{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,19]],"date-time":"2026-02-19T00:59:39Z","timestamp":1771462779730,"version":"3.50.1"},"reference-count":48,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","license":[{"start":{"date-parts":[[2024,1,1]],"date-time":"2024-01-01T00:00:00Z","timestamp":1704067200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by-nc-nd\/4.0\/"}],"funder":[{"DOI":"10.13039\/501100002873","name":"Chulalongkorn University","doi-asserted-by":"publisher","award":["60\/40"],"award-info":[{"award-number":["60\/40"]}],"id":[{"id":"10.13039\/501100002873","id-type":"DOI","asserted-by":"publisher"}]},{"name":"Provincial Electricity Authority (PEA) for Technical Data"},{"name":"Thailand Science Research and Innovation Fund Chulalongkorn University"},{"name":"Second Century Fund (C2F), Chulalongkorn University"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Access"],"published-print":{"date-parts":[[2024]]},"DOI":"10.1109\/access.2024.3455774","type":"journal-article","created":{"date-parts":[[2024,9,10]],"date-time":"2024-09-10T19:21:56Z","timestamp":1725996116000},"page":"128375-128391","source":"Crossref","is-referenced-by-count":3,"title":["Optimal Operations of Local Energy Market With Electric Vehicle Charging and Incentives for Local Grid Services"],"prefix":"10.1109","volume":"12","author":[{"ORCID":"https:\/\/orcid.org\/0009-0003-6743-7776","authenticated-orcid":false,"given":"Arnon","family":"Teawnarong","sequence":"first","affiliation":[{"name":"Department of Electrical Engineering, Chulalongkorn University, Bangkok, Thailand"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-3851-7059","authenticated-orcid":false,"given":"Pikkanate","family":"Angaphiwatchawal","sequence":"additional","affiliation":[{"name":"Department of Electrical Engineering, Chulalongkorn University, Bangkok, Thailand"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-4194-3342","authenticated-orcid":false,"given":"Surachai","family":"Chaitusaney","sequence":"additional","affiliation":[{"name":"Department of Electrical Engineering, Chulalongkorn University, Bangkok, Thailand"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref1","volume-title":"Global EV Outlook 2023 Catching Up With Climate Ambitions","year":"2023"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-031-43670-3_28"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1109\/JSYST.2021.3104185"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1109\/ECTI-CON54298.2022.9795541"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1109\/TIA.2020.3041808"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1109\/ECTI-CON58255.2023.10153239"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.3390\/su122310160"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1109\/TITS.2021.3058514"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2023.3246083"},{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2011.2167990"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1109\/ISGTEUROPE.2010.5638854"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2015.01.144"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.2172\/1906715"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.2172\/1842485"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2014.2359977"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2022.3204761"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1109\/TSTE.2021.3113614"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2021.3053026"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1145\/3208903.3213893"},{"key":"ref20","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2020.3036915"},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2021.3049291"},{"key":"ref22","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2017.2767632"},{"key":"ref23","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2018.2822766"},{"key":"ref24","doi-asserted-by":"publisher","DOI":"10.1007\/s40565-019-0553-2"},{"key":"ref25","doi-asserted-by":"publisher","DOI":"10.3390\/su14106053"},{"key":"ref26","doi-asserted-by":"publisher","DOI":"10.1109\/IranianCEE.2019.8786727"},{"key":"ref27","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2023.3248219"},{"key":"ref28","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2023.120832"},{"key":"ref29","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2020.3042847"},{"key":"ref30","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2023.3299668"},{"key":"ref31","doi-asserted-by":"publisher","DOI":"10.1109\/isgteurope.2019.8905449"},{"key":"ref32","doi-asserted-by":"publisher","DOI":"10.1109\/tsg.2022.3197422"},{"key":"ref33","doi-asserted-by":"publisher","DOI":"10.1016\/j.energy.2018.04.170"},{"key":"ref34","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2022.3208093"},{"issue":"4","key":"ref35","first-page":"352","article-title":"Flexibility-based congestion management considering consumers inconvenience cost of demand response programs","volume":"12","author":"Rahi","year":"2024","journal-title":"J. Operation Autom. Power Eng."},{"key":"ref36","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2022.3164705"},{"key":"ref37","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4471-3735-1"},{"key":"ref38","volume-title":"Document for Receiving Feedback: Determining Electricity Rates for Electric Vehicle Charging Stations With Low Priority Management","year":"2023"},{"key":"ref39","doi-asserted-by":"publisher","DOI":"10.1016\/j.rser.2021.110820"},{"key":"ref40","volume-title":"MathWorks, Solver-Based Nonlinear Optimization","year":"2023"},{"key":"ref41","doi-asserted-by":"publisher","DOI":"10.1016\/j.egyr.2019.12.008"},{"key":"ref42","volume-title":"Electricity Tariffs","year":"2023"},{"key":"ref43","volume-title":"A Study on Mitigation Techniques for High Distributed PV Penetration","year":"2020"},{"key":"ref44","volume-title":"PSRL Database","year":"2023"},{"key":"ref45","doi-asserted-by":"publisher","DOI":"10.1016\/j.egyr.2022.03.016"},{"key":"ref46","volume-title":"Load Profile","year":"2023"},{"key":"ref47","volume-title":"Provincial Electricity Authoritys Regulation on the Power Network System Interconnection Code, BE 2559","year":"2016"},{"key":"ref48","volume-title":"Low Voltage Distribution Systems: A Planning Guide","year":"2004"}],"container-title":["IEEE Access"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx8\/6287639\/10380310\/10675323.pdf?arnumber=10675323","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,9,19]],"date-time":"2024-09-19T07:22:39Z","timestamp":1726730559000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/10675323\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024]]},"references-count":48,"URL":"https:\/\/doi.org\/10.1109\/access.2024.3455774","relation":{},"ISSN":["2169-3536"],"issn-type":[{"value":"2169-3536","type":"electronic"}],"subject":[],"published":{"date-parts":[[2024]]}}}