{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,27]],"date-time":"2026-03-27T16:45:43Z","timestamp":1774629943352,"version":"3.50.1"},"reference-count":23,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","license":[{"start":{"date-parts":[[2023,1,1]],"date-time":"2023-01-01T00:00:00Z","timestamp":1672531200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by-nc-nd\/4.0\/"}],"funder":[{"DOI":"10.13039\/501100001809","name":"National Natural Science Foundation of China","doi-asserted-by":"publisher","award":["U1804149"],"award-info":[{"award-number":["U1804149"]}],"id":[{"id":"10.13039\/501100001809","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Access"],"published-print":{"date-parts":[[2023]]},"DOI":"10.1109\/access.2023.3260097","type":"journal-article","created":{"date-parts":[[2023,3,21]],"date-time":"2023-03-21T20:05:02Z","timestamp":1679429102000},"page":"29380-29390","source":"Crossref","is-referenced-by-count":2,"title":["Three Phase Linear State Estimation Method of Substation Based on Zero Impedance Model"],"prefix":"10.1109","volume":"11","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-4970-4557","authenticated-orcid":false,"given":"Jifang","family":"Li","sequence":"first","affiliation":[{"name":"School of Electric Power, North China University of Water Resources and Electric Power, Zhengzhou, China"}]},{"ORCID":"https:\/\/orcid.org\/0009-0003-5987-2719","authenticated-orcid":false,"given":"Lidong","family":"Ma","sequence":"additional","affiliation":[{"name":"School of Electric Power, North China University of Water Resources and Electric Power, Zhengzhou, China"}]},{"given":"Shuo","family":"Feng","sequence":"additional","affiliation":[{"name":"School of Electric Power, North China University of Water Resources and Electric Power, Zhengzhou, China"}]},{"given":"Xiaoyang","family":"Shi","sequence":"additional","affiliation":[{"name":"School of Electric Power, North China University of Water Resources and Electric Power, Zhengzhou, China"}]},{"given":"Fangyuxuan","family":"Song","sequence":"additional","affiliation":[{"name":"State Grid Henan DC Center, Zhengzhou, China"}]}],"member":"263","reference":[{"key":"ref1","volume-title":"Power System State Estimation","author":"Chen","year":"2021"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1201\/9780203913673"},{"issue":"14","key":"ref3","first-page":"132","article-title":"A method for locating fault sections in distribution networks based on the comparison of state estimation residual errors","volume":"49","author":"Wang","year":"2021","journal-title":"Power Syst. Protection Control"},{"issue":"5","key":"ref4","first-page":"138","article-title":"Power system state estimation based on fuzzy tree method","volume":"47","author":"Yue","year":"2019","journal-title":"Power Syst. Protection Control"},{"issue":"7","key":"ref5","first-page":"1","article-title":"Preliminary study on an energy storage grid for future power system in China","volume":"50","author":"Jinyu","year":"2022","journal-title":"Power Syst. Protection Control"},{"issue":"1","key":"ref6","first-page":"148","article-title":"Realization of steady state modeling of unified power flow controller in a control system","volume":"50","author":"Luo","year":"2022","journal-title":"Power Syst. Protection Control"},{"issue":"25","key":"ref7","first-page":"73","article-title":"Zero impedance branch based substation three-phase nonlinear state estimation method","volume":"31","author":"Li","year":"2011","journal-title":"Proc. CSEE"},{"issue":"12","key":"ref8","first-page":"56","article-title":"Application and benefit analysis of substation state estimation","volume":"40","author":"Li","year":"2012","journal-title":"Power Syst. Protection Control"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1186\/s41601-020-00164-w"},{"issue":"1","key":"ref10","first-page":"1","article-title":"Topology error identification based on synchronized measurements for power network","volume":"32","author":"Zengping","year":"2012","journal-title":"Electr. Power Autom. Equip."},{"issue":"1","key":"ref11","first-page":"79","article-title":"Network topology analysis by solving equations","volume":"32","author":"Yao","year":"2012","journal-title":"Electr. Power Automat. Equip."},{"issue":"5","key":"ref12","first-page":"10","article-title":"Isolated power network topology analysis and its application in service restoration","volume":"25","author":"Xiuxia","year":"2005","journal-title":"Electr. Power Autom. Equip."},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1109\/hicss.2008.127"},{"issue":"7","key":"ref14","first-page":"44","article-title":"Substation-dispatch center two-level distributed state estimation","volume":"36","author":"Li","year":"2012","journal-title":"Autom. Electr. Power Syst."},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1109\/ptc.2019.8810449"},{"issue":"5","key":"ref16","first-page":"105","article-title":"State estimation based on PMU measurements considering zero-impedance characteristics of circuit breaker","volume":"34","author":"Chen","year":"2014","journal-title":"Electr. Power Automat. Equip."},{"issue":"7","key":"ref17","first-page":"1810","article-title":"Research on detection technology of bad quality data in digital substation","volume":"48","author":"Huang","year":"2020","journal-title":"Comput. Digit. Eng."},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1109\/tdc.2018.8440269"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1049\/iet-gtd.2020.0487"},{"key":"ref20","doi-asserted-by":"publisher","DOI":"10.1109\/pesgm.2015.7285677"},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.1109\/tpwrd.2019.2905426"},{"key":"ref22","first-page":"27","article-title":"The research on estimation algorithm with residual constraints And r,wN>method of data processing","author":"Jiandong","year":"1998"},{"issue":"7","key":"ref23","first-page":"1549","article-title":"Substation zero impedance network observability analysis considering ampere measurement","volume":"35","author":"Li","year":"2015","journal-title":"Proc. CSEE"}],"container-title":["IEEE Access"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6287639\/10005208\/10077605.pdf?arnumber=10077605","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,2,13]],"date-time":"2024-02-13T17:52:21Z","timestamp":1707846741000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/10077605\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023]]},"references-count":23,"URL":"https:\/\/doi.org\/10.1109\/access.2023.3260097","relation":{},"ISSN":["2169-3536"],"issn-type":[{"value":"2169-3536","type":"electronic"}],"subject":[],"published":{"date-parts":[[2023]]}}}