{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,15]],"date-time":"2026-05-15T20:40:46Z","timestamp":1778877646242,"version":"3.51.4"},"reference-count":59,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","license":[{"start":{"date-parts":[[2022,1,1]],"date-time":"2022-01-01T00:00:00Z","timestamp":1640995200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/legalcode"}],"funder":[{"DOI":"10.13039\/501100002873","name":"Ratchadaphiseksomphot Endowment Fund of Chulalongkorn University","doi-asserted-by":"publisher","id":[{"id":"10.13039\/501100002873","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Access"],"published-print":{"date-parts":[[2022]]},"DOI":"10.1109\/access.2022.3200484","type":"journal-article","created":{"date-parts":[[2022,8,19]],"date-time":"2022-08-19T19:32:38Z","timestamp":1660937558000},"page":"89614-89633","source":"Crossref","is-referenced-by-count":14,"title":["P2P Energy Trading: An Optimal Solution for Energy Shortage in Pakistan"],"prefix":"10.1109","volume":"10","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-0354-2502","authenticated-orcid":false,"given":"Waqas","family":"Amin","sequence":"first","affiliation":[{"name":"Department of Electronics and Power Engineering, PN Engineering College, National University of Sciences &#x0026; Technology, Karachi, Pakistan"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Fayyaz","family":"Ahmad","sequence":"additional","affiliation":[{"name":"Department of Electronics and Power Engineering, PN Engineering College, National University of Sciences &#x0026; Technology, Karachi, Pakistan"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Khalid","family":"Umer","sequence":"additional","affiliation":[{"name":"Sichuan Provincial Key Laboratory of Power System Wide-Area Measurement and Control, School of Mechanical and Electrical Engineering, University of Electronic Science and Technology of China, Chengdu, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Arsalan Habib","family":"Khawaja","sequence":"additional","affiliation":[{"name":"Department of Avionics Engineering, Institute of Space Technology, Islamabad, Pakistan"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-6635-2426","authenticated-orcid":false,"given":"Muhammad","family":"Afzal","sequence":"additional","affiliation":[{"name":"Sichuan Provincial Key Laboratory of Power System Wide-Area Measurement and Control, School of Mechanical and Electrical Engineering, University of Electronic Science and Technology of China, Chengdu, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Syed Adrees","family":"Ahmed","sequence":"additional","affiliation":[{"name":"Sichuan Provincial Key Laboratory of Power System Wide-Area Measurement and Control, School of Mechanical and Electrical Engineering, University of Electronic Science and Technology of China, Chengdu, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-4194-3342","authenticated-orcid":false,"given":"Surachai","family":"Chaitusaney","sequence":"additional","affiliation":[{"name":"Department of Electrical Engineering, Faculty of Engineering, Chulalongkorn University, Bangkok, Thailand"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1353\/jda.2008.0009"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1016\/j.rser.2016.11.152"},{"key":"ref3","volume-title":"Pakistan\u2019s interminable energy crisis: Is there any way out?","author":"Kugelman","year":"2015"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1596\/978-1-4648-1154-8"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1016\/j.enpol.2012.12.005"},{"key":"ref6","volume-title":"Power Load-Shedding. OBSERVER, Pakistan.2017","author":"Khan"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1016\/j.rser.2017.01.097"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1016\/j.rser.2014.12.015"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.6000\/1927-5129.2018.14.13"},{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2010.2045906"},{"key":"ref11","volume-title":"Conversiontocoal-Firedpowergeneration","author":"Siddiqui"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1016\/j.rser.2015.04.012"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.30541\/v52i4Ipp.479-492"},{"issue":"3","key":"ref14","first-page":"11","article-title":"Electricity infrastructure in Pakistan: An overview","volume":"4","author":"Ullah","year":"2013","journal-title":"Int. J. Energy, Inf. Commun."},{"issue":"9","key":"ref15","first-page":"458","article-title":"Feasibility study of Kalabagh dam Pakistan","volume":"11","author":"Khan","year":"2014","journal-title":"Life Sci. J."