{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,29]],"date-time":"2024-10-29T09:49:46Z","timestamp":1730195386297,"version":"3.28.0"},"reference-count":10,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2017,9]]},"DOI":"10.1109\/afrcon.2017.8095656","type":"proceedings-article","created":{"date-parts":[[2017,11,28]],"date-time":"2017-11-28T11:04:21Z","timestamp":1511867061000},"page":"1220-1224","source":"Crossref","is-referenced-by-count":3,"title":["Introduction to the South African Renewable Energy Grid Code version 2.9 requirements (Part I \u2014 Introduction)"],"prefix":"10.1109","author":[{"given":"Sanjeeth","family":"Sewchurran","sequence":"first","affiliation":[]},{"given":"Innocent E.","family":"Davidson","sequence":"additional","affiliation":[]}],"member":"263","reference":[{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1109\/PSC.2016.7462840"},{"key":"ref3","first-page":"19","article-title":"Power deficits and outage planning in South Africa","author":"mwale","year":"2014","journal-title":"Proceedings of the 2nd International Symposium on Energy Challenges and Mechanics"},{"journal-title":"Grid Codes Comparison","year":"2006","author":"arias","key":"ref10"},{"key":"ref6","article-title":"Modelling and performance analysis of the eThekwini Electricity distribution grid with increased embedded generation sources","author":"sewchurran","year":"2016","journal-title":"Doctorate of Philosophy Electrical Engineering University of KwaZulu-Natal"},{"key":"ref5","first-page":"20","article-title":"Guiding Principles for Grid Code Compliance of Large Utility Scale Renewable Power Plant Integration onto South Africa's Transmission\/Distribution Networks","author":"sewchurran","year":"2016","journal-title":"Proc International Conference on Renewable Energy Research and Applications"},{"key":"ref8","article-title":"The UK Grid Code","volume":"2","year":"2010","journal-title":"National Grid Transmission plc"},{"key":"ref7","first-page":"2172","article-title":"A review and discussion of the Grid Code requirements for renwable energy sources in Spain","author":"sanchez","year":"0"},{"journal-title":"National Energy Regulator of South Africa Version 2 9","article-title":"Grid Connection Code for Renewable Power Plants (RPPs) connected to the Electricity Transmission System (TS) or Distribution System (DS) in South Africa","year":"2016","key":"ref2"},{"article-title":"New German Grid Code for Connecting PV Systems to the Medium Voltage Power Grid","year":"0","author":"troester","key":"ref9"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1109\/TDC.2014.6863237"}],"event":{"name":"2017 IEEE AFRICON","start":{"date-parts":[[2017,9,18]]},"location":"Cape Town","end":{"date-parts":[[2017,9,20]]}},"container-title":["2017 IEEE AFRICON"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/8085624\/8095433\/08095656.pdf?arnumber=8095656","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,12,13]],"date-time":"2017-12-13T14:40:07Z","timestamp":1513176007000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/8095656\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,9]]},"references-count":10,"URL":"https:\/\/doi.org\/10.1109\/afrcon.2017.8095656","relation":{},"subject":[],"published":{"date-parts":[[2017,9]]}}}