{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,2,21]],"date-time":"2025-02-21T20:22:53Z","timestamp":1740169373028,"version":"3.37.3"},"reference-count":46,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","license":[{"start":{"date-parts":[[2024,1,1]],"date-time":"2024-01-01T00:00:00Z","timestamp":1704067200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/legalcode"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Access"],"published-print":{"date-parts":[[2024]]},"DOI":"10.1109\/access.2024.3485006","type":"journal-article","created":{"date-parts":[[2024,10,23]],"date-time":"2024-10-23T17:50:05Z","timestamp":1729705805000},"page":"157149-157164","source":"Crossref","is-referenced-by-count":0,"title":["Sizing and Life Cycle Assessment of Small-Scale Power Backup Solutions: A Statistical Approach"],"prefix":"10.1109","volume":"12","author":[{"ORCID":"https:\/\/orcid.org\/0009-0004-2546-7640","authenticated-orcid":false,"given":"Armin","family":"Abdolmohammadi","sequence":"first","affiliation":[{"name":"Department of Mechanical and Aerospace Engineering, University of California at Davis, Davis, CA, USA"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-6127-7108","authenticated-orcid":false,"given":"Alireza","family":"Nemati","sequence":"additional","affiliation":[{"name":"Department of Mechanical and Aerospace Engineering, University of California at Davis, Davis, CA, USA"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-8180-9132","authenticated-orcid":false,"given":"Meridian","family":"Haas","sequence":"additional","affiliation":[{"name":"Department of Mechanical and Aerospace Engineering, University of California at Davis, Davis, CA, USA"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-1775-4664","authenticated-orcid":false,"given":"and","family":"Shima Nazari","sequence":"additional","affiliation":[{"name":"Department of Mechanical and Aerospace Engineering, University of California at Davis, Davis, CA, USA"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1109\/SYSTEMS.2010.5482356"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.3141\/2488-06"},{"issue":"19","key":"ref3","doi-asserted-by":"crossref","first-page":"5048","DOI":"10.3390\/en13195048","article-title":"Photovoltaics- and battery-based power network as sustainable source of electric power","volume":"13","author":"Paniyil","year":"2020","journal-title":"Energies"},{"key":"ref4","doi-asserted-by":"crossref","first-page":"1656","DOI":"10.1016\/j.apenergy.2013.09.015","article-title":"Optimal sizing, operating strategy and operational experience of a stand-alone microgrid on dongfushan island","volume":"113","author":"Zhao","year":"2014","journal-title":"Appl. Energy"},{"key":"ref5","doi-asserted-by":"crossref","first-page":"539","DOI":"10.1016\/j.renene.2014.12.039","article-title":"A method for optimal sizing energy storage systems for microgrids","volume":"77","author":"Fossati","year":"2015","journal-title":"Renew. Energy"},{"key":"ref6","doi-asserted-by":"crossref","first-page":"685","DOI":"10.1016\/j.solener.2019.06.050","article-title":"Optimal sizing of an autonomous photovoltaic\/wind\/battery\/diesel generator microgrid using grasshopper optimization algorithm","volume":"188","author":"Bukar","year":"2019","journal-title":"Sol. Energy"},{"key":"ref7","article-title":"A model-based parametric and optimal sizing of a battery\/hydrogen storage of a real hybrid microgrid supplying a residential load: Towards island operation","volume":"3","author":"Ferrario","year":"2021","journal-title":"Adv. Appl. Energy"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2011.2160745"},{"issue":"2","key":"ref9","doi-asserted-by":"crossref","first-page":"380","DOI":"10.1016\/j.apenergy.2009.08.012","article-title":"Current status of research on optimum sizing of stand-alone hybrid solar\u2013wind power generation systems","volume":"87","author":"Zhou","year":"2010","journal-title":"Appl. Energy"},{"key":"ref10","doi-asserted-by":"crossref","first-page":"249","DOI":"10.1016\/j.enconman.2016.11.060","article-title":"Battery sizing and rule-based operation of grid-connected photovoltaic-battery system: A case study in Sweden","volume":"133","author":"Zhang","year":"2017","journal-title":"Energy Convers. Manage."},{"key":"ref11","doi-asserted-by":"crossref","first-page":"2731","DOI":"10.1016\/j.rser.2017.06.079","article-title":"Components sizing of photovoltaic stand-alone system based on loss of power supply probability","volume":"81","author":"Ayop","year":"2018","journal-title":"Renew. Sustain. Energy Rev."},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1109\/TIE.2009.2021171"},{"key":"ref13","first-page":"708","article-title":"Sizing of a fuel cell\u2013battery backup system for a university building based on the probability of the power outages length","volume-title":"Energy Rep.","volume":"8","author":"Rodriguez","year":"2022"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1049\/iet-gtd.2018.5883"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2020.3040646"},{"key":"ref16","doi-asserted-by":"crossref","first-page":"85","DOI":"10.1016\/j.renene.2015.01.003","article-title":"Comparative life cycle assessment of a Thai Island\u2019s diesel\/PV\/wind hybrid microgrid","volume":"80","author":"Smith","year":"2015","journal-title":"Renew. Energy"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2019.2927653"},{"issue":"5","key":"ref18","doi-asserted-by":"crossref","first-page":"1067","DOI":"10.1016\/j.rser.2008.08.004","article-title":"LCA of renewable energy for electricity generation systems\u2014A review","volume":"13","author":"Bhat","year":"2009","journal-title":"Renew. Sustain. Energy Rev."