{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,12,31]],"date-time":"2025-12-31T12:20:10Z","timestamp":1767183610440},"reference-count":38,"publisher":"IEEE","license":[{"start":{"date-parts":[[2024,9,18]],"date-time":"2024-09-18T00:00:00Z","timestamp":1726617600000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2024,9,18]],"date-time":"2024-09-18T00:00:00Z","timestamp":1726617600000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2024,9,18]]},"DOI":"10.1109\/amps62611.2024.10706693","type":"proceedings-article","created":{"date-parts":[[2024,10,9]],"date-time":"2024-10-09T17:46:00Z","timestamp":1728495960000},"page":"1-6","source":"Crossref","is-referenced-by-count":3,"title":["PMU Implementation Using IEC61850 Sampled Values Implemented in a CPC Platform"],"prefix":"10.1109","author":[{"given":"Anibal Antonio","family":"Prada Hurtado","sequence":"first","affiliation":[{"name":"Infrastructure of Electric Grids Group, CIRCE Research Centre,Zaragoza,Spain"}]},{"given":"Mario","family":"Manana","sequence":"additional","affiliation":[{"name":"Universidad de Cantabria,Department of Electrical and Energy Engineering,Santander,Spain"}]},{"given":"Maria Teresa","family":"Vill\u00e9n Mart\u00ednez","sequence":"additional","affiliation":[{"name":"Infrastructure of Electric Grids Group, CIRCE Research Centre,Zaragoza,Spain"}]},{"given":"Miguel \u00c1ngel","family":"Oliv\u00e1n Monge","sequence":"additional","affiliation":[{"name":"ICT Integration Group, CIRCE Research Centre,Zaragoza,Spain"}]},{"given":"Eduardo Martinez","family":"Carrasco","sequence":"additional","affiliation":[{"name":"Infrastructure of Electric Grids Group, CIRCE Research Centre,Zaragoza,Spain"}]},{"given":"Carlos Rodriguez","family":"del Castillo","sequence":"additional","affiliation":[{"name":"Elewit (A company of Redeia),Madrid,Spain"}]}],"member":"263","reference":[{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1049\/icp.2022.0969"},{"volume-title":"Fault current injection from power electronic interfaced devices","year":"2020","author":"Thengius","key":"ref2"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1109\/pesgm40551.2019.8973779"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1016\/j.rser.2022.112842"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1016\/j.energy.2020.117776"},{"volume-title":"Impact of Inverter Based Generation on Bulk Power System Dynamics and Short-Circuit Performance","year":"2018","author":"Jones","key":"ref6"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1109\/acpee48638.2020.9136471"},{"key":"ref8","first-page":"1","article-title":"IEEE\/IEC International Standard - Measuring relays and protection equipment - Part 118\u20131: Synchrophasor for power systems - Measurements","volume-title":"IEC\/ IEEE 60255-118\u20131:2018","year":"2018"},{"key":"ref9","first-page":"1","article-title":"IEEE Standard for Synchrophasor Measurements for Power Systems","volume-title":"IEEE Std C37.118.1\u20132011 (Revision of IEEE Std C37.118-2005)","year":"2011"},{"key":"ref10","first-page":"1","article-title":"IEEE Standard for Synchrophasor Measurements for Power Systems \u2014 Amendment 1: Modification of Selected Performance Requirements","volume-title":"IEEE Std C37.118.1 a-2014 (Amendment to IEEE Std C37.118.1\u20132011)","year":"2014"},{"key":"ref11","first-page":"1","article-title":"IEEE Standard for Synchrophasor Data Transfer for Power Systems","volume-title":"IEEE Std C37.118.2\u20132011 (Revision of IEEE Std C37.118-2005)","year":"2011"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1109\/JPROC.2010.2060450"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1177\/0020294021989768"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1049\/joe.2018.8752"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1109\/CPRE.2014.6798992"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.3390\/en15093470"},{"key":"ref17","article-title":"Implementation