{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,29]],"date-time":"2024-10-29T13:35:08Z","timestamp":1730208908793,"version":"3.28.0"},"reference-count":21,"publisher":"IEEE","license":[{"start":{"date-parts":[[2019,8,1]],"date-time":"2019-08-01T00:00:00Z","timestamp":1564617600000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/ieeexplore.ieee.org\/Xplorehelp\/downloads\/license-information\/IEEE.html"},{"start":{"date-parts":[[2019,8,1]],"date-time":"2019-08-01T00:00:00Z","timestamp":1564617600000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2019,8,1]],"date-time":"2019-08-01T00:00:00Z","timestamp":1564617600000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2019,8]]},"DOI":"10.1109\/coase.2019.8842864","type":"proceedings-article","created":{"date-parts":[[2019,9,20]],"date-time":"2019-09-20T00:08:11Z","timestamp":1568938091000},"page":"697-702","source":"Crossref","is-referenced-by-count":3,"title":["Multi-objective optimization for Work-In-Process balancing and throughput maximization in global fab scheduling"],"prefix":"10.1109","author":[{"given":"F.","family":"Barhebwa-Mushamuka","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"S.","family":"Dauzere-Peres","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"C.","family":"Yugma","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2007.4419801"},{"key":"ref11","first-page":"409","article-title":"Standard WIP determination and WIP balance control with time constraints in semiconductor wafer fabrication","volume":"15","author":"kuo","year":"2008","journal-title":"Journal of Quality"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1109\/TSM.2009.2017666"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1080\/09537280903466796"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2010.5678947"},{"key":"ref15","first-page":"1","article-title":"WIP control and calibration in a wafer fab","author":"zhou","year":"2012","journal-title":"Winter Simulation Conference Proceedings"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1007\/s10951-010-0222-9"},{"journal-title":"Production planning and control ofsemiconductor wafer fabrication facilities Modeling analysis and systems","year":"2012","author":"m\u00f6nch","key":"ref17"},{"key":"ref18","article-title":"The big book of simulation modeling: multi-method modeling with AnyLogic 6","author":"borshchev","year":"2013","journal-title":"AnyLogic North America"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2016.7822298"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.1999.823295"},{"key":"ref3","first-page":"145","volume":"9","author":"li","year":"1996","journal-title":"Minimum inventory variability schedule with applications in semiconductor fabrication"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-003-1653-7"},{"key":"ref5","article-title":"Nonlinear Multiobjective optimization","author":"miettinen","year":"1999","journal-title":"vol 12 of International Series in Operations Research and Management Science"},{"key":"ref8","volume":"491","author":"ehrgott","year":"2005","journal-title":"Multicriteria Optimization"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1109\/TSM.2003.815201"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1109\/66.136270"},{"key":"ref1","first-page":"296","article-title":"On a bicriterion formulation of the problems of integrated system identification and system optimization","volume":"1","author":"haimes","year":"1971","journal-title":"IEEE Transactions on Systems Man and Cybernetics"},{"journal-title":"Multicriteria Scheduling Theory Models and Algorithms","year":"2006","author":"t\u2019kindt","key":"ref9"},{"key":"ref20","doi-asserted-by":"publisher","DOI":"10.1016\/j.ifacol.2016.07.860"},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2017.1387679"}],"event":{"name":"2019 IEEE 15th International Conference on Automation Science and Engineering (CASE)","start":{"date-parts":[[2019,8,22]]},"location":"Vancouver, BC, Canada","end":{"date-parts":[[2019,8,26]]}},"container-title":["2019 IEEE 15th International Conference on Automation Science and Engineering (CASE)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/8827189\/8842826\/08842864.pdf?arnumber=8842864","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,7,17]],"date-time":"2022-07-17T21:51:28Z","timestamp":1658094688000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/8842864\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019,8]]},"references-count":21,"URL":"https:\/\/doi.org\/10.1109\/coase.2019.8842864","relation":{},"subject":[],"published":{"date-parts":[[2019,8]]}}}