{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,29]],"date-time":"2024-10-29T11:59:30Z","timestamp":1730203170241,"version":"3.28.0"},"reference-count":7,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2015,5]]},"DOI":"10.1109\/ccece.2015.7129194","type":"proceedings-article","created":{"date-parts":[[2015,6,26]],"date-time":"2015-06-26T22:04:53Z","timestamp":1435356293000},"page":"248-253","source":"Crossref","is-referenced-by-count":1,"title":["A new criterion for GCB open-phase protection in large pumped storage units"],"prefix":"10.1109","author":[{"given":"Heting","family":"Li","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Lin","family":"Gui","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jun","family":"Chen","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Rufei","family":"He","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Shichao","family":"Liu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Xiaoyu","family":"Wang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref4","first-page":"5","article-title":"Study on Problems about the Open-phase Protection of Larger Generators","volume":"3","author":"zhou","year":"2009","journal-title":"IEEE Trans Zhejiang Electric Power"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1109\/PES.2006.1708909"},{"key":"ref6","first-page":"22","article-title":"Analysis on the Safe Running of Generators and Systems Based on the Open-phase Fault of Large Generators","volume":"4","author":"hou","year":"2007","journal-title":"IEEE Trans Hubei Electric Power"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1049\/cp.2014.0101"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1109\/APEMC.2012.6237954"},{"key":"ref2","first-page":"215","article-title":"Analysis on the false action and operation criteria for the generator circuit breaker failure protection","volume":"1","author":"pengyue","year":"2011","journal-title":"Advanced Power System Automation and Protection (APAP) 2011 International Conference on"},{"key":"ref1","first-page":"235","article-title":"Application of the Relay Protection in Generators and Transformers","author":"wang","year":"2005"}],"event":{"name":"2015 IEEE 28th Canadian Conference on Electrical and Computer Engineering (CCECE)","start":{"date-parts":[[2015,5,3]]},"location":"Halifax, NS, Canada","end":{"date-parts":[[2015,5,6]]}},"container-title":["2015 IEEE 28th Canadian Conference on Electrical and Computer Engineering (CCECE)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/7120003\/7129089\/07129194.pdf?arnumber=7129194","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,3,24]],"date-time":"2017-03-24T19:09:23Z","timestamp":1490382563000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/7129194\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,5]]},"references-count":7,"URL":"https:\/\/doi.org\/10.1109\/ccece.2015.7129194","relation":{},"subject":[],"published":{"date-parts":[[2015,5]]}}}