{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,10,6]],"date-time":"2026-10-06T10:01:38Z","timestamp":1791280898777,"version":"4.1.0"},"reference-count":30,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2010,8]]},"DOI":"10.1109\/coase.2010.5584704","type":"proceedings-article","created":{"date-parts":[[2010,9,29]],"date-time":"2010-09-29T18:03:24Z","timestamp":1285783404000},"source":"Crossref","is-referenced-by-count":1,"title":["On gradient estimation of scheduling for multi-cluster tools with general robot moving times"],"prefix":"10.1109","author":[{"given":"W K V","family":"Chan","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"T M","family":"Roeder","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"263","reference":[{"key":"ref30","first-page":"67","article-title":"Meta-Modeling of a Cluster Simulator","author":"ruppert","year":"2000","journal-title":"Proceedings of the International Conference on Modeling and Analysis of Semiconductor Manufacturing (MASM)"},{"key":"ref10","author":"jevtic","year":"2001","journal-title":"Method and aparatus for managing scheduling a multiple cluster tool"},{"key":"ref11","author":"jevtic","year":"2001","journal-title":"Method and aparatus for scheduling wafer processing within a multiple chamber semiconductor wafer processing tool having a multiple blade robot"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1109\/TASE.2004.829430"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1109\/TSM.2006.879414"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1109\/TASE.2007.906678"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1109\/COASE.2007.4341844"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1109\/COASE.2008.4626439"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1109\/EPTC.2006.342794"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2000.899127"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1016\/0377-2217(91)90328-S"},{"key":"ref28","first-page":"1951","article-title":"Nonlinear Regression Fits for Simulated Cycle Time vs. Throughput Curves for Semiconductor Manufacturing","author":"johnson","year":"2004","journal-title":"Proceedings of the 2004 Winter Simulation Conference"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1109\/70.964658"},{"key":"ref27","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4615-4024-3"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1109\/TSM.2003.815203"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1023\/A:1018995317468"},{"key":"ref29","first-page":"78","article-title":"Resource-driven and Job-driven Simulations","author":"roeder","year":"2002","journal-title":"Proceedings of the 2002 International Conference on Modeling and Analysis of Semiconductor Manufacturing"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1007\/s00291-006-0040-9"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1287\/msom.4.4.296.5731"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1287\/opre.45.6.952"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1109\/66.641483"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1007\/s10951-005-2861-9"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1109\/66.311340"},{"key":"ref20","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2007.4419647"},{"key":"ref22","doi-asserted-by":"publisher","DOI":"10.1109\/TASE.2007.912716"},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-010-2592-8"},{"key":"ref24","doi-asserted-by":"publisher","DOI":"10.1287\/opre.1030.0073"},{"key":"ref23","article-title":"Optimal Scheduling of Multi-Cluster Tools with Constant Robot Moving Times, Part I: Two-Cluster Analysis","author":"chan","year":"2010","journal-title":"IEEE Transactions on Automation Science and Engineering"},{"key":"ref26","doi-asserted-by":"publisher","DOI":"10.1287\/opre.1080.0559"},{"key":"ref25","article-title":"Optimal Scheduling of MultiCluster Tools with Constant Robot Moving Times, Part II: Tree-Like Topology Configurations","author":"chan","year":"2010","journal-title":"IEEE Transactions on Automation Science and Engineering"}],"event":{"name":"2010 IEEE International Conference on Automation Science and Engineering (CASE 2010)","location":"Toronto, ON","start":{"date-parts":[[2010,8,21]]},"end":{"date-parts":[[2010,8,24]]}},"container-title":["2010 IEEE International Conference on Automation Science and Engineering"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx5\/5570123\/5583939\/05584704.pdf?arnumber=5584704","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,3,18]],"date-time":"2017-03-18T21:15:39Z","timestamp":1489871739000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/5584704\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2010,8]]},"references-count":30,"URL":"https:\/\/doi.org\/10.1109\/coase.2010.5584704","relation":{},"subject":[],"published":{"date-parts":[[2010,8]]}}}