{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,3]],"date-time":"2025-10-03T22:27:41Z","timestamp":1759530461415,"version":"3.28.0"},"reference-count":24,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2013,4]]},"DOI":"10.1109\/cies.2013.6611725","type":"proceedings-article","created":{"date-parts":[[2013,10,1]],"date-time":"2013-10-01T14:40:29Z","timestamp":1380638429000},"page":"29-34","source":"Crossref","is-referenced-by-count":8,"title":["A multi-objective particle swarm optimization for dual-resource constrained shop scheduling with resource flexibility"],"prefix":"10.1109","author":[{"given":"Jing","family":"Zhang","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Wanliang","family":"Wang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Xinli","family":"Xu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jing","family":"Jie","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"19","doi-asserted-by":"crossref","first-page":"671","DOI":"10.1126\/science.220.4598.671","article-title":"Optimization by simulated annealing","volume":"220","author":"kirkpatrick","year":"1983","journal-title":"Science"},{"doi-asserted-by":"publisher","key":"22","DOI":"10.1109\/TSMCC.2002.1009117"},{"doi-asserted-by":"publisher","key":"17","DOI":"10.1016\/j.cor.2006.12.030"},{"doi-asserted-by":"publisher","key":"23","DOI":"10.1016\/j.ijpe.2010.08.004"},{"key":"18","first-page":"513","article-title":"An improved particle swarm algorithm for batch scheduling problem in flexible job shop","volume":"27","author":"zhang","year":"2012","journal-title":"Control and Decision"},{"doi-asserted-by":"publisher","key":"24","DOI":"10.1007\/s00170-011-3610-1"},{"doi-asserted-by":"publisher","key":"15","DOI":"10.1007\/s00170-010-2743-y"},{"doi-asserted-by":"publisher","key":"16","DOI":"10.1016\/j.cor.2007.02.014"},{"key":"13","doi-asserted-by":"crossref","first-page":"275","DOI":"10.1007\/978-3-642-29353-5_32","article-title":"Solving fuzzy job-shop scheduling problem by a hybrid PSO algorithm","volume":"7269","author":"li","year":"2012","journal-title":"Lect Notes Comput Sci"},{"key":"14","first-page":"715","article-title":"Hybrid particle-swarm optimization for multi-objective flexible job-shop scheduling problem","volume":"29","author":"zhang","year":"2012","journal-title":"Control Theory & Applications"},{"doi-asserted-by":"publisher","key":"11","DOI":"10.1080\/03052151003686716"},{"doi-asserted-by":"publisher","key":"12","DOI":"10.1016\/j.asoc.2012.04.007"},{"key":"21","article-title":"Global neighborhood algorithm for Job Shop scheduling problem","volume":"15","author":"cui","year":"2009","journal-title":"Computer Integrated Manufacturing Systems"},{"key":"3","first-page":"376","article-title":"Intelligent optimization for job shop scheduling of dual-resources","volume":"35","author":"sun","year":"2005","journal-title":"Journal of Southeast University (Natural Science Edition)"},{"doi-asserted-by":"publisher","key":"20","DOI":"10.1016\/j.eswa.2009.06.007"},{"doi-asserted-by":"publisher","key":"2","DOI":"10.3901\/JME.2010.22.175"},{"key":"1","first-page":"12","author":"wang","year":"2007","journal-title":"Production Scheduling Intelligent Algorithm and Application 1rd Ed"},{"doi-asserted-by":"publisher","key":"10","DOI":"10.1109\/TEVC.2004.826067"},{"doi-asserted-by":"publisher","key":"7","DOI":"10.1080\/07408170701748877"},{"doi-asserted-by":"publisher","key":"6","DOI":"10.1109\/TASE.2010.2052356"},{"doi-asserted-by":"publisher","key":"5","DOI":"10.1016\/S0278-6125(00)80011-4"},{"doi-asserted-by":"publisher","key":"4","DOI":"10.1016\/S0007-8506(07)63204-1"},{"key":"9","first-page":"107","article-title":"Research on bi-objective scheduling optimization for DRC job shop","volume":"10","author":"liu","year":"2009","journal-title":"Modular Machine Tool & Automatic Manufacturing Technique"},{"key":"8","first-page":"1761","article-title":"Double-objective inherited genetic algorithm for dual resource constrained job shop","volume":"26","author":"li","year":"2011","journal-title":"Control and Decision"}],"event":{"name":"2013 IEEE Symposium on Computational Intelligence for Engineering Solutions (CIES)","start":{"date-parts":[[2013,4,16]]},"location":"singapore, Singapore","end":{"date-parts":[[2013,4,19]]}},"container-title":["2013 IEEE Symposium on Computational Intelligence for Engineering Solutions (CIES)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6596007\/6611719\/06611725.pdf?arnumber=6611725","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,6,21]],"date-time":"2017-06-21T18:56:09Z","timestamp":1498071369000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/6611725\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,4]]},"references-count":24,"URL":"https:\/\/doi.org\/10.1109\/cies.2013.6611725","relation":{},"subject":[],"published":{"date-parts":[[2013,4]]}}}