{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,22]],"date-time":"2024-10-22T20:23:36Z","timestamp":1729628616715,"version":"3.28.0"},"reference-count":29,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2014,11]]},"DOI":"10.1109\/codit.2014.6996901","type":"proceedings-article","created":{"date-parts":[[2014,12,31]],"date-time":"2014-12-31T04:14:48Z","timestamp":1419999288000},"page":"246-250","source":"Crossref","is-referenced-by-count":1,"title":["A case study of a two-stage flow shop with dedicated machines and a single robot"],"prefix":"10.1109","author":[{"given":"Nacira","family":"Chikhi","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Rachid","family":"Benmansour","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Abdelghani","family":"Bekrar","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Said","family":"Hanafi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Moncef","family":"Abbas","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"19","doi-asserted-by":"publisher","DOI":"10.1016\/S0925-5273(03)00011-2"},{"key":"17","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(96)00213-5"},{"key":"18","doi-asserted-by":"publisher","DOI":"10.1016\/j.omega.2005.04.004"},{"key":"15","doi-asserted-by":"publisher","DOI":"10.1002\/nav.3800010110"},{"key":"16","doi-asserted-by":"publisher","DOI":"10.1002\/1099-1425(200101\/02)4:1<3::AID-JOS57>3.0.CO;2-D"},{"key":"13","doi-asserted-by":"publisher","DOI":"10.1016\/S0166-218X(00)00316-4"},{"key":"14","doi-asserted-by":"publisher","DOI":"10.1016\/S0305-0548(03)00164-3"},{"key":"11","doi-asserted-by":"crossref","first-page":"421","DOI":"10.1051\/ro\/2009024","article-title":"M\ufffdthode heuristique pour le probl\ufffdme de flow shop hybride avec machines d\ufffdd\ufffdees","volume":"43","author":"dridi","year":"2001","journal-title":"RAIRO Operations Research"},{"key":"12","doi-asserted-by":"publisher","DOI":"10.1057\/jors.1988.63"},{"key":"21","doi-asserted-by":"crossref","first-page":"219","DOI":"10.15807\/jorsj.25.219","article-title":"On n-job, 2-machine flow-shop scheduling problem with arbitrary time lags and transportation times of jobs","volume":"25","author":"maggu","year":"1982","journal-title":"Journal of the Operations Research Society of Japan"},{"key":"20","doi-asserted-by":"crossref","first-page":"136","DOI":"10.15807\/jorsj.24.136","article-title":"On equivalent job-for-job block in 2 n sequencing problem with transportation times","volume":"24","author":"maggu","year":"1981","journal-title":"Journal of the Operations Research Society of Japan"},{"key":"22","doi-asserted-by":"publisher","DOI":"10.2307\/2583646"},{"key":"23","doi-asserted-by":"publisher","DOI":"10.1080\/00207540210159536"},{"key":"24","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2009.09.024"},{"key":"25","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(99)00447-6"},{"key":"26","doi-asserted-by":"publisher","DOI":"10.1016\/S0925-5273(96)00125-9"},{"key":"27","doi-asserted-by":"publisher","DOI":"10.1016\/j.apm.2007.09.028"},{"key":"28","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(99)00041-7"},{"key":"29","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2010.10.009"},{"key":"3","doi-asserted-by":"publisher","DOI":"10.1016\/j.dam.2008.03.021"},{"key":"2","article-title":"A Two-stage flow shop problem with parallel dedicated machines","author":"besbes","year":"2010","journal-title":"Mosim'10 May 10-12-Hammamet-Tunisia"},{"key":"10","doi-asserted-by":"publisher","DOI":"10.1023\/A:1018995317468"},{"key":"1","doi-asserted-by":"crossref","first-page":"695","DOI":"10.1016\/S0305-0548(98)00080-X","article-title":"The strong NP-hardness of two-stage flowshop scheduling with a common second-stage machine","volume":"26","author":"bertrand","year":"1999","journal-title":"Computers and Operations Research"},{"key":"7","article-title":"Transfer batch scheduling for a robotic cell with an optimization-based algorithms","author":"chikhi","year":"2013","journal-title":"ROADEF'14"},{"key":"6","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2011.07.008"},{"key":"5","doi-asserted-by":"crossref","first-page":"1169","DOI":"10.1016\/S0305-0548(97)00023-3","article-title":"Two-stage Flowshop Scheduling with a Common Second-stage Machine","volume":"24","author":"ceyda","year":"1997","journal-title":"Computers and Operations Research"},{"key":"4","doi-asserted-by":"publisher","DOI":"10.1080\/00207540310001631584"},{"key":"9","doi-asserted-by":"publisher","DOI":"10.1002\/(SICI)1099-1425(199901\/02)2:1<35::AID-JOS15>3.0.CO;2-J"},{"key":"8","doi-asserted-by":"publisher","DOI":"10.1007\/s10951-006-8501-1"}],"event":{"name":"2014 International Conference on Control, Decision and Information Technologies (CoDIT)","start":{"date-parts":[[2014,11,3]]},"location":"Metz, France","end":{"date-parts":[[2014,11,5]]}},"container-title":["2014 International Conference on Control, Decision and Information Technologies (CoDIT)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6982036\/6996851\/06996901.pdf?arnumber=6996901","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,8,19]],"date-time":"2019-08-19T03:38:11Z","timestamp":1566185891000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/6996901\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,11]]},"references-count":29,"URL":"https:\/\/doi.org\/10.1109\/codit.2014.6996901","relation":{},"subject":[],"published":{"date-parts":[[2014,11]]}}}