{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,25]],"date-time":"2026-01-25T16:18:01Z","timestamp":1769357881520,"version":"3.49.0"},"reference-count":49,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","license":[{"start":{"date-parts":[[2023,1,1]],"date-time":"2023-01-01T00:00:00Z","timestamp":1672531200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by-nc-nd\/4.0\/"}],"funder":[{"DOI":"10.13039\/501100012166","name":"National Key Research and Development Program of China","doi-asserted-by":"publisher","award":["2018YFB1308102"],"award-info":[{"award-number":["2018YFB1308102"]}],"id":[{"id":"10.13039\/501100012166","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Access"],"published-print":{"date-parts":[[2023]]},"DOI":"10.1109\/access.2023.3293029","type":"journal-article","created":{"date-parts":[[2023,7,7]],"date-time":"2023-07-07T18:38:15Z","timestamp":1688755095000},"page":"70652-70667","source":"Crossref","is-referenced-by-count":3,"title":["Research on the Integration and Scheduling of AGVs and Machines in Sample Testing Laboratory"],"prefix":"10.1109","volume":"11","author":[{"ORCID":"https:\/\/orcid.org\/0000-0001-8005-6458","authenticated-orcid":false,"given":"Hongtao","family":"Tang","sequence":"first","affiliation":[{"name":"College of Mechanical Engineering, Zhejiang University of Technology, Hangzhou, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jiawei","family":"Wang","sequence":"additional","affiliation":[{"name":"College of Mechanical Engineering, Zhejiang University of Technology, Hangzhou, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0009-0004-4111-0086","authenticated-orcid":false,"given":"Zhixiong","family":"Yang","sequence":"additional","affiliation":[{"name":"Jiaxing Sudoku Bridge Technology Company Ltd., Jiaxing, China"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1111\/ijlh.13163"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1128\/JCM.00500-18"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1016\/j.cll.2022.09.002"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1007\/s10096-018-3391-7"},{"key":"ref11","first-page":"1","article-title":"Total lab automation takes teamwork","volume":"41","author":"peck-palmer","year":"2009","journal-title":"Medical Laboratory Observer"},{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1287\/opre.46.6.820"},{"key":"ref17","first-page":"438","article-title":"Integrated scheduling of multiple automated guided vehicles and machines in flexible job shop","volume":"30","author":"he","year":"2019","journal-title":"Chinese Journal of Mechanical Engineering"},{"key":"ref16","first-page":"1","article-title":"Research status of integrated scheduling problem of automatic guide vehicle and machine","volume":"59","author":"wu","year":"2022","journal-title":"Comput Eng Appl"},{"key":"ref19","first-page":"97","article-title":"Cluster genetic algorithm for multi-objective integrated scheduling of automatic guided vehicles and processing equipment","volume":"33","author":"zhou","year":"2021","journal-title":"Chinese Journal of Mechanical Engineering"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2019.2919109"},{"key":"ref46","doi-asserted-by":"publisher","DOI":"10.1080\/00207549308956904"},{"key":"ref45","doi-asserted-by":"publisher","DOI":"10.1016\/j.physa.2021.125990"},{"key":"ref48","first-page":"2198","article-title":"An improved iterative local search algorithm for flexible job shop scheduling problem with multiple AGVs","volume":"28","author":"hu","year":"2022","journal-title":"Comput Ind Eng"},{"key":"ref47","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2004.07.009"},{"key":"ref42","doi-asserted-by":"publisher","DOI":"10.1109\/ICEC.1996.542332"},{"key":"ref41","doi-asserted-by":"publisher","DOI":"10.1016\/0360-8352(96)00053-8"},{"key":"ref44","doi-asserted-by":"publisher","DOI":"10.4108\/ICST.BROADNETS2009.7249"},{"key":"ref43","first-page":"210","article-title":"On using genetic algorithms to search program spaces","author":"jong","year":"1987","journal-title":"Genetic Algorithms Their Appl"},{"key":"ref49","first-page":"55","article-title":"Integrated AGV and machine scheduling method based on discrete whale optimization algorithm","volume":"45","author":"zhou","year":"2022","journal-title":"J Chongqing Univ"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1007\/s10916-014-0162-6"},{"key":"ref7","doi-asserted-by":"crossref","first-page":"1953","DOI":"10.4155\/bio.13.181","article-title":"Ask the experts: Automation: Part