guideline for digital interface to instrument transformers using IEC 61850\u20139-2","volume-title":"Tech. Rep.","author":"Brunner","year":"2004"},{"article-title":"IEC 61850\u20139-2:2011+AMD1:2020 CSV IEC Webstore cyber security","volume-title":"smart city, LVDC","year":"2024","key":"ref18"},{"journal-title":"Measurement, Recording & Time Sync","year":"2024","key":"ref19"},{"volume-title":"SEL Sampled Values (SV) Process Bus Solutions","year":"2024","key":"ref20"},{"volume-title":"MERGING UNIT APPLICATION FOR SYNCHRONIZED PHASOR MEASUREMENTS","year":"2024","author":"Agostini","key":"ref21"},{"key":"ref22","doi-asserted-by":"publisher","DOI":"10.1109\/I2MTC50364.2021.9460086"},{"key":"ref23","doi-asserted-by":"publisher","DOI":"10.1109\/AMPS50177.2021.9586036"},{"journal-title":"Phasor Measurement Unit With Digital Inputs: Synchronization and Interoperability Issues IEEE Journals & Magazine IEEE Xplore","year":"2024","key":"ref24"},{"volume-title":"Docker: Accelerated Container Application Development","year":"2024","key":"ref25"},{"volume-title":"Plataforma EPICS: implementaci\u00f3n flexible y escalable de sistemas autom\u00e1ticos","year":"2022","key":"ref26"},{"key":"ref27","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2024.3354718"},{"key":"ref28","doi-asserted-by":"publisher","DOI":"10.1109\/ISGTEUROPE56780.2023.10408455"},{"article-title":"A computer-assisted Faulted Phase Selection Algorithm for dealing with the effects of Renewable Resources in Smart grids","volume-title":"NEIS Conference on Sustainable Energy Supply and Energy Storage System","author":"Villen Martinez","key":"ref29"},{"volume-title":"IEC 61869\u20139:2016 IEC Webstore Lvdc","year":"2024","key":"ref30"},{"volume-title":"SEL-3555 Real-Time Automation Controller (RTAC) - Documentation\u2019, selinc.com","year":"2024","key":"ref31"},{"volume-title":"SEL-5703 Synchrowave Monitoring Real-Time and Historic Trending and Archiving - Documentation","year":"2024","key":"ref32"},{"volume-title":"An Automated Test Setup for Performance Evaluation of a Phasor Measurement Unit","year":"2016","author":"Gurusinghe","key":"ref33"},{"volume-title":"Tool for testing of phasor measurement units: PMU performance analyser - Biswas - 2015 - IET Generation, Transmission & Distribution - Wiley Online Library","year":"2024","key":"ref34"},{"volume-title":"New Developments at RTDS Technologies","year":"2024","key":"ref35"},{"volume-title":"PLC Controls with Structured Text (ST), V3: IEC 61131\u20133 and best practice ST programming","year":"2020","author":"Antonsen","key":"ref36"},{"article-title":"SEL RTAC Programming Reference 2021","volume-title":"Schweitzer Engineering Laboratories, Inc.","year":"2021","key":"ref37"},{"article-title":"ACSELERATOR RTAC\u00aeSEL-5033 Software, Instruction Manual 2020","volume-title":"Schweitzer Engineering Laboratories, Inc.","year":"2020","key":"ref38"}],"event":{"name":"2024 IEEE 14th International Workshop on Applied Measurements for Power Systems (AMPS)","start":{"date-parts":[[2024,9,18]]},"location":"Caserta, Italy","end":{"date-parts":[[2024,9,20]]}},"container-title":["2024 IEEE 14th International Workshop on Applied Measurements for Power Systems (AMPS)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx8\/10706658\/10706659\/10706693.pdf?arnumber=10706693","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,10,10]],"date-time":"2024-10-10T17:21:35Z","timestamp":1728580895000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/10706693\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024,9,18]]},"references-count":38,"URL":"https:\/\/doi.org\/10.1109\/amps62611.2024.10706693","relation":{},"subject":[],"published":{"date-parts":[[2024,9,18]]}}}