{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,29]],"date-time":"2024-10-29T09:49:39Z","timestamp":1730195379836,"version":"3.28.0"},"reference-count":24,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2013,7]]},"DOI":"10.1109\/aim.2013.6584217","type":"proceedings-article","created":{"date-parts":[[2013,8,29]],"date-time":"2013-08-29T15:31:59Z","timestamp":1377790319000},"page":"955-960","source":"Crossref","is-referenced-by-count":1,"title":["Dynamic control of skilled and unskilled labour task assignments"],"prefix":"10.1109","author":[{"family":"Vu Thanh Le","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"James","family":"Zhang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Michael","family":"Johnstone","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Saeid","family":"Nahavandi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Doug","family":"Creighton","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"19","first-page":"17","article-title":"Are MRP and JIT compatible?","volume":"1","author":"vaughn","year":"1988","journal-title":"The Journal of Applied Manufacturing Systems"},{"key":"22","first-page":"40","article-title":"Supply chain efficiencies through e-kanban: A case study","volume":"19","author":"jarupathirun","year":"2011","journal-title":"International Journal of the Computer the Internet and Management"},{"key":"17","first-page":"206","article-title":"Can mrp ii and jit coexist?","author":"jain","year":"1986","journal-title":"International Industrial Engineering Conference Proceedings"},{"key":"23","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4020-8737-0_18"},{"key":"18","first-page":"7","article-title":"MRP, MRP II, OPT, JIT, and CIM-succession, evolution, or necessary combination","volume":"32","author":"ptak","year":"1991","journal-title":"Production and Inventory Management Journal"},{"key":"24","doi-asserted-by":"publisher","DOI":"10.5081\/jgps.6.2.158"},{"key":"15","first-page":"144","article-title":"MRP II, JIT and OPT: Not a choice but a synergy","author":"everdell","year":"1984","journal-title":"APICS 27th Annual International Conference"},{"key":"16","first-page":"152","article-title":"JIT vs. MRP-Exploding the myths","author":"loebel","year":"1984","journal-title":"APICS 27th Annual International Conference"},{"key":"13","first-page":"1","article-title":"A holonic shop floor workforce allocation system","author":"saadat","year":"2010","journal-title":"5th International Conference on System of Systems Engineering"},{"key":"14","doi-asserted-by":"publisher","DOI":"10.1016\/S0166-3615(98)00102-X"},{"key":"11","article-title":"Planning and scheduling a multiskilled workforce","author":"haas","year":"1999","journal-title":"A Report of Centre for Construction Industry Studies"},{"key":"12","doi-asserted-by":"publisher","DOI":"10.1061\/40671(2003)4"},{"key":"21","doi-asserted-by":"publisher","DOI":"10.1108\/01443579310027752"},{"key":"3","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2005.10.045"},{"key":"20","doi-asserted-by":"publisher","DOI":"10.1080\/00207549108930074"},{"key":"2","doi-asserted-by":"publisher","DOI":"10.1023\/B:ANOR.0000019096.58882.54"},{"key":"1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2007.11.005"},{"key":"10","doi-asserted-by":"publisher","DOI":"10.1080\/15578771003590284"},{"key":"7","first-page":"53","article-title":"The human problems of an industrial civilization","volume":"6","author":"mayo","year":"2003","journal-title":"The Early Sociology of Management and Organizations"},{"journal-title":"Extreme Manufacturing-what Are the Technology Needs for Long-term US Manufacturing Competitiveness in Extreme Manufacturing Workshop","year":"2011","key":"6"},{"journal-title":"Just-in-time Manufacturing An Introduction","year":"1996","author":"cheng","key":"5"},{"key":"4","doi-asserted-by":"publisher","DOI":"10.1086\/209811"},{"journal-title":"Human Resource Planning","year":"1980","author":"walker","key":"9"},{"key":"8","doi-asserted-by":"publisher","DOI":"10.1186\/1471-2288-7-30"}],"event":{"name":"2013 IEEE\/ASME International Conference on Advanced Intelligent Mechatronics (AIM)","start":{"date-parts":[[2013,7,9]]},"location":"Wollongong, NSW","end":{"date-parts":[[2013,7,12]]}},"container-title":["2013 IEEE\/ASME International Conference on Advanced Intelligent Mechatronics"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6578014\/6584055\/06584217.pdf?arnumber=6584217","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,3,22]],"date-time":"2017-03-22T23:53:01Z","timestamp":1490226781000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/6584217\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,7]]},"references-count":24,"URL":"https:\/\/doi.org\/10.1109\/aim.2013.6584217","relation":{},"subject":[],"published":{"date-parts":[[2013,7]]}}}