},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2020.2983172"},{"key":"ref20","doi-asserted-by":"crossref","first-page":"554","DOI":"10.1016\/j.renene.2022.11.103","article-title":"Sizing of hybrid microgrids considering life cycle assessment","volume":"202","author":"Jim\u00e9nez-Vargas","year":"2023","journal-title":"Renew. Energy"},{"volume-title":"Preventing Wildfires With Power Outages: The Growing Impacts of California\u2019s Public Safety Power Shutoffs","year":"2023","key":"ref21"},{"volume-title":"Use of Back-Up Engines for Electricity Generation During Public Safety Power Shutoff Events | California Air Resources Board","year":"2023","key":"ref22"},{"key":"ref23","doi-asserted-by":"crossref","first-page":"726","DOI":"10.1016\/j.engfailanal.2013.07.006","article-title":"Power line failures and catastrophic wildfires under extreme weather conditions","volume":"35","author":"Mitchell","year":"2013","journal-title":"Eng. Failure Anal."},{"volume-title":"Backup Batteries at Traffic Lights Increase Safety and Energy Resilience in Saratoga","year":"2022","key":"ref24"},{"volume-title":"AB-1346 Air Pollution: Small Off-Road Engines","year":"2021","key":"ref25"},{"volume-title":"Western Systems Facilitates Green Backup Power for a Critical Intersection During Rolling Blackouts","year":"2022","key":"ref26"},{"volume-title":"Santa Clarita, Installs Eco-Friendly Long-Lasting Backup Power Unit at a Critical Intersection","year":"2022","key":"ref27"},{"key":"ref28","doi-asserted-by":"publisher","DOI":"10.1177\/0144598720965022"},{"key":"ref29","doi-asserted-by":"publisher","DOI":"10.1115\/1.4042402"},{"issue":"12","key":"ref30","doi-asserted-by":"crossref","first-page":"5082","DOI":"10.1016\/j.energy.2010.08.007","article-title":"A stochastic method for battery sizing with uninterruptible-power and demand shift capabilities in PV (photovoltaic) systems","volume":"35","author":"Tan","year":"2010","journal-title":"Energy"},{"volume-title":"Net Energy Metering 2.0 Evaluation","year":"2021","key":"ref31"},{"volume-title":"Net Surplus Compensation","year":"2023","key":"ref32"},{"key":"ref33","doi-asserted-by":"crossref","first-page":"51","DOI":"10.1016\/j.rser.2018.03.003","article-title":"The national solar radiation data base (NSRDB)","volume":"89","author":"Sengupta","year":"2018","journal-title":"Renew. Sustain. Energy Rev."},{"issue":"2","key":"ref34","doi-asserted-by":"crossref","first-page":"73","DOI":"10.1016\/j.landurbplan.2011.03.011","article-title":"Tree structure influences on rooftop-received solar radiation","volume":"102","author":"Tooke","year":"2011","journal-title":"Landscape Urban Planning"},{"key":"ref35","doi-asserted-by":"publisher","DOI":"10.1109\/TIA.2023.3292807"},{"key":"ref36","first-page":"1","article-title":"A refresher on net present value","volume":"19","author":"Gallo","year":"2014","journal-title":"Harvard Bus. Rev."},{"key":"ref37","doi-asserted-by":"publisher","DOI":"10.1109\/GUT.2012.6344195"},{"volume-title":"California Power Outage Map","year":"2021","key":"ref38"},{"volume-title":"2021 Annual Electric Reliability Report","year":"2022","key":"ref39"},{"volume-title":"Environmental Management: Life Cycle Assessment; Principles and Framework","year":"2006","key":"ref40"},{"key":"ref41","doi-asserted-by":"publisher","DOI":"10.1007\/s10098-010-0338-9"},{"key":"ref42","doi-asserted-by":"publisher","DOI":"10.1007\/s11367-016-1087-8"},{"key":"ref43","first-page":"708","article-title":"Sizing of a fuel cell\u2013battery backup system for a university building based on the probability of the power outages length","volume-title":"Energy Rep.","volume":"8","author":"Rodriguez","year":"2022"},{"key":"ref44","doi-asserted-by":"publisher","DOI":"10.1109\/TMC.2018.2842733"},{"issue":"4","key":"ref45","doi-asserted-by":"crossref","first-page":"932","DOI":"10.3390\/hydrogen4040055","article-title":"Cost projection of global green hydrogen production scenarios","volume":"4","author":"Zun","year":"2023","journal-title":"Hydrogen"},{"volume-title":"Chatgpt 4.0","year":"2023","key":"ref46"}],"container-title":["IEEE Access"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx8\/6287639\/10380310\/10731662.pdf?arnumber=10731662","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,11,27]],"date-time":"2024-11-27T01:58:29Z","timestamp":1732672709000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/10731662\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024]]},"references-count":46,"URL":"https:\/\/doi.org\/10.1109\/access.2024.3485006","relation":{},"ISSN":["2169-3536"],"issn-type":[{"type":"electronic","value":"2169-3536"}],"subject":[],"published":{"date-parts":[[2024]]}}}