{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,29]],"date-time":"2026-04-29T19:08:55Z","timestamp":1777489735618,"version":"3.51.4"},"reference-count":37,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","license":[{"start":{"date-parts":[[2024,1,1]],"date-time":"2024-01-01T00:00:00Z","timestamp":1704067200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by-nc-nd\/4.0\/"}],"funder":[{"DOI":"10.13039\/501100001809","name":"National Natural Science Foundation of China","doi-asserted-by":"publisher","award":["52075088"],"award-info":[{"award-number":["52075088"]}],"id":[{"id":"10.13039\/501100001809","id-type":"DOI","asserted-by":"publisher"}]},{"name":"Graduate Education Teaching Reform Foundation of Liaoning Province","award":["LNYJG2022490"],"award-info":[{"award-number":["LNYJG2022490"]}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Access"],"published-print":{"date-parts":[[2024]]},"DOI":"10.1109\/access.2024.3425710","type":"journal-article","created":{"date-parts":[[2024,7,9]],"date-time":"2024-07-09T18:48:56Z","timestamp":1720550936000},"page":"96565-96582","source":"Crossref","is-referenced-by-count":5,"title":["Dual Resource Scheduling Problem of Machines and AGVs Based on Hybrid Discrete Salp Swarm Algorithm"],"prefix":"10.1109","volume":"12","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-6415-6552","authenticated-orcid":false,"given":"Tianrui","family":"Zhang","sequence":"first","affiliation":[{"name":"School of Mechanical Engineering, Shenyang University, Shenyang, China"}],"role":[{"role":"author","vocab":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0009-0006-0523-0122","authenticated-orcid":false,"given":"Guanghao","family":"Zhu","sequence":"additional","affiliation":[{"name":"School of Mechanical Engineering, Shenyang University, Shenyang, China"}],"role":[{"role":"author","vocab":"crossref"}]}],"member":"263","reference":[{"key":"ref1","first-page":"1","article-title":"Research status of AGV and machine integrated scheduling","volume":"59","author":"Wu","year":"2023","journal-title":"Comput. Eng. Appl."},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1287\/opre.43.6.1058"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1080\/00207549308956904"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1016\/s0305-0548(96)00061-5"},{"issue":"9","key":"ref5","first-page":"2219","article-title":"Improved flower pollinaton algorithm for job shop scheduling problems integrated with AGVs","volume":"25","author":"Liu","year":"2019","journal-title":"Comput. Integr. Manuf. Syst."},{"key":"ref6","article-title":"Research on the hybrid flow-shop scheduling considering the joint of machine and AGV with renewable energy","author":"Zhu","journal-title":"J. Beijing Univ. Aeronaut. Astronaut."},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1504\/IJMR.2019.096746"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1007\/s10898-021-00992-6"},{"key":"ref9","first-page":"1","article-title":"An improved differential evolution algorithm for simultaneous scheduling of machines and multi-load AGVs in an FMS","volume":"12","author":"Wang","year":"2023","journal-title":"Control Decis."},{"issue":"7","key":"ref10","first-page":"2198","article-title":"Improved iterative local search algorithm for solving multi-AGV flexible job shop scheduling problem","volume":"28","author":"Hu","year":"2022","journal-title":"Comput. Integr. Manuf. Syst."},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.3390\/pr10101944"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2019.1709671"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1016\/j.asoc.2012.02.001"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.32604\/csse.2023.037373"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2023.122946"},{"issue":"1","key":"ref16","first-page":"256","article-title":"Deep reinforcement learning for solving the joint scheduling problem of machines and AGVs in job shop","volume":"39","author":"Sun","year":"2024","journal-title":"Control Decis."},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.3390\/s23083815"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.5267\/j.ijiec.2022.2.002"},{"issue":"6","key":"ref19","first-page":"55","article-title":"AGV and machine integrated scheduling method based on discrete whale optimization algorithm","volume":"45","author":"Zou","year":"2022","journal-title":"J. Chongqing Univ."},{"issue":"3","key":"ref20","first-page":"461","article-title":"Research on dual-resource integrated scheduling of AGVs and machines in flexible job shop","volume":"34","author":"Chen","year":"2022","journal-title":"J. Syst. Simul."},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.1109\/4235.585893"},{"key":"ref22","doi-asserted-by":"publisher","DOI":"10.1016\/j.advengsoft.2017.07.002"},{"issue":"2","key":"ref23","first-page":"376","article-title":"Improved slap swarm algorithm for scheduling of flexible job shop","volume":"17","author":"Zhao","year":"2022","journal-title":"J. Intell. Syst."},{"issue":"7","key":"ref24","first-page":"1267","article-title":"Adaptive salp swarm algorithm for solving flexible job shop scheduling problem with transportation time","volume":"57","author":"Niu","year":"2023","journal-title":"J. Zhejiang Univ. Eng. Sci."},{"key":"ref25","doi-asserted-by":"publisher","DOI":"10.1287\/ijoc.6.2.154"},{"key":"ref26","doi-asserted-by":"publisher","DOI":"10.3934\/mbe.2022364"},{"issue":"10","key":"ref27","first-page":"2723","article-title":"Joint scheduling of machines and AGVs in green hybrid flow shop with missing operation","volume":"37","author":"Geng","year":"2022","journal-title":"Control Decis."},{"issue":"4","key":"ref28","first-page":"438","article-title":"Integrated scheduling of multiple AGVs and machines in flexible job shops","volume":"30","author":"He","year":"2019","journal-title":"China Mech. Eng."},{"key":"ref29","doi-asserted-by":"publisher","DOI":"10.1007\/s10845-007-0026-8"},{"key":"ref30","first-page":"1","article-title":"Simultaneous scheduling of machines and vehicles for the flexible job shop problem","volume-title":"Proc. Int. Conf. Metah. Nat. Ins. Comp.","author":"Deroussi"},{"key":"ref31","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-010-2820-2"},{"key":"ref32","doi-asserted-by":"publisher","DOI":"10.1002\/qre.4680040216"},{"key":"ref33","doi-asserted-by":"publisher","DOI":"10.1109\/robio.2009.5420504"},{"key":"ref34","doi-asserted-by":"publisher","DOI":"10.1016\/j.jocs.2020.101219"},{"key":"ref35","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2020.113917"},{"key":"ref36","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2014.910628"},{"key":"ref37","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2013.828164"}],"container-title":["IEEE Access"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx8\/6287639\/10380310\/10589627.pdf?arnumber=10589627","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,7,19]],"date-time":"2024-07-19T04:50:48Z","timestamp":1721364648000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/10589627\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024]]},"references-count":37,"URL":"https:\/\/doi.org\/10.1109\/access.2024.3425710","relation":{},"ISSN":["2169-3536"],"issn-type":[{"value":"2169-3536","type":"electronic"}],"subject":[],"published":{"date-parts":[[2024]]}}}