{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,13]],"date-time":"2026-06-13T16:15:10Z","timestamp":1781367310979,"version":"3.54.1"},"reference-count":40,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","license":[{"start":{"date-parts":[[2025,1,1]],"date-time":"2025-01-01T00:00:00Z","timestamp":1735689600000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by-nc-nd\/4.0\/"}],"funder":[{"name":"Local Standard Fund Project of Liaoning Province in 2024","award":["2024099"],"award-info":[{"award-number":["2024099"]}]},{"name":"Local Standard Fund Project of Liaoning Province in 2024","award":["2024107"],"award-info":[{"award-number":["2024107"]}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Access"],"published-print":{"date-parts":[[2025]]},"DOI":"10.1109\/access.2025.3560646","type":"journal-article","created":{"date-parts":[[2025,4,15]],"date-time":"2025-04-15T17:38:02Z","timestamp":1744738682000},"page":"74417-74429","source":"Crossref","is-referenced-by-count":1,"title":["Comparative Study of Signal Control Models for Roundabouts"],"prefix":"10.1109","volume":"13","author":[{"given":"Ruijun","family":"Guo","sequence":"first","affiliation":[{"name":"School of Transportation Engineering, Dalian Jiaotong University, Dalian, China"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0009-0001-9753-6666","authenticated-orcid":false,"given":"Yuan","family":"Xu","sequence":"additional","affiliation":[{"name":"School of Transportation Engineering, Dalian Jiaotong University, Dalian, China"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Yue","family":"Yu","sequence":"additional","affiliation":[{"name":"School of Transportation Engineering, Dalian Jiaotong University, Dalian, China"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-4855-2264","authenticated-orcid":false,"given":"Wanxiang","family":"Wang","sequence":"additional","affiliation":[{"name":"School of Transportation Engineering, Dalian Jiaotong University, Dalian, China"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Zhongchuan","family":"Gao","sequence":"additional","affiliation":[{"name":"School of Transportation Engineering, Dalian Jiaotong University, Dalian, China"}],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"263","reference":[{"issue":"4","key":"ref1","first-page":"7569","article-title":"A new calculation procedure for signalized roundabouts and performance analysis","volume":"27","author":"Cakici","year":"2016","journal-title":"Tech. J. Turkish Chamber Civil Eng."},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-947X(2001)127:2(143)"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-947X(2007)133:12(647)"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1109\/TITS.2004.838181"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1016\/j.trd.2006.06.005"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1016\/j.ergon.2006.11.003"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.7307\/ptt.v21i3.221"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1016\/j.aap.2012.04.012"},{"issue":"4","key":"ref9","first-page":"6479","article-title":"The investigation of heavy vehicle effects on roundabouts","volume":"24","author":"Tanyel","year":"2013","journal-title":"Tech. J. Turkish Chamber Civil Eng."},{"key":"ref10","first-page":"47","article-title":"Traffic control models of roundabouts","volume":"3","author":"Yang","year":"2000","journal-title":"J. Highway Transp. Res. Develop."},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.14256\/JCE.2323.2018"},{"key":"ref12","first-page":"1","article-title":"Roundabouts with metering signals","volume-title":"Proc. Inst. Transp. Eng. Annu. Meeting","author":"Natalizio"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1016\/j.aap.2006.10.004"},{"key":"ref14","first-page":"1","article-title":"Capacity of performance analysis of roundabout metering signals","volume-title":"Proc. TRB Nat. Roundabout Conf.","author":"Akcelik"},{"key":"ref15","first-page":"1","article-title":"Operating cost, fuel consumption and pollutant emission savings at a roundabout with metering signals","volume-title":"Proc. 7th Int. Congr. Adv. Civil Eng. (ACE)","author":"Akcelik"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1016\/j.sbspro.2011.04.488"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1016\/j.sbspro.2011.04.492"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1016\/j.sbspro.2012.09.928"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1016\/j.trc.2013.08.013"},{"key":"ref20","doi-asserted-by":"publisher","DOI":"10.1016\/j.jtte.2019.06.003"},{"issue":"5","key":"ref21","first-page":"15","article-title":"A new method of two steps left turn signal control at roundabout","volume":"44","author":"Guo","year":"2023","journal-title":"J. Dalian Jiaotong Univ."},{"key":"ref22","doi-asserted-by":"publisher","DOI":"10.1109\/ICICTA.2008.49"},{"key":"ref23","doi-asserted-by":"publisher","DOI":"10.4304\/jsw.7.2.346-351"},{"key":"ref24","doi-asserted-by":"publisher","DOI":"10.1016\/S1570-6672(09)60042-8"},{"key":"ref25","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)TE.1943-5436.0000217"},{"key":"ref26","doi-asserted-by":"publisher","DOI":"10.1155\/2019\/4971479"},{"issue":"8","key":"ref27","first-page":"131","article-title":"Evaluation indexes selection and level-of-service classification for roundabouts","volume":"28","author":"Li","year":"2011","journal-title":"Gonglu Jiaotong Keji\/J. Highway Transp. Res. Develop."},{"key":"ref28","first-page":"419","article-title":"Extent of delay and level of service at signalized roundabout","volume":"23","author":"Johnnie","year":"2012","journal-title":"Int. J. Eng. Technol."},{"key":"ref29","doi-asserted-by":"publisher","DOI":"10.1016\/j.proeng.2016.01.244"},{"key":"ref30","doi-asserted-by":"publisher","DOI":"10.1016\/j.proeng.2016.01.269"},{"key":"ref31","doi-asserted-by":"publisher","DOI":"10.1016\/j.trd.2016.03.016"},{"key":"ref32","doi-asserted-by":"publisher","DOI":"10.1016\/j.trpro.2017.01.072"},{"key":"ref33","doi-asserted-by":"publisher","DOI":"10.1016\/j.trf.2019.04.007"},{"key":"ref34","doi-asserted-by":"publisher","DOI":"10.1080\/19427867.2018.1533160"},{"key":"ref35","doi-asserted-by":"publisher","DOI":"10.7307\/ptt.v34i3.3973"},{"key":"ref36","doi-asserted-by":"publisher","DOI":"10.31026\/j.eng.2023.03.06"},{"key":"ref37","doi-asserted-by":"publisher","DOI":"10.1177\/03611981241234909"},{"key":"ref38","first-page":"1","article-title":"Research on improvement design and control method of large large roundabouts","volume-title":"Proc. 20th Anniversary Establishment China Urban Transport Planning Academic Committee","author":"Yang"},{"issue":"6","key":"ref39","first-page":"630","article-title":"Study on the operation efficiency of new three-dimensional roundabout","volume":"37","author":"Pan","year":"2020","journal-title":"J. Shenzhen Univ. Sci. Technol. Ed."},{"issue":"1","key":"ref40","first-page":"161","article-title":"Shanghai Disneyland roundabout signal optimization control simulation","volume":"36","author":"Wang","year":"2019","journal-title":"Comput. Simul."}],"container-title":["IEEE Access"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx8\/6287639\/10820123\/10965659.pdf?arnumber=10965659","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,5,7]],"date-time":"2025-05-07T04:24:46Z","timestamp":1746591886000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/10965659\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2025]]},"references-count":40,"URL":"https:\/\/doi.org\/10.1109\/access.2025.3560646","relation":{},"ISSN":["2169-3536"],"issn-type":[{"value":"2169-3536","type":"electronic"}],"subject":[],"published":{"date-parts":[[2025]]}}}