I","volume":"5","author":"allinson","year":"2013","journal-title":"Bioanalysis"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.4081\/jphr.2017.881"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1093\/clinchem\/46.5.751"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1177\/2211068211430186"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.5858\/2007-131-1063-SAFTCC"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1016\/S0009-8981(03)00020-2"},{"key":"ref40","doi-asserted-by":"publisher","DOI":"10.1287\/opre.43.6.1058"},{"key":"ref35","first-page":"938","article-title":"Flexible job shop AGV fusion scheduling method based on HGWOA","volume":"32","author":"li","year":"2021","journal-title":"Chinese Journal of Mechanical Engineering"},{"key":"ref34","doi-asserted-by":"publisher","DOI":"10.1016\/j.knosys.2022.109962"},{"key":"ref37","first-page":"2219","article-title":"Improved flower pollination algorithm for job shop scheduling problem integrated with AGVs","volume":"25","author":"liu","year":"2019","journal-title":"Comput Integr Manuf Syst"},{"key":"ref36","doi-asserted-by":"publisher","DOI":"10.1016\/j.knosys.2022.108315"},{"key":"ref31","doi-asserted-by":"publisher","DOI":"10.1016\/j.engappai.2021.104307"},{"key":"ref30","doi-asserted-by":"publisher","DOI":"10.1016\/j.rcim.2019.04.006"},{"key":"ref33","doi-asserted-by":"publisher","DOI":"10.1016\/j.swevo.2021.100992"},{"key":"ref32","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2022.117256"},{"key":"ref2","first-page":"99","article-title":"Enhancing laboratory efficiency with total laboratory automation","volume":"3","author":"tong","year":"2019","journal-title":"Clinical Chemistry and Laboratory Medicine"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.11622\/smedj.2018136"},{"key":"ref39","first-page":"536","article-title":"A review of genetic algorithms for flexible job-shop scheduling","volume":"28","author":"huang","year":"2022","journal-title":"Comput Integr Manuf Syst"},{"key":"ref38","first-page":"611","article-title":"Investigation and analysis of laboratory turnover time of routine blood samples in emergency hospital","volume":"12","author":"liu","year":"2015","journal-title":"Laboratory medicine and clinical practice"},{"key":"ref24","first-page":"692","article-title":"Research on collaborative scheduling of customized workshop production and logistics","volume":"45","author":"ge","year":"2021","journal-title":"J Nanjing Univ Sci Technol"},{"key":"ref23","first-page":"2241","article-title":"Application of improved adaptive genetic algorithm in multi-load AGV scheduling","volume":"42","author":"liu","year":"2021","journal-title":"Mini Microcomput Syst"},{"key":"ref26","first-page":"278","article-title":"Research on multi-objective flexible job shop scheduling based on multi-AGVs and machine integration","volume":"59","author":"ma","year":"2023","journal-title":"Comput Eng Appl"},{"key":"ref25","first-page":"2840","article-title":"Anti-deadlock task scheduling of multi-load automatic guided vehicle system considering task travel time","volume":"32","author":"wu","year":"2021","journal-title":"Chinese Journal of Mechanical Engineering"},{"key":"ref20","first-page":"73","article-title":"Flexible job shop machine and AGV planning based on hybrid genetic algorithm","volume":"58","author":"deng","year":"2021","journal-title":"J Sichuan Univ"},{"key":"ref22","first-page":"2872","article-title":"Consider the job shop scheduling problem of charged multi-AGVs","volume":"27","author":"li","year":"2021","journal-title":"Comput Integr Manuf Syst"},{"key":"ref21","first-page":"938","article-title":"Fusion scheduling method of flexible job shop automatic guide vehicle based on hybrid genetic whale optimization algorithm","volume":"32","author":"li","year":"2021","journal-title":"Chinese Journal of Mechanical Engineering"},{"key":"ref28","first-page":"97","article-title":"Clustering genetic algorithm for multi-objective integrated scheduling of AGVs and machine","volume":"33","author":"zou","year":"2022","journal-title":"Chinese Journal of Mechanical Engineering"},{"key":"ref27","doi-asserted-by":"publisher","DOI":"10.1007\/s10898-021-00992-6"},{"key":"ref29","first-page":"95","article-title":"Research on flexible shop scheduling based on improved hybrid genetic","volume":"26","author":"yuan","year":"2021","journal-title":"Ind Eng Manag"}],"container-title":["IEEE Access"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6287639\/10005208\/10175867.pdf?arnumber=10175867","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,8,14]],"date-time":"2023-08-14T18:00:09Z","timestamp":1692036009000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/10175867\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023]]},"references-count":49,"URL":"https:\/\/doi.org\/10.1109\/access.2023.3293029","relation":{},"ISSN":["2169-3536"],"issn-type":[{"value":"2169-3536","type":"electronic"}],"subject":[],"published":{"date-parts":[[2023]]}}}