},{"key":"ref16","volume-title":"Pakistan\u2019s Power Crisis","author":"Aziz","year":"2015"},{"key":"ref17","volume-title":"Pakistan\u2019s Air Pollution Challenge and Potential for Longer Lives"},{"key":"ref18","volume-title":"Power crisis in Pakistan: A crisis in governance?","author":"Malik","year":"2012"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1016\/b978-0-12-800845-4.00006-9"},{"key":"ref20","doi-asserted-by":"publisher","DOI":"10.1016\/j.esr.2018.04.004"},{"key":"ref21","volume-title":"25 Energy Efficiency Policy Recommendations","year":"2011"},{"key":"ref22","volume-title":"Draft Energy Wheeling Policy","year":"2015"},{"key":"ref23","volume-title":"Draft and Rules of Net Metering","year":"2014"},{"key":"ref24","doi-asserted-by":"publisher","DOI":"10.1016\/j.egyr.2018.04.002"},{"key":"ref25","doi-asserted-by":"publisher","DOI":"10.1016\/j.rser.2017.05.040"},{"key":"ref26","doi-asserted-by":"publisher","DOI":"10.1016\/j.energy.2015.10.103"},{"key":"ref27","doi-asserted-by":"publisher","DOI":"10.1016\/j.rser.2015.12.232"},{"key":"ref28","doi-asserted-by":"publisher","DOI":"10.1016\/j.egypro.2014.12.015"},{"key":"ref29","volume-title":"Lahore Electric Power Supply Company","year":"2015"},{"key":"ref30","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2022.3182240"},{"key":"ref31","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2020.2975233"},{"key":"ref32","doi-asserted-by":"publisher","DOI":"10.1016\/j.epsr.2020.106278"},{"key":"ref33","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijepes.2020.106307"},{"key":"ref34","doi-asserted-by":"publisher","DOI":"10.1016\/j.egyr.2021.05.037"},{"key":"ref35","doi-asserted-by":"publisher","DOI":"10.1016\/j.epsr.2020.106488"},{"key":"ref36","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2021.117075"},{"key":"ref37","doi-asserted-by":"publisher","DOI":"10.1016\/B978-0-323-91698-1.00014-5"},{"key":"ref38","doi-asserted-by":"publisher","DOI":"10.1002\/lpor.202100458"},{"key":"ref39","doi-asserted-by":"publisher","DOI":"10.1002\/aenm.201900664"},{"key":"ref40","doi-asserted-by":"publisher","DOI":"10.1002\/lpor.202100202"},{"key":"ref41","doi-asserted-by":"publisher","DOI":"10.1039\/C9TA08314F"},{"key":"ref42","doi-asserted-by":"publisher","DOI":"10.1016\/j.xcrp.2022.100827"},{"issue":"1","key":"ref43","first-page":"1","article-title":"Minimization of power loss in distribution networks by different techniques","volume":"2","author":"Ramesh","year":"2009","journal-title":"Int. J. Electr. Power Energy Syst. Eng."},{"key":"ref44","doi-asserted-by":"publisher","DOI":"10.3390\/en9050348"},{"key":"ref45","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2011.2105287"},{"key":"ref46","volume-title":"Monthly Weather Forecast and Climate Lahore, Pakistan"},{"key":"ref47","doi-asserted-by":"publisher","DOI":"10.1016\/j.epsr.2016.06.019"},{"key":"ref48","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2014.09.060"},{"key":"ref49","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2017.2751258"},{"key":"ref50","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2019.113687"},{"key":"ref51","doi-asserted-by":"publisher","DOI":"10.1016\/j.procs.2019.04.050"},{"key":"ref52","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2019.113604"},{"key":"ref53","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2019.03.094"},{"key":"ref54","doi-asserted-by":"publisher","DOI":"10.1016\/j.apm.2019.06.001"},{"key":"ref55","volume-title":"How to Calculate the Annual Solar Energy Output of a Photovoltaic System?"},{"key":"ref56","volume-title":"CSIRO. Future Energy Storage Trends\u2014An Assessment of the Economic Viability, Potential Uptake and Impacts of Electrical Energy Storage on the NEM 2015\u20132035","year":"2015"},{"key":"ref57","doi-asserted-by":"publisher","DOI":"10.1109\/TCSS.2017.2788922"},{"key":"ref58","doi-asserted-by":"publisher","DOI":"10.1109\/PVSC.2005.1488451"},{"key":"ref59","first-page":"2243","article-title":"Understanding temperature effects on PV system performance","volume-title":"Proc. 3rd World Conf. Photovoltaic Energy Convers.","volume":"3","author":"Nordmann"}],"container-title":["IEEE Access"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6287639\/9668973\/09863862.pdf?arnumber=9863862","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,3,14]],"date-time":"2024-03-14T02:18:57Z","timestamp":1710382737000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/9863862\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2022]]},"references-count":59,"URL":"https:\/\/doi.org\/10.1109\/access.2022.3200484","relation":{},"ISSN":["2169-3536"],"issn-type":[{"value":"2169-3536","type":"electronic"}],"subject":[],"published":{"date-parts":[[2022]]}}}