{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,20]],"date-time":"2026-03-20T23:20:59Z","timestamp":1774048859545,"version":"3.50.1"},"reference-count":24,"publisher":"IEEE","license":[{"start":{"date-parts":[[2009,7,1]],"date-time":"2009-07-01T00:00:00Z","timestamp":1246406400000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2009,7,1]],"date-time":"2009-07-01T00:00:00Z","timestamp":1246406400000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2009,7]]},"DOI":"10.1109\/cca.2009.5281013","type":"proceedings-article","created":{"date-parts":[[2009,10,12]],"date-time":"2009-10-12T15:41:39Z","timestamp":1255362099000},"page":"731-738","source":"Crossref","is-referenced-by-count":18,"title":["Evaluating control designs for co-ordinating pump rates and choke valve during managed pressure drilling operations"],"prefix":"10.1109","author":[{"given":"Oyvind","family":"Breyholtz","sequence":"first","affiliation":[{"name":"Petroleum Department, International Research Institute of Stavanger, N-5008 Bergen, Norway"}]},{"given":"Gerhard","family":"Nygaard","sequence":"additional","affiliation":[{"name":"Petroleum Department, International Research Institute of Stavanger, N-5008 Bergen, Norway"}]},{"given":"John-Morten","family":"Godhavn","sequence":"additional","affiliation":[{"name":"StatoilHydro ASA, Research Center Trondheim, N-7005, Norway"}]},{"given":"Erlend H.","family":"Vefring","sequence":"additional","affiliation":[{"name":"Petroleum Department, International Research Institute of Stavanger, N-5008 Bergen, Norway"}]}],"member":"263","reference":[{"key":"19","doi-asserted-by":"publisher","DOI":"10.2523\/97028-MS"},{"key":"22","article-title":"Mpc in statoil - advantages with in-house technology","author":"strand","year":"2003","journal-title":"Proc ADCHEM"},{"key":"17","author":"white","year":"1999","journal-title":"Fluid Mechanics"},{"key":"23","doi-asserted-by":"publisher","DOI":"10.2118\/112100-MS"},{"key":"18","doi-asserted-by":"publisher","DOI":"10.1109\/CDC.2008.4739406"},{"key":"24","year":"0"},{"key":"15","article-title":"A simple dynamic model of drilling for control","author":"kaasa","year":"2007"},{"key":"16","first-page":"88","article-title":"Control algorithms applied to managed pressure drilling operations in depleted reservoirs","volume":"2","author":"nygaard","year":"2008","journal-title":"Science and Technology in Gas Industry (In Russian Nauka i Technologya v gazovoi promushlennosti)"},{"key":"13","doi-asserted-by":"crossref","first-page":"49","DOI":"10.2118\/91578-PA","article-title":"Bottomhole pressure control during drilling operations in gas-dominant wells","volume":"12","author":"nygaard","year":"2007","journal-title":"SPE J"},{"key":"14","article-title":"Adaptive output feedback control of a managed pressure drilling system","author":"zhou","year":"2008","journal-title":"47th IEEE Conference on Decision and Control Dec 9 -11 Cancun Mexico"},{"key":"11","doi-asserted-by":"publisher","DOI":"10.2118\/102842-MS"},{"key":"12","doi-asserted-by":"publisher","DOI":"10.2523\/108344-MS"},{"key":"21","article-title":"Adaptive observer for bottomhole pressure during drilling","author":"stamnes","year":"2007"},{"key":"3","doi-asserted-by":"publisher","DOI":"10.2118\/112651-MS"},{"key":"20","doi-asserted-by":"publisher","DOI":"10.1109\/CDC.2008.4738845"},{"key":"2","article-title":"intelligent' wired drill-pipe system allows operators to take full advantage of latest downhole sensor developments","author":"mcneill","year":"2008","journal-title":"International Petroleum Technology Conference"},{"key":"1","doi-asserted-by":"publisher","DOI":"10.2523\/101855-MS"},{"key":"10","doi-asserted-by":"publisher","DOI":"10.1109\/CCDC.2008.4597975"},{"key":"7","doi-asserted-by":"publisher","DOI":"10.2118\/114484-MS"},{"key":"6","doi-asserted-by":"crossref","DOI":"10.2118\/115118-RU","article-title":"Utilize managed pressure drilling equipment and technique to cement a severely depleted HPHT reservoir in the north sea","author":"bj\ufffdrkevoll","year":"2008","journal-title":"SPE Russian Oil and Gas Technical Conference and Exhibition"},{"key":"5","doi-asserted-by":"publisher","DOI":"10.2118\/119442-MS"},{"key":"4","doi-asserted-by":"crossref","DOI":"10.2118\/108333-MS","article-title":"First field applications of microflux control show very positive surprises","author":"santos","year":"2007","journal-title":"IADC\/SPE Managed Pressure Drilling & Underbalanced Operations"},{"key":"9","article-title":"Nonlinear model predictive pressure control during drilling operations","author":"breyholtz","year":"2008"},{"key":"8","doi-asserted-by":"publisher","DOI":"10.2118\/119884-MS"}],"event":{"name":"2009 IEEE Control Applications, (CCA) & Intelligent Control, (ISIC)","location":"St. Petersburg, Russia","start":{"date-parts":[[2009,7,8]]},"end":{"date-parts":[[2009,7,10]]}},"container-title":["2009 IEEE Control Applications, (CCA) &amp; Intelligent Control, (ISIC)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx5\/5268173\/5280693\/05281013.pdf?arnumber=5281013","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,3,20]],"date-time":"2026-03-20T22:44:53Z","timestamp":1774046693000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/5281013\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2009,7]]},"references-count":24,"URL":"https:\/\/doi.org\/10.1109\/cca.2009.5281013","relation":{},"subject":[],"published":{"date-parts":[[2009,7]]}}}