{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,14]],"date-time":"2026-02-14T10:33:43Z","timestamp":1771065223091,"version":"3.50.1"},"reference-count":27,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","license":[{"start":{"date-parts":[[2023,1,1]],"date-time":"2023-01-01T00:00:00Z","timestamp":1672531200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by-nc-nd\/4.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Access"],"published-print":{"date-parts":[[2023]]},"DOI":"10.1109\/access.2023.3325671","type":"journal-article","created":{"date-parts":[[2023,10,18]],"date-time":"2023-10-18T17:55:13Z","timestamp":1697651713000},"page":"116141-116152","source":"Crossref","is-referenced-by-count":6,"title":["A Hybrid Model for Short-Term Load Forecasting Based on Novel Input Sequence Selection and CSO Optimized Depth Belief Network"],"prefix":"10.1109","volume":"11","author":[{"ORCID":"https:\/\/orcid.org\/0000-0001-9935-6135","authenticated-orcid":false,"given":"Wang","family":"Yanan","sequence":"first","affiliation":[{"name":"School of Computer Science and Technology, Dongguan University of Technology, Dongguan, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-8512-2079","authenticated-orcid":false,"given":"Wu","family":"Jiekang","sequence":"additional","affiliation":[{"name":"School of Automation, Guangdong University of Technology, Guangzhou, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Lei","family":"Zhen","sequence":"additional","affiliation":[{"name":"School of Automation, Guangdong University of Technology, Guangzhou, China"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2018.10.078"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1109\/59.910780"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1016\/j.renene.2018.07.060"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2020.116328"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.12677\/SG.2018.82014"},{"issue":"3","key":"ref6","first-page":"768","article-title":"Short-term power load probability density prediction method based on real-time electricity price and support vector quantile regression","volume":"37","author":"He","year":"2017","journal-title":"Proc. CSEE"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2020.115332"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2011.2174659"},{"issue":"12","key":"ref9","first-page":"50","article-title":"Power system short-term load forecasting based on improved random forest with grey relation projection","volume":"39","author":"Wu","year":"2015","journal-title":"Automat. Electr. Power Syst."},{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1080\/0952813X.2013.782351"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2013.2269803"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1109\/PESS.2002.1043533"},{"issue":"8","key":"ref13","first-page":"18","article-title":"A load forecasting method of cloud platform based on BP neural network and genetic algorithm","volume":"38","author":"Jun-Wei","year":"2017","journal-title":"Comput. Eng. Softw."},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2019.01.127"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.4028\/www.scientific.net\/KEM.474-476.1326"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.3390\/en9020070"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1016\/j.enbuild.2020.109921"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1016\/j.procs.2017.05.070"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2017.05.073"},{"key":"ref20","doi-asserted-by":"publisher","DOI":"10.1109\/BIGCOMP.2019.8679194"},{"issue":"5","key":"ref21","first-page":"133","article-title":"Short-term load forecasting method based on deep belief network","volume":"42","author":"Xiangyu","year":"2018","journal-title":"Power Syst. Autom."},{"issue":"14","key":"ref22","first-page":"4049","article-title":"Substation load forecasting based on adaptive deep belief network","volume":"39","author":"Zhiyu","year":"2019","journal-title":"Proc. CSEE"},{"key":"ref23","doi-asserted-by":"publisher","DOI":"10.1109\/ISGT-Asia.2019.8881662"},{"key":"ref24","doi-asserted-by":"publisher","DOI":"10.1038\/416552a"},{"key":"ref25","doi-asserted-by":"publisher","DOI":"10.1109\/CVPR.2014.106"},{"key":"ref26","doi-asserted-by":"publisher","DOI":"10.1016\/j.enconman.2017.08.014"},{"key":"ref27","volume-title":"Our Corporate Website Has Moved","year":"2023"}],"container-title":["IEEE Access"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6287639\/10005208\/10287535.pdf?arnumber=10287535","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,3,2]],"date-time":"2024-03-02T09:56:11Z","timestamp":1709373371000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/10287535\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023]]},"references-count":27,"URL":"https:\/\/doi.org\/10.1109\/access.2023.3325671","relation":{},"ISSN":["2169-3536"],"issn-type":[{"value":"2169-3536","type":"electronic"}],"subject":[],"published":{"date-parts":[[2023]]}}}