{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,3,12]],"date-time":"2025-03-12T22:40:31Z","timestamp":1741819231983,"version":"3.38.0"},"reference-count":23,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2011,8]]},"DOI":"10.1109\/case.2011.6042398","type":"proceedings-article","created":{"date-parts":[[2011,10,13]],"date-time":"2011-10-13T20:57:26Z","timestamp":1318539446000},"page":"462-467","source":"Crossref","is-referenced-by-count":8,"title":["A GERT-based analytical method for remanufacturing process routing"],"prefix":"10.1109","author":[{"given":"Congbo","family":"Li","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ying","family":"Tang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Chengchuan","family":"Li","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2010.06.015"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1111\/j.1937-5956.2009.01067.x"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1080\/00207540410001716499"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1016\/j.omega.2005.01.007"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1007\/s00291-005-0009-0"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1080\/00207540701636355"},{"key":"ref16","first-page":"267","article-title":"GERT: Graphical evaluation and review technique. Part I. Fundamentals","volume":"17","author":"pritsker","year":"1966","journal-title":"Journal of Industrial Engineering"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1109\/TR.2006.890894"},{"key":"ref18","doi-asserted-by":"crossref","first-page":"837","DOI":"10.1016\/0026-2714(94)E0032-I","article-title":"GERT analysis of a two-unit cold standby system with repair","volume":"35","author":"gauri","year":"1995","journal-title":"Microelectronics and Reliability"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1016\/0304-4149(86)90018-9"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(02)00454-X"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1016\/S0921-8009(99)00110-X"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1007\/s11771-005-0015-z"},{"key":"ref5","doi-asserted-by":"crossref","first-page":"999","DOI":"10.1016\/j.jclepro.2009.02.021","article-title":"Product life-cycle implications for remanufacturing strategies","volume":"17","author":"johan","year":"2009","journal-title":"Journal of Cleaner Production"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1111\/j.1937-5956.2006.tb00253.x"},{"key":"ref7","first-page":"1","article-title":"Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art","author":"ilgin","year":"2009","journal-title":"Journal of Environmental Management"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1016\/S0305-0548(96)00023-8"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1016\/S0736-5845(99)00020-4"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2008.09.028"},{"key":"ref20","doi-asserted-by":"crossref","first-page":"4820","DOI":"10.1016\/j.ces.2007.06.041","article-title":"An algorithm for the estimation of parameters in models with stochastic differential equations","volume":"63","author":"l\u00f3a","year":"2008","journal-title":"Chemical Engineering Science"},{"key":"ref22","doi-asserted-by":"publisher","DOI":"10.1016\/S1671-2927(09)60193-0"},{"key":"ref21","doi-asserted-by":"crossref","first-page":"521","DOI":"10.1016\/S0360-8352(02)00050-5","article-title":"Efficient monte carlo simulation method of GERT-type network for project management","volume":"42","author":"kenzo","year":"2002","journal-title":"Computer and Industrial Engineering"},{"key":"ref23","doi-asserted-by":"crossref","first-page":"221","DOI":"10.1007\/PL00020914","article-title":"Time complexity of single-and-identical parallel machine scheduling with GERT network precedence constraints","volume":"49","author":"zimmermann","year":"1999","journal-title":"Mathematical Methods of Operations Research"}],"event":{"name":"2011 IEEE International Conference on Automation Science and Engineering (CASE 2011)","start":{"date-parts":[[2011,8,24]]},"location":"Trieste, Italy","end":{"date-parts":[[2011,8,27]]}},"container-title":["2011 IEEE International Conference on Automation Science and Engineering"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx5\/6033676\/6042395\/06042398.pdf?arnumber=6042398","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,3,12]],"date-time":"2025-03-12T22:00:57Z","timestamp":1741816857000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/6042398\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2011,8]]},"references-count":23,"URL":"https:\/\/doi.org\/10.1109\/case.2011.6042398","relation":{},"subject":[],"published":{"date-parts":[[2011,8]]}}}