{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,7]],"date-time":"2026-05-07T15:46:25Z","timestamp":1778168785835,"version":"3.51.4"},"reference-count":33,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","license":[{"start":{"date-parts":[[2025,1,1]],"date-time":"2025-01-01T00:00:00Z","timestamp":1735689600000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/legalcode"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Access"],"published-print":{"date-parts":[[2025]]},"DOI":"10.1109\/access.2025.3626457","type":"journal-article","created":{"date-parts":[[2025,10,28]],"date-time":"2025-10-28T17:35:26Z","timestamp":1761672926000},"page":"188771-188782","source":"Crossref","is-referenced-by-count":1,"title":["Modeling and Performance Assessment of a Grid Connected Large Scale Photovoltaic Plant: A Case Study of Yemen"],"prefix":"10.1109","volume":"13","author":[{"ORCID":"https:\/\/orcid.org\/0009-0007-1371-0174","authenticated-orcid":false,"given":"Marwan Mohammed Abdo","family":"Azazi","sequence":"first","affiliation":[{"name":"Department of Electrical Engineering, Andhra University, Visakhapatnam, Andhra Pradesh, India"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0009-0008-1634-3426","authenticated-orcid":false,"given":"Kanchapogu","family":"Vaisakh","sequence":"additional","affiliation":[{"name":"Department of Electrical Engineering, Andhra University, Visakhapatnam, Andhra Pradesh, India"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0009-0008-9151-669X","authenticated-orcid":false,"given":"Adel","family":"Tatish","sequence":"additional","affiliation":[{"name":"Department of Electrical Engineering, Andhra University, Visakhapatnam, Andhra Pradesh, India"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2025.3555169"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1109\/TIA.2021.3066326"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1016\/j.rser.2017.09.094"},{"issue":"21","key":"ref4","first-page":"9906","article-title":"A review of the fault ride through requirements in different grid codes concerning penetration of PV system to the electric power network","volume":"10","author":"Al-Shetwi","year":"2015","journal-title":"ARPN J. Eng. Appl. Sci."},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.3390\/en13174279"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1109\/TSTE.2010.2050348"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2012.2235470"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1109\/TEC.2010.2062515"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1109\/TSTE.2014.2327122"},{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1049\/iet-rpg.2016.0904"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1109\/MPE.2017.2662338"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1016\/j.renene.2020.05.151"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1016\/j.renene.2021.02.073"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2018.2798707"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2024.3479885"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1016\/j.mset.2019.07.002"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.3390\/en16031308"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1126\/sciadv.abj6734"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1109\/PES.2007.385563"},{"key":"ref20","doi-asserted-by":"publisher","DOI":"10.1109\/PES.2010.5589731"},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.2172\/924641"},{"key":"ref22","doi-asserted-by":"publisher","DOI":"10.1016\/S0378-7796(96)01203-5"},{"key":"ref23","doi-asserted-by":"publisher","DOI":"10.1016\/S0378-7796(99)00060-7"},{"key":"ref24","doi-asserted-by":"publisher","DOI":"10.1109\/ISGTEurope.2013.6695311"},{"key":"ref25","doi-asserted-by":"publisher","DOI":"10.18196\/jrc.2366"},{"issue":"4","key":"ref26","first-page":"4170","article-title":"Experimental study of using renewable energy in Yemen","volume":"3","author":"Alganahi","year":"2009","journal-title":"Austral. J. Basic Appl. Sci."},{"key":"ref27","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2021.3084514"},{"key":"ref28","first-page":"142","volume-title":"Yemen\u2019s Solar Revolution: Developments, Challenges, Opportunities","author":"Ansari","year":"2019"},{"key":"ref29","volume-title":"UAE Funds 120 MW Expansion of Aden Solar Plant With Battery Storage","year":"2025"},{"key":"ref30","volume-title":"Prime Minister Inaugurates Aden Solar Power Station, Phase One (120 MW)","year":"2024"},{"key":"ref31","volume-title":"Aden Solar Power Plant Begins Operation With 120 MW Capacity","year":"2024"},{"key":"ref32","volume-title":"Yemen Solar Energy Initiative: 6 Stunning Solar Power Stations","year":"2025"},{"key":"ref33","volume-title":"Establishing a Solar Energy Station in Yemen With Emirati Funding","year":"2024"}],"container-title":["IEEE Access"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx8\/6287639\/10820123\/11219021.pdf?arnumber=11219021","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,11,10]],"date-time":"2025-11-10T18:50:03Z","timestamp":1762800603000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/11219021\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2025]]},"references-count":33,"URL":"https:\/\/doi.org\/10.1109\/access.2025.3626457","relation":{},"ISSN":["2169-3536"],"issn-type":[{"value":"2169-3536","type":"electronic"}],"subject":[],"published":{"date-parts":[[2025]]}}}