{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,2,21]],"date-time":"2025-02-21T05:34:08Z","timestamp":1740116048395,"version":"3.37.3"},"reference-count":33,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","license":[{"start":{"date-parts":[[2025,1,1]],"date-time":"2025-01-01T00:00:00Z","timestamp":1735689600000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/legalcode"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Access"],"published-print":{"date-parts":[[2025]]},"DOI":"10.1109\/access.2025.3538714","type":"journal-article","created":{"date-parts":[[2025,2,4]],"date-time":"2025-02-04T18:43:00Z","timestamp":1738694580000},"page":"27477-27486","source":"Crossref","is-referenced-by-count":0,"title":["Study on Rapid Calculation and Graded Early Warning System for Conductor Temperature of 10 kV XLPE Cables"],"prefix":"10.1109","volume":"13","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-1267-2368","authenticated-orcid":false,"given":"Qishun","family":"Li","sequence":"first","affiliation":[{"name":"State Grid Zhejiang Hangzhou Xiaoshan Power Supply Company, Hangzhou, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Sichao","family":"Chen","sequence":"additional","affiliation":[{"name":"State Grid Zhejiang Hangzhou Xiaoshan Power Supply Company, Hangzhou, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Haifeng","family":"Qiu","sequence":"additional","affiliation":[{"name":"State Grid Zhejiang Hangzhou Xiaoshan Power Supply Company, Hangzhou, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Guohua","family":"Zhou","sequence":"additional","affiliation":[{"name":"State Grid Zhejiang Hangzhou Xiaoshan Power Supply Company, Hangzhou, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Bin","family":"Lv","sequence":"additional","affiliation":[{"name":"State Grid Zhejiang Hangzhou Xiaoshan Power Supply Company, Hangzhou, China"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.3390\/en17122905"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2021.3092757"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1016\/j.rser.2018.07.026"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.3390\/en15134692"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.3390\/polym14245478"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1109\/TASC.2021.3068399"},{"issue":"9","key":"ref7","first-page":"2593","article-title":"Key technology analysis and prospect of high voltage\/ultra high voltage power cable","volume":"40","author":"Zhou","year":"2014","journal-title":"High Volt. Eng."},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.3390\/polym14112282"},{"issue":"10","key":"ref9","first-page":"1","article-title":"Analysis on overload capacity of 500 kV oil-filled submarine cable","volume":"40","author":"Chen","year":"2021","journal-title":"Adv. Tech. Elect. Eng. Ener."},{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2021.3108199"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1063\/5.0062676"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1016\/j.jestch.2024.101658"},{"issue":"9","key":"ref13","first-page":"81","article-title":"Research on defect detection method of power cable based on inverse problem of temperature field","volume":"41","author":"Jiang","year":"2022","journal-title":"Adv. Tech. Elect. Eng. Ener."},{"issue":"12","key":"ref14","first-page":"5002","article-title":"Ampacity prediction of densely stacked distribution cables in trench and optimal allocation of new load based on transient thermal-fluid coupling simulation","volume":"49","author":"Fan","year":"2023","journal-title":"High Volt. Eng."},{"issue":"3","key":"ref15","article-title":"Impact of thermal backfill parameters on current-carrying capacity of power cables installed in the ground","volume":"71","author":"Seweryn","year":"2023","journal-title":"Bull. Pol. Acad. Sci., Tech. Sci."},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1007\/s00202-022-01689-z"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.3389\/fenrg.2024.1430501"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.3390\/en17164170"},{"volume-title":"Electric Cables\u2014Calculation of the Current Rating\u2014Part 1-1: Current Rating Equations (100% Load Factor) and Calculation of Losses\u2014General","year":"2023","key":"ref19"},{"volume-title":"Low-Voltage Electrical Installations\u2014Part 5-52: Selection and Erection of Electrical Equipment\u2014Wiring Systems","year":"2024","key":"ref20"},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2022.3196148"},{"issue":"8","key":"ref22","first-page":"139","article-title":"Research on adaptability simulation validation of transient temperature rise thermal circuit model for buried cable group under complex environment","volume":"60","author":"Fu","year":"2024","journal-title":"High Volt. Appar."},{"issue":"9","key":"ref23","first-page":"3517","article-title":"Transient temperature rise calculation of buried power cable based on thermal circuit model and transient adjoint model","volume":"48","author":"Liang","year":"2022","journal-title":"High Volt. Eng."},{"issue":"8","key":"ref24","first-page":"3562","article-title":"Temperature distribution and transient process of insulating sheath for cable connector","volume":"49","author":"Ma","year":"2023","journal-title":"High Volt. Eng."},{"journal-title":"Proc. CSEE","article-title":"Transient temperature rise of tunnel cable system considering sheath circulation and time varying conductor resistance","author":"Wang","key":"ref25"},{"journal-title":"High Volt. Eng.","article-title":"Dynamic capacity expansion evaluation for HVDC cable lines based on transient electrical and thermal field characteristic","author":"Liu","key":"ref26"},{"issue":"9","key":"ref27","first-page":"4851","article-title":"Simulation study on steady-state ampacity of ?500kV DC submarine cable under J-tube laying environment","volume-title":"Proc. CSEE","volume":"43","author":"Xia"},{"key":"ref28","doi-asserted-by":"publisher","DOI":"10.1109\/TDEI.2022.3225694"},{"volume-title":"Electric Cables- Calculations for Current Ratings- Finite Element Method","year":"2003","key":"ref29"},{"volume-title":"Calculation of the Cyclic and Emergency Current Rating of Cables\u2014Part 2: Cyclic Rating of Cables Greater Than 18\/30 (36) KV and Emergency Ratings for Cables of All Voltages","year":"1989","key":"ref30"},{"volume-title":"Electric Cables\u2014Calculation of the Current Rating\u2014Part 2-1: Thermal Resistance\u2014Calculation of Thermal Resistance","year":"2023","key":"ref31"},{"key":"ref32","doi-asserted-by":"publisher","DOI":"10.1049\/iet-gtd.2019.0064"},{"key":"ref33","doi-asserted-by":"publisher","DOI":"10.1049\/gtd2.13243"}],"container-title":["IEEE Access"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx8\/6287639\/10820123\/10870214.pdf?arnumber=10870214","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,2,20]],"date-time":"2025-02-20T20:37:30Z","timestamp":1740083850000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/10870214\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2025]]},"references-count":33,"URL":"https:\/\/doi.org\/10.1109\/access.2025.3538714","relation":{},"ISSN":["2169-3536"],"issn-type":[{"type":"electronic","value":"2169-3536"}],"subject":[],"published":{"date-parts":[[2025]]}}}