{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,6]],"date-time":"2025-11-06T11:57:16Z","timestamp":1762430236060,"version":"3.28.0"},"reference-count":13,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2007,9]]},"DOI":"10.1109\/coase.2007.4341702","type":"proceedings-article","created":{"date-parts":[[2007,10,9]],"date-time":"2007-10-09T17:45:29Z","timestamp":1191951929000},"page":"484-488","source":"Crossref","is-referenced-by-count":2,"title":["Semiconductor system with multiple closed-loops constrains"],"prefix":"10.1109","author":[{"given":"Na","family":"Li","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"family":"Li Zheng","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Quan-Lin","family":"Li","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"journal-title":"An analytical method for evaluating the performance of closed loop production lines with unreliable machines and finite buffer","year":"2000","author":"maggio","key":"13"},{"year":"0","key":"11"},{"key":"12","doi-asserted-by":"publisher","DOI":"10.1080\/07408170208928849"},{"key":"3","doi-asserted-by":"publisher","DOI":"10.1016\/0167-6377(91)90075-Z"},{"key":"2","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4757-3345-7","author":"balsamo","year":"2001","journal-title":"Analysis of queuing networks with blocking"},{"key":"1","doi-asserted-by":"publisher","DOI":"10.1109\/32.4623"},{"key":"10","doi-asserted-by":"publisher","DOI":"10.1016\/S0007-8506(07)62854-6"},{"journal-title":"Performance evaluation of a two-loop closed system with three machines","year":"2006","author":"na","key":"7"},{"key":"6","doi-asserted-by":"publisher","DOI":"10.1016\/0967-0661(93)92114-J"},{"key":"5","first-page":"93","article-title":"Performance analysis and optimization of cyclic production lines","volume":"34","author":"han","year":"2002","journal-title":"HE Transactions"},{"key":"4","first-page":"545","article-title":"Modeling and analysis of closed-loop production lines with unreliable machines and finite buffers","volume":"28","author":"frein","year":"1996","journal-title":"HE Transactions"},{"key":"9","doi-asserted-by":"publisher","DOI":"10.1109\/32.24733"},{"journal-title":"Analysis of Multiple Loop Assembly\/Disassembly Networks","year":"2001","author":"levantesi","key":"8"}],"event":{"name":"2007 IEEE International Conference on Automation Science and Engineering","start":{"date-parts":[[2007,9,22]]},"location":"Scottsdale, AZ, USA","end":{"date-parts":[[2007,9,25]]}},"container-title":["2007 IEEE International Conference on Automation Science and Engineering"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx5\/4341639\/4341640\/04341702.pdf?arnumber=4341702","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,6,17]],"date-time":"2017-06-17T23:46:22Z","timestamp":1497743182000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/4341702\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2007,9]]},"references-count":13,"URL":"https:\/\/doi.org\/10.1109\/coase.2007.4341702","relation":{},"subject":[],"published":{"date-parts":[[2007,9]]}}}