{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,20]],"date-time":"2026-02-20T20:13:23Z","timestamp":1771618403638,"version":"3.50.1"},"reference-count":26,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","license":[{"start":{"date-parts":[[2023,1,1]],"date-time":"2023-01-01T00:00:00Z","timestamp":1672531200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by-nc-nd\/4.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Access"],"published-print":{"date-parts":[[2023]]},"DOI":"10.1109\/access.2023.3251411","type":"journal-article","created":{"date-parts":[[2023,3,2]],"date-time":"2023-03-02T18:25:46Z","timestamp":1677781546000},"page":"21554-21561","source":"Crossref","is-referenced-by-count":8,"title":["Increasing Transmitted Power With Cost Mitigation via Modified EHV Power Lines in Egyptian Grid"],"prefix":"10.1109","volume":"11","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-0273-3251","authenticated-orcid":false,"given":"Ahmed Taleb","family":"Mohamed","sequence":"first","affiliation":[{"name":"Faculty of Engineering, Cairo University, Giza, Egypt"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ahdab","family":"El-Morshedy","sequence":"additional","affiliation":[{"name":"Faculty of Engineering, Cairo University, Giza, Egypt"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-3151-9967","authenticated-orcid":false,"given":"Elsayed","family":"Tag-Eldin","sequence":"additional","affiliation":[{"name":"Faculty of Engineering and Technology, Future University in Egypt, New Cairo, Egypt"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ahmed","family":"Emam","sequence":"additional","affiliation":[{"name":"Faculty of Engineering, Cairo University, Giza, Egypt"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Mohamed Mahmoud","family":"Samy","sequence":"additional","affiliation":[{"name":"Faculty of Engineering, Beni-Suef University, Beni Suef, Egypt"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref1","volume-title":"Guide to the conversion of existing AC lines to DC operation","author":"Lundquist","year":"2014"},{"key":"ref2","volume-title":"Increasing capacity of overhead transmission lines needs and solutions","author":"Pramayon","year":"2010"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1109\/MEPCON50283.2021.9686265"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1109\/MEPCON47431.2019.9008197"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.21608\/iceeng.2008.34353"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2022.3161932"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1109\/TDEI.2013.6451341"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1109\/peoco.2010.5559173"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1049\/cp.2010.0920"},{"key":"ref10","article-title":"Analysis on the possible conversion of overhead lines from AC to DC","volume-title":"Proc. Cigre","volume":"2","author":"Colla"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1016\/j.epsr.2011.01.020"},{"key":"ref12","first-page":"4","article-title":"Converting ac power lines to DC for higher transmission ratings","author":"H\u00e4usler","year":"1997","journal-title":"ABB Rev."},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2020.2988195"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1073\/pnas.1905656116"},{"key":"ref15","volume-title":"Technical and economic incentives for AC to DC line conversion","author":"Adapa","year":"2010"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1109\/MEPCON.2017.8301345"},{"key":"ref17","volume-title":"HVDC (High Voltage Direct Current)","year":"2022"},{"key":"ref18","volume-title":"Overhead Conductor Manual","author":"Thrash","year":"2007"},{"key":"ref19","volume-title":"Environmental and Social Impact Assessment (ESIA) for 6th of October 500 Substation and its Interconnecting Overhead Transmission Lines","year":"2020"},{"key":"ref20","first-page":"35","volume-title":"Capital costs for transmission and substations","author":"Pletka","year":"2014"},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.1201\/b17055"},{"key":"ref22","doi-asserted-by":"publisher","DOI":"10.1109\/61.103755"},{"key":"ref23","volume-title":"Direct Current Transmission","volume":"1","author":"Kimbark","year":"1971"},{"key":"ref24","doi-asserted-by":"publisher","DOI":"10.1109\/MPAE.2007.329194"},{"key":"ref25","volume-title":"Transmission Cost Estimation Guide for MTEP21","year":"2021"},{"key":"ref26","volume-title":"Financial Accounting: An Introduction to Concepts, Methods and Uses","author":"Weil","year":"2013"}],"container-title":["IEEE Access"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6287639\/10005208\/10057393.pdf?arnumber=10057393","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,3,3]],"date-time":"2024-03-03T00:02:52Z","timestamp":1709424172000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/10057393\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023]]},"references-count":26,"URL":"https:\/\/doi.org\/10.1109\/access.2023.3251411","relation":{},"ISSN":["2169-3536"],"issn-type":[{"value":"2169-3536","type":"electronic"}],"subject":[],"published":{"date-parts":[[2023]]}}}