{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,23]],"date-time":"2024-10-23T03:22:22Z","timestamp":1729653742125,"version":"3.28.0"},"reference-count":28,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2012,10]]},"DOI":"10.1109\/clei.2012.6427172","type":"proceedings-article","created":{"date-parts":[[2013,2,8]],"date-time":"2013-02-08T22:05:06Z","timestamp":1360361106000},"page":"1-8","source":"Crossref","is-referenced-by-count":0,"title":["Multi-objective algorithms for the single machine scheduling problems with setup time dependent on the sequence and the job family"],"prefix":"10.1109","author":[{"family":"Marcelo Ferreira Rego","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Marcone Jamilson Freitas","family":"Souza","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jose Elias Claudio","family":"Arroyo","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"19","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(99)00328-8"},{"key":"17","doi-asserted-by":"publisher","DOI":"10.1007\/0-306-48056-5_11"},{"key":"18","doi-asserted-by":"publisher","DOI":"10.1057\/jors.2009.63"},{"key":"15","doi-asserted-by":"crossref","first-page":"169","DOI":"10.1590\/S0101-74382006000100009","article-title":"An analysis of the importance of appropriate tie breaking rules in dispatch heuristics","volume":"26","author":"valente","year":"2006","journal-title":"Pesquisa Operacional"},{"key":"16","doi-asserted-by":"publisher","DOI":"10.1016\/S0305-0548(97)00031-2"},{"key":"13","doi-asserted-by":"publisher","DOI":"10.1287\/ijoc.1070.0258"},{"journal-title":"Heuri?stica e Metaheuri?stica Para Otimizac?a?o Combi-nato?ria Multiobjetivo","year":"2002","author":"arroyo","key":"14"},{"key":"11","doi-asserted-by":"publisher","DOI":"10.1016\/j.entcs.2011.11.022"},{"key":"12","first-page":"1801","article-title":"Algoritmo vns multi-objetivo para um problema de programac?a?o de tarefas em uma ma?quina com janelas de entrega","author":"ottoni","year":"2011","journal-title":"Simpo?sio Brasileiro de Pesquisa Operacional (SBPO)"},{"journal-title":"Evaluating the quality of approximations to the non-dominated set","year":"1998","author":"hansen","key":"21"},{"key":"20","doi-asserted-by":"crossref","first-page":"75","DOI":"10.1023\/A:1018903027868","article-title":"Single machine scheduling with batch set-up times to minimize maximum lateness","volume":"70","author":"hariri","year":"1997","journal-title":"Annals of Operations Research"},{"key":"22","doi-asserted-by":"publisher","DOI":"10.1162\/106365600568202"},{"key":"23","article-title":"Running performance metrics for evolutionary multi-objective optimization","author":"deb","year":"2002","journal-title":"Tech Rep"},{"key":"24","article-title":"A tutorial on the performance assessment of stochastic multiobjective optimizers","volume":"216","author":"fonseca","year":"2005","journal-title":"Third International Conference on Evolutionary Multi-Criterion Optimization (EMO"},{"key":"25","doi-asserted-by":"crossref","first-page":"292","DOI":"10.1007\/BFb0056872","article-title":"Multiobjective optimization using evolutionary algorithms- A comparative case study","author":"zitzler","year":"1998","journal-title":"Parallel Problem Solving from Nature-PPSN V"},{"journal-title":"R A Language and Environment for Statistical Computing","year":"2011","key":"26"},{"journal-title":"Ana?lise de varia?ncia (ANOVA)","year":"2006","author":"vieira","key":"27"},{"journal-title":"Descobrindo A Estati?stica Usando O Spss","year":"2009","author":"field","key":"28"},{"key":"3","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2008.09.025"},{"key":"2","doi-asserted-by":"publisher","DOI":"10.1016\/S0736-5845(02)00013-3"},{"key":"10","first-page":"1951","article-title":"Improvements for multi-objective flow shop scheduling by pareto iterated local search","author":"geiger","year":"2009","journal-title":"Proceedings of the 6th Metaheuristics International Conference (MIC)"},{"key":"1","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(00)00197-1"},{"key":"7","doi-asserted-by":"publisher","DOI":"10.1109\/4235.996017"},{"journal-title":"Minimizac?a?o Do Custo de Antecipac?a?o e Atraso Para O Problema de Sequenciamento de Uma Ma?quina Com Tempo de Preparac?a?o Dependente da Seque?ncia Aplicac?a?o em Uma Usina Sideru?rgica","year":"2007","author":"bustamante","key":"6"},{"journal-title":"Scheduling Theory Algorithms and Systems","year":"2008","author":"pinedo","key":"5"},{"journal-title":"Scheduling Algorithms","year":"2007","author":"brucker","key":"4"},{"key":"9","first-page":"34","article-title":"Randomised variable neighbourhood search for multi objective optimisation","author":"geiger","year":"2004","journal-title":"4th EU\/ME Design and Evaluation of Advanced Hybrid Meta-Heuristics"},{"key":"8","doi-asserted-by":"publisher","DOI":"10.1109\/4235.797969"}],"event":{"name":"2012 XXXVIII Conferencia Latinoamericana En Informatica (CLEI)","start":{"date-parts":[[2012,10,1]]},"location":"Medellin, Colombia","end":{"date-parts":[[2012,10,5]]}},"container-title":["2012 XXXVIII Conferencia Latinoamericana En Informatica (CLEI)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx5\/6418229\/6426913\/06427172.pdf?arnumber=6427172","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,6,21]],"date-time":"2017-06-21T07:13:42Z","timestamp":1498029222000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/6427172\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012,10]]},"references-count":28,"URL":"https:\/\/doi.org\/10.1109\/clei.2012.6427172","relation":{},"subject":[],"published":{"date-parts":[[2012,10]]}}}