{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,16]],"date-time":"2025-10-16T10:12:10Z","timestamp":1760609530067,"version":"3.28.0"},"reference-count":19,"publisher":"IEEE","license":[{"start":{"date-parts":[[2023,8,26]],"date-time":"2023-08-26T00:00:00Z","timestamp":1693008000000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2023,8,26]],"date-time":"2023-08-26T00:00:00Z","timestamp":1693008000000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2023,8,26]]},"DOI":"10.1109\/case56687.2023.10260517","type":"proceedings-article","created":{"date-parts":[[2023,9,28]],"date-time":"2023-09-28T17:32:23Z","timestamp":1695922343000},"page":"1-6","source":"Crossref","is-referenced-by-count":1,"title":["Unlocking Insights: Analysing Construction Issues in Request for Information (RFI) Documents with Text Mining and Visualisation"],"prefix":"10.1109","author":[{"given":"Muneeb","family":"Afzal","sequence":"first","affiliation":[{"name":"School of Design, Architecture and Building, University of Technology,Sydney, Broadway,NSW,Australia,2007"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Johnny Kwok","family":"Wai Wong","sequence":"additional","affiliation":[{"name":"School of Design, Architecture and Building, University of Technology,Sydney, Broadway,NSW,Australia,2007"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Alireza Ahmadian","family":"Fard Fini","sequence":"additional","affiliation":[{"name":"School of Design, Architecture and Building, University of Technology,Sydney, Broadway,NSW,Australia,2007"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref13","first-page":"779 955","article-title":"Investigating the potential of BIM to address project delivery issues","volume":"2","author":"bhat","year":"2017","journal-title":"6th CSCE-CRC International Construction Specialty Conference 2017 - Held as Part of the Canadian Society for Civil Engineering Annual Conference and General Meeting 2017"},{"journal-title":"SmartMarket Report Design and Construction 704 Intelligence","article-title":"Building information modeling (BIM), transforming design and construction to achieve greater industry productivity","year":"2008","key":"ref12"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1016\/S0926-5805(03)00004-9"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)LA.1943-4170.0000308"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1007\/s40999-021-00658-0"},{"key":"ref10","article-title":"A Secure and Distributed Construction Document Management System Using Blockchain","volume":"98","author":"das","year":"2020","journal-title":"ICCCBE 2020 Lecture Notes in 877 Civil Engineering"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1080\/014461996373467"},{"journal-title":"Complexity-Construction in A New Perspective","year":"2003","author":"bertelsen","key":"ref1"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2018.03.009"},{"key":"ref16","doi-asserted-by":"crossref","first-page":"45","DOI":"10.1016\/j.autcon.2015.11.001","article-title":"Automated content analysis for construction safety: A natural language processing system to extract precursors and outcomes from unstructured injury reports","volume":"62","author":"tixier","year":"2015","journal-title":"Autom Constr"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.3390\/app7111141"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2018.06.011"},{"key":"ref8","first-page":"1","article-title":"Performance outcome assessment of the integrated project delivery (IPD) method for commercial construction projects in USA","author":"kelly","year":"2020","journal-title":"International Journal of Construction 722 Management"},{"key":"ref7","doi-asserted-by":"crossref","first-page":"4","DOI":"10.1080\/09544828.2014.935305","article-title":"Assessing the impact of RFls in electrical and instrumentation engineering contracts","volume":"25","author":"love","year":"2014","journal-title":"J Eng Des"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1080\/15623599.2013.10773217"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000648"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1108\/ECAM-01-2016-0003"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1108\/BEPAM-10-2018-0130"},{"key":"ref5","doi-asserted-by":"crossref","first-page":"355","DOI":"10.3390\/su12010355","article-title":"Investigating Critical Non-Value Adding Activities and Their Resulting Wastes in BIM-Based Project Delivery","volume":"12","author":"liao","year":"2020","journal-title":"Sustainability"}],"event":{"name":"2023 IEEE 19th International Conference on Automation Science and Engineering (CASE)","start":{"date-parts":[[2023,8,26]]},"location":"Auckland, New Zealand","end":{"date-parts":[[2023,8,30]]}},"container-title":["2023 IEEE 19th International Conference on Automation Science and Engineering (CASE)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/10260321\/10260291\/10260517.pdf?arnumber=10260517","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,10,16]],"date-time":"2023-10-16T17:54:33Z","timestamp":1697478873000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/10260517\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,8,26]]},"references-count":19,"URL":"https:\/\/doi.org\/10.1109\/case56687.2023.10260517","relation":{},"subject":[],"published":{"date-parts":[[2023,8,26]]}}}