{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,1]],"date-time":"2025-11-01T02:33:50Z","timestamp":1761964430981,"version":"3.28.0"},"reference-count":9,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2012,8]]},"DOI":"10.1109\/coase.2012.6386370","type":"proceedings-article","created":{"date-parts":[[2013,1,3]],"date-time":"2013-01-03T04:15:40Z","timestamp":1357186540000},"page":"407-412","source":"Crossref","is-referenced-by-count":2,"title":["Dispatching rule considering time-constraints on processes for semiconductor wafer fabrication facility"],"prefix":"10.1109","author":[{"given":"L.","family":"Li","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Y. F.","family":"Li","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Z. J.","family":"Sun","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"3","first-page":"285","article-title":"Innovations in time constraint management","author":"hsieh","year":"2002","journal-title":"International Symposium on Semiconductor Manufacturing"},{"key":"2","first-page":"880","article-title":"Capacity planning for semiconductor wafer fabrication with time constraints between operators","author":"giglio","year":"1999","journal-title":"Proc 1999 Winter Simulation Conf"},{"key":"1","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-008-1462-0"},{"key":"7","first-page":"295","article-title":"Scheduling and control for time-constrained processes in semiconductor manufacturing","author":"sun","year":"2005","journal-title":"Proc IEEE Int Symp Semiconductor Manufacturing"},{"key":"6","doi-asserted-by":"publisher","DOI":"10.1109\/SICE.2006.315820"},{"key":"5","doi-asserted-by":"publisher","DOI":"10.1109\/ISSM.1999.808738"},{"key":"4","doi-asserted-by":"publisher","DOI":"10.1080\/00207540802415568"},{"key":"9","first-page":"1644","article-title":"Heuristic based scheduling system for diffusion in semiconductor manufacturing","author":"tanju","year":"2009","journal-title":"Winter Simulation Conference Proceedings"},{"key":"8","doi-asserted-by":"crossref","first-page":"487","DOI":"10.1007\/s00291-006-0062-3","article-title":"A novel time tabling algorithm for a furnace process for semiconductor fabrication with constrained waiting and frequency-based setups","volume":"29","author":"chien","year":"2007","journal-title":"OR Spectrum"}],"event":{"name":"2012 IEEE International Conference on Automation Science and Engineering (CASE 2012)","start":{"date-parts":[[2012,8,20]]},"location":"Seoul, Korea (South)","end":{"date-parts":[[2012,8,24]]}},"container-title":["2012 IEEE International Conference on Automation Science and Engineering (CASE)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx5\/6375512\/6386304\/06386370.pdf?arnumber=6386370","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,6,21]],"date-time":"2017-06-21T05:05:59Z","timestamp":1498021559000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/6386370\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012,8]]},"references-count":9,"URL":"https:\/\/doi.org\/10.1109\/coase.2012.6386370","relation":{},"subject":[],"published":{"date-parts":[[2012,8]]}}}