{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,29]],"date-time":"2024-10-29T14:08:06Z","timestamp":1730210886720,"version":"3.28.0"},"reference-count":16,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2015,5]]},"DOI":"10.1109\/cscwd.2015.7231021","type":"proceedings-article","created":{"date-parts":[[2015,9,3]],"date-time":"2015-09-03T17:52:51Z","timestamp":1441302771000},"page":"570-575","source":"Crossref","is-referenced-by-count":0,"title":["Parallel computing method for complex emergency systems based on multi-objective decision-making with analytic hierarchy process"],"prefix":"10.1109","author":[{"given":"Quanquan","family":"Zhang","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Wenan","family":"Tan","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yong","family":"Sun","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref10","first-page":"51","article-title":"Research of Multi-emergency Depots Model for Resource Scheduling Based on Priority","volume":"7","author":"zhou","year":"2011","journal-title":"On Economic Problems"},{"key":"ref11","first-page":"3","article-title":"Resource Scheduling Problem in Emergency Systems with Unknown Emergency Time","volume":"5","author":"zhou","year":"2011","journal-title":"Technoeconomics & Management Research"},{"key":"ref12","first-page":"488","article-title":"Multi-Resource Emergency Scheduling Model and Algorithm in Disaster Chain","volume":"31","author":"li","year":"2011","journal-title":"Systems Engineering-theory & Practice"},{"key":"ref13","first-page":"1298","article-title":"Modeling and Analyzing of Simulation in Emergency Resource Scheduling","volume":"24","author":"zeng","year":"2012","journal-title":"Journal of System Simulation"},{"journal-title":"The Analytic Hierarchy Process Planning Priority Setting Resource Allocation","year":"1980","author":"saaty","key":"ref14"},{"journal-title":"An Introduction to Management Science Quantitative Approaches to Decision Making","year":"2013","author":"anderson","key":"ref15"},{"journal-title":"An Introduction to Parallel Programming","year":"2011","author":"pacheco","key":"ref16"},{"key":"ref4","first-page":"113","article-title":"Scheduling Problem in Multi-Resource Emergency Systems Based on the Connection Number","volume":"6","author":"gao","year":"2003","journal-title":"Systems Engineering-theory & Practice"},{"key":"ref3","first-page":"510","article-title":"Research on Multi-Resource Dispatch in Emergency System","volume":"32","author":"wang","year":"2002","journal-title":"Journal of Southeast University (Natural Science Edition)"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1023\/B:ANOR.0000030690.27939.39"},{"key":"ref5","first-page":"318","article-title":"Fuzzy Programming Problem for Vehicle Dispatch under Time Restriction","volume":"16","author":"he","year":"2001","journal-title":"Control and Decision"},{"key":"ref8","first-page":"52","article-title":"The Study of Combinatorial Scheduling Problem in Emergency Systems","volume":"20","author":"dai","year":"2000","journal-title":"Systems Engineering-theory & Practice"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1109\/17.669762"},{"key":"ref2","first-page":"181","article-title":"Parallel Computation Method for Complex Emergency Systems Based on Multiple Objective Optimal Allocation of Resources","volume":"31","author":"tan","year":"2011","journal-title":"Systems Engineering-theory & Practice"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1109\/TEM.1998.669742"},{"key":"ref9","first-page":"12","article-title":"The Fire Fighting Resources in the Layout Model Based on Multi-Stage Process","volume":"23","author":"jia","year":"2005","journal-title":"Systems Engineering"}],"event":{"name":"2015 IEEE 19th International Conference on Computer Supported Cooperative Work in Design (CSCWD)","start":{"date-parts":[[2015,5,6]]},"location":"Calabria, Italy","end":{"date-parts":[[2015,5,8]]}},"container-title":["2015 IEEE 19th International Conference on Computer Supported Cooperative Work in Design (CSCWD)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/7194213\/7230917\/07231021.pdf?arnumber=7231021","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,3,25]],"date-time":"2017-03-25T00:33:52Z","timestