{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,8,26]],"date-time":"2025-08-26T00:15:54Z","timestamp":1756167354121,"version":"3.44.0"},"reference-count":9,"publisher":"IEEE","license":[{"start":{"date-parts":[[2012,11,1]],"date-time":"2012-11-01T00:00:00Z","timestamp":1351728000000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2012,11,1]],"date-time":"2012-11-01T00:00:00Z","timestamp":1351728000000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2012,11]]},"DOI":"10.1109\/asscc.2012.6523235","type":"proceedings-article","created":{"date-parts":[[2013,6,13]],"date-time":"2013-06-13T16:53:29Z","timestamp":1371142409000},"page":"37-41","source":"Crossref","is-referenced-by-count":4,"title":["Power system risk assessment based on cascading failures and malfunction scene selection"],"prefix":"10.1109","author":[{"given":"W.","family":"Qin","sequence":"first","affiliation":[{"name":"College of Electrical &amp; Power Engineering, Taiyuan University of Technology, Taiyuan, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"H.","family":"Wei","sequence":"additional","affiliation":[{"name":"College of Electrical &amp; Power Engineering, Taiyuan University of Technology, Taiyuan, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"W.","family":"Zhao","sequence":"additional","affiliation":[{"name":"College of Electrical &amp; Power Engineering, Taiyuan University of Technology, Taiyuan, China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"J.","family":"Zhang","sequence":"additional","affiliation":[{"name":"Shanxi Taiyuan Power Supply Branch Co., Taiyuan, China"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"3","article-title":"Reliability of short-term evaluation of probability of instantaneous","volume":"28","author":"cheng","year":"2008","journal-title":"Proceding of the CSEE"},{"key":"2","article-title":"Impact of transmission line's real-time reliability model parameter upon power system operational reliability evaluation","author":"sun","year":"2006","journal-title":"Proceedings of the CSEE"},{"key":"1","doi-asserted-by":"publisher","DOI":"10.1109\/59.898097"},{"key":"7","first-page":"14","article-title":"Risk assessment of power system cascading failure considering hidden failures of protective relayings","volume":"30","author":"chen","year":"2007","journal-title":"Power System Technology"},{"key":"6","first-page":"1","article-title":"PowerSystem key-lines identification based on hidden failure model and risk theory","volume":"31","author":"ding","year":"2007","journal-title":"Automation of Electric Power Systems"},{"key":"5","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2004.835656"},{"key":"4","doi-asserted-by":"crossref","first-page":"39","DOI":"10.1109\/HICSS.1998.656010","article-title":"An importance sampling application: 179 bus WSCC system under voltage based hidden failures and relay misoperations","volume":"3","author":"bae","year":"1998","journal-title":"Proceedings of the Thirty-First Hawaii International Conference"},{"key":"9","doi-asserted-by":"publisher","DOI":"10.1109\/PESS.1999.784345"},{"key":"8","article-title":"Analysis of power system cascading failure based on hidden failures of protective relaying","volume":"38","author":"yang","year":"2010","journal-title":"Power system protection and control"}],"event":{"name":"2012 10th International Power & Energy Conference (IPEC)","start":{"date-parts":[[2012,12,12]]},"location":"Ho Chi Minh City, Vietnam","end":{"date-parts":[[2012,12,14]]}},"container-title":["2012 10th International Power &amp; Energy Conference (IPEC)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6518040\/6523226\/06523235.pdf?arnumber=6523235","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,8,25]],"date-time":"2025-08-25T20:20:03Z","timestamp":1756153203000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/6523235\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012,11]]},"references-count":9,"URL":"https:\/\/doi.org\/10.1109\/asscc.2012.6523235","relation":{},"subject":[],"published":{"date-parts":[[2012,11]]}}}