{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,12,11]],"date-time":"2025-12-11T19:04:10Z","timestamp":1765479850926,"version":"3.48.0"},"reference-count":24,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","license":[{"start":{"date-parts":[[2025,1,1]],"date-time":"2025-01-01T00:00:00Z","timestamp":1735689600000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/legalcode"}],"funder":[{"DOI":"10.13039\/501100013148","name":"Science and Technology Project of State Grid Corporation of China","doi-asserted-by":"publisher","award":["5400-202399569A-3-2-ZN"],"award-info":[{"award-number":["5400-202399569A-3-2-ZN"]}],"id":[{"id":"10.13039\/501100013148","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Access"],"published-print":{"date-parts":[[2025]]},"DOI":"10.1109\/access.2025.3634672","type":"journal-article","created":{"date-parts":[[2025,11,19]],"date-time":"2025-11-19T18:46:49Z","timestamp":1763578009000},"page":"206402-206416","source":"Crossref","is-referenced-by-count":0,"title":["Coordinated Dispatch of Microgrids With Multi-Process Industrial Loads Considering Frequency Security Under Unplanned Islanding"],"prefix":"10.1109","volume":"13","author":[{"ORCID":"https:\/\/orcid.org\/0009-0006-2825-2826","authenticated-orcid":false,"given":"Runsheng","family":"Gao","sequence":"first","affiliation":[{"name":"School of Electrical Engineering, Chongqing University, Chongqing, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-1926-4888","authenticated-orcid":false,"given":"Chunyan","family":"Li","sequence":"additional","affiliation":[{"name":"School of Electrical Engineering, Chongqing University, Chongqing, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-2130-4487","authenticated-orcid":false,"given":"Changzheng","family":"Shao","sequence":"additional","affiliation":[{"name":"School of Electrical Engineering, Chongqing University, Chongqing, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-0520-0725","authenticated-orcid":false,"given":"Chengrong","family":"Lin","sequence":"additional","affiliation":[{"name":"School of Electrical Engineering, Chongqing University, Chongqing, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Hanxin","family":"Zhang","sequence":"additional","affiliation":[{"name":"School of Electrical Engineering, Chongqing University, Chongqing, China"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1016\/j.rser.2018.03.040"},{"volume-title":"Tightened Electricity Consumption Restrictions Imposed on Energy-Intensive Industries (Industry Observation)","year":"2021","key":"ref2"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1038\/s41467-025-61979-5"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.3390\/su17114938"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1109\/tste.2021.3109468"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1016\/j.eng.2024.09.023"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1109\/tpwrd.2023.3307552"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1109\/EEE-AM58328.2023.10395252"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1109\/tpwrs.2021.3086844"},{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1109\/tste.2024.3368656"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1016\/j.energy.2025.137171"},{"key":"ref12","first-page":"1","article-title":"Risk analysis and coun-termeasures for frequency stability of receiving end system in Southeast Tibet based on time series production simulation","author":"Chen","year":"2025","journal-title":"Southern Power Syst. Technol."},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.3390\/en14196290"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1109\/tsg.2022.3146193"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2019.2891900"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1016\/j.epsr.2021.107474"},{"issue":"14","key":"ref17","first-page":"45","article-title":"Intelligent energy management of industri-al loads considering participation in demand response program","volume":"41","author":"Jun-Yi","year":"2017","journal-title":"Autom. Electr. Power Syst."},{"issue":"17","key":"ref18","first-page":"160","article-title":"An economic dispatch model in an industrial microgrid with wind power based on robust optimization","volume":"39","author":"Hao","year":"2015","journal-title":"Autom. Electr. Power Syst."},{"issue":"7","key":"ref19","first-page":"31","article-title":"Research on peak shaving of wind power grid connection considering demand side re-sponse of electrolytic aluminum load","volume":"42","author":"Bin","year":"2023","journal-title":"Adv. Technol. Elect. Eng. Energy"},{"issue":"22","key":"ref20","first-page":"13","article-title":"Robust unit commitment considering uncertainties of wind and energy in-tensive load dispatching","volume":"43","author":"Hongyang","year":"2019","journal-title":"Autom. Electr. Power Syst."},{"issue":"3","key":"ref21","first-page":"13","article-title":"Non-cooperative game based strategy for energy-intensive industrial load participating in peak-regulation demand","volume":"49","author":"Tingyu","year":"2025","journal-title":"Autom. Electr. Power Syst."},{"issue":"3","key":"ref22","first-page":"67","article-title":"Optimal operation of industrial and commercial park considering load demand during unplanned off-grid","volume":"16","author":"Lu","year":"2022","journal-title":"Southern Power Syst. Technol."},{"issue":"12","key":"ref23","first-page":"191","article-title":"Study on power consumption strategy of cement plant based on adjustable load","volume":"25","author":"Naiyun","year":"2018","journal-title":"Technol. Market"},{"issue":"1","key":"ref24","first-page":"74","article-title":"Power consumption prediction modeling of cement manufacturing based on the improved multiple non-linear regression algorithm","volume":"37","author":"Zhao","year":"2015","journal-title":"Manuf. Automat."}],"container-title":["IEEE Access"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx8\/6287639\/10820123\/11259114.pdf?arnumber=11259114","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,12,11]],"date-time":"2025-12-11T18:47:02Z","timestamp":1765478822000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/11259114\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2025]]},"references-count":24,"URL":"https:\/\/doi.org\/10.1109\/access.2025.3634672","relation":{},"ISSN":["2169-3536"],"issn-type":[{"type":"electronic","value":"2169-3536"}],"subject":[],"published":{"date-parts":[[2025]]}}}