-asserted-by":"crossref","first-page":"145","DOI":"10.3901\/JME.2009.07.145","article-title":"Improved genetic algorithm for solving flexible job shop scheduling problem","volume":"45","author":"Zhang","year":"2009","journal-title":"J. Mech. Eng."},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1504\/IJCAT.2016.074454"},{"key":"ref20","doi-asserted-by":"publisher","DOI":"10.4028\/www.scientific.net\/AMR.186.546"},{"issue":"6","key":"ref21","first-page":"256","article-title":"Research application of RFID in discrete manufacturing","author":"Huang","year":"2014","journal-title":"Mach. Des. Manuf."},{"issue":"2","key":"ref22","first-page":"246","article-title":"Application of intelligent manufacturing technology in hot rolling production line\u2014Baosteel 1580 hot rolling demonstration production line","volume":"31","author":"Zhang","year":"2020","journal-title":"China Mech. Eng."},{"key":"ref23","doi-asserted-by":"publisher","DOI":"10.3901\/JME.2018.08.210"},{"issue":"2","key":"ref24","first-page":"9","article-title":"Research and application of microservice architecture for MES system based on edge computing","author":"Wang Ma","year":"2021","journal-title":"Instrum. Standardization Metrol."},{"issue":"15","key":"ref25","first-page":"34","article-title":"Intelligent workshop fault prediction and health management system based on 5G technology","author":"Feng","year":"2020","journal-title":"Electron. Fabr."},{"issue":"15","key":"ref26","first-page":"218","article-title":"Research on workshop equipment monitoring system based on edge computing","volume":"17","author":"Wang","year":"2021","journal-title":"Comput. Knowl. Technol."},{"issue":"10","key":"ref27","first-page":"149","article-title":"Optimized convolutional short and long memory hybrid neural network model based on genetic algorithm for photovoltaic power prediction","volume":"69","author":"Wang","year":"2020","journal-title":"Phys. Lett."},{"issue":"5","key":"ref28","doi-asserted-by":"crossref","first-page":"593","DOI":"10.15541\/jim20190213","article-title":"Improved genetic algorithm-based acoustic emission pattern recognition of C\/SiC tensile damage","volume":"35","author":"Zhang","year":"2020","journal-title":"J. Inorganic Mater."},{"issue":"2","key":"ref29","first-page":"148","article-title":"Improved simulated annealing algorithm for flexible scheduling","author":"Huang","year":"2018","journal-title":"Combined Mach. Tools Automated Machining Technol."},{"issue":"5","key":"ref30","first-page":"996","article-title":"Simulated annealing algorithm optimizes PSO-GA algorithm to solve flexible flow shop scheduling problem","volume":"41","author":"Jing","year":"2020","journal-title":"Miniature Microcomput. Syst."},{"key":"ref31","doi-asserted-by":"publisher","DOI":"10.3390\/su11020502"},{"issue":"10","key":"ref32","first-page":"1907","article-title":"Multi-objective optimization model and solution study of service quality in service computing","volume":"38","author":"Lin","year":"2015","journal-title":"J. Comput. Sci."},{"key":"ref33","doi-asserted-by":"publisher","DOI":"10.1109\/4235.996017"},{"key":"ref34","doi-asserted-by":"publisher","DOI":"10.1109\/tevc.2017.2778560"},{"key":"ref35","doi-asserted-by":"publisher","DOI":"10.12720\/jcm.11.9.879-885"},{"key":"ref36","doi-asserted-by":"publisher","DOI":"10.1109\/tfuzz.2018.2879789"},{"issue":"4","key":"ref37","first-page":"159","article-title":"Multi-objective hybrid flow shop scheduling considering lead time","volume":"25","author":"Zhu","year":"2020","journal-title":"Ind. Eng. Manag."},{"key":"ref38","doi-asserted-by":"publisher","DOI":"10.1142\/S0219686720500018"},{"key":"ref39","doi-asserted-by":"publisher","DOI":"10.3390\/math7050384"}],"container-title":["IEEE Access"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6287639\/9668973\/09852437.pdf?arnumber=9852437","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,3,2]],"date-time":"2024-03-02T04:37:51Z","timestamp":1709354271000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/9852437\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2022]]},"references-count":39,"URL":"https:\/\/doi.org\/10.1109\/access.2022.3197606","relation":{},"ISSN":["2169-3536"],"issn-type":[{"type":"electronic","value":"2169-3536"}],"subject":[],"published":{"date-parts":[[2022]]}}}