{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,12,12]],"date-time":"2025-12-12T13:35:13Z","timestamp":1765546513750,"version":"3.44.0"},"reference-count":25,"publisher":"IEEE","license":[{"start":{"date-parts":[[2019,9,1]],"date-time":"2019-09-01T00:00:00Z","timestamp":1567296000000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2019,9,1]],"date-time":"2019-09-01T00:00:00Z","timestamp":1567296000000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2019,9]]},"DOI":"10.1109\/amps.2019.8897793","type":"proceedings-article","created":{"date-parts":[[2019,11,25]],"date-time":"2019-11-25T18:21:07Z","timestamp":1574706067000},"page":"1-6","source":"Crossref","is-referenced-by-count":10,"title":["Optimal Probabilistic PMU Placement in Electric Distribution System State Estimation"],"prefix":"10.1109","author":[{"given":"Ali","family":"Arefi","sequence":"first","affiliation":[{"name":"Murdoch University,Discipline of Engineering and Energy,Perth,Australia"}]},{"given":"Mahmood-Reza","family":"Haghifam","sequence":"additional","affiliation":[{"name":"Tarbiat Modares University,Department of Electrical and Computer Engineering,Tehran,Iran"}]},{"given":"Seyed-Hamid","family":"Fathi","sequence":"additional","affiliation":[{"name":"Amirkabir University of Technology,Department of Electrical Engineering,Tehran,Iran"}]},{"given":"Behnaz","family":"Behi","sequence":"additional","affiliation":[{"name":"Murdoch University,Discipline of Engineering and Energy,Perth,Australia"}]},{"given":"S. Ehsan","family":"Razavi","sequence":"additional","affiliation":[{"name":"Murdoch University,Discipline of Engineering and Energy,Perth,Australia"}]},{"given":"Philip","family":"Jennings","sequence":"additional","affiliation":[{"name":"Murdoch University,Discipline of Engineering and Energy,Perth,Australia"}]}],"member":"263","reference":[{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijepes.2010.01.024"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2010.12.025"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1016\/j.measurement.2018.09.072"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2008.920727"},{"key":"ref14","first-page":"1","article-title":"Probabilistic multistage PMU placement in electric power systems","volume":"pp","author":"aminifar","year":"2010","journal-title":"Power Delivery IEEE Transactions on"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1109\/TIM.2015.2494619"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1109\/I2MTC.2013.6555410"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1109\/TIM.2018.2792890"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2009.2016457"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2011.2118771"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1080\/15325000802046918"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1109\/JPROC.2011.2107490"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1049\/ip-gtd:20041226"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2003.821426"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1109\/59.871717"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1109\/TIM.2008.2005856"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2010.2091656"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1049\/iet-gtd.2009.0709"},{"key":"ref1","doi-asserted-by":"crossref","first-page":"225","DOI":"10.1109\/TSG.2010.2080328","article-title":"The Next Generation of Power Distribution Systems","volume":"1","author":"heydt","year":"2010","journal-title":"IEEE Transactions on Smart Grid"},{"key":"ref20","doi-asserted-by":"publisher","DOI":"10.1109\/ISGTEurope.2017.8260120"},{"key":"ref22","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2017.2718511"},{"key":"ref21","first-page":"247","article-title":"Synchronized phasor measurements and their applications","author":"phadke","year":"2008","journal-title":"Power Electronics and Power Systems"},{"key":"ref24","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2010.2051821"},{"key":"ref23","doi-asserted-by":"publisher","DOI":"10.1109\/PESW.2001.916993"},{"key":"ref25","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijepes.2011.01.006"}],"event":{"name":"2019 IEEE 10th International Workshop on Applied Measurements for Power Systems (AMPS)","start":{"date-parts":[[2019,9,25]]},"location":"Aachen, Germany","end":{"date-parts":[[2019,9,27]]}},"container-title":["2019 IEEE 10th International Workshop on Applied Measurements for Power Systems (AMPS)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/8891870\/8897706\/08897793.pdf?arnumber=8897793","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,9,1]],"date-time":"2025-09-01T19:18:49Z","timestamp":1756754329000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/8897793\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,9]]},"references-count":25,"URL":"https:\/\/doi.org\/10.1109\/amps.2019.8897793","relation":{},"subject":[],"published":{"date-parts":[[2019,9]]}}}