{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,9,26]],"date-time":"2025-09-26T13:27:27Z","timestamp":1758893247247,"version":"3.28.0"},"reference-count":13,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2011,9]]},"DOI":"10.1109\/afrcon.2011.6072165","type":"proceedings-article","created":{"date-parts":[[2011,11,11]],"date-time":"2011-11-11T13:56:18Z","timestamp":1321019778000},"page":"1-6","source":"Crossref","is-referenced-by-count":1,"title":["Investigating a probabilistic customer interruption costs and energy not supplied assessment for electric power distribution residential customers"],"prefix":"10.1109","author":[{"given":"Kehinde","family":"Awodele","sequence":"first","affiliation":[]},{"given":"Nicolas F.S.","family":"Ip Cho","sequence":"additional","affiliation":[]}],"member":"263","reference":[{"key":"ref10","article-title":"Load Modeling for Reliability and Customer Interruption Costs Evaluation","author":"ip cho","year":"2010","journal-title":"Proceedings of the 19th Southern African Universities Power Engineering Conference University of the Witwatersrand Johannesburg"},{"key":"ref11","article-title":"Time Sequential Distribution System Reliability Worth Analysis Considering Time Varying Load and Cost Models","volume":"14","author":"wang","year":"1999","journal-title":"IEEE Transactions on Power Delivery"},{"article-title":"Reliability in Performance-Based Regulation","year":"2005","author":"solver","key":"ref12"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2008.919041"},{"key":"ref4","article-title":"Evaluation of Customer Interruption Cost for Reliability Planning of Power Systems in Developing Economies","author":"kaur","year":"2004","journal-title":"8th International Conference on Probabilistic Methods Applied to Power Systems Iowa State University"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1016\/S0142-0615(00)00046-6"},{"journal-title":"Power Systems Research Group Department of Electrical Engineering University of Cape Town","article-title":"Loads data, collected by Herman and Gaunt","year":"0","key":"ref6"},{"key":"ref5","article-title":"Direct and Indirect Measurement of Residential and Commercial CIC: Preliminary findings from South Africa Surveys","author":"herman","year":"2008","journal-title":"PMAPS08 Puerto Rico"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1109\/59.544626"},{"key":"ref7","article-title":"Comparison of Customer Outage Cost Models in Quality Regulation of Electricity Distribution using Monte Carlo Simulations","author":"dijerenge","year":"2009","journal-title":"Thesis Report University of Cape Town Department of Electrical Engineering"},{"key":"ref2","article-title":"System Reliability Worth Assessment at a Midwest Utility - Survey Results for Industrial, Commercial and Institutional Customers","author":"chowdhury","year":"2004","journal-title":"Proc 8th International Conference on Probabilistic Methods Applied to Power Systems Iowa State University"},{"key":"ref1","article-title":"System Reliability Worth Assessment at a Midwest Utility - Survey Results for Residential Customers","author":"chowdhury","year":"2004","journal-title":"Proc 8th International Conference on Probabilistic Methods Applied to Power Systems Iowa State University"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1109\/59.761856"}],"event":{"name":"AFRICON 2011","start":{"date-parts":[[2011,9,13]]},"location":"Victoria Falls, Livingstone, Zambia","end":{"date-parts":[[2011,9,15]]}},"container-title":["IEEE Africon '11"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx5\/6062325\/6071956\/06072165.pdf?arnumber=6072165","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,3,21]],"date-time":"2017-03-21T12:57:59Z","timestamp":1490101079000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/6072165\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2011,9]]},"references-count":13,"URL":"https:\/\/doi.org\/10.1109\/afrcon.2011.6072165","relation":{},"subject":[],"published":{"date-parts":[[2011,9]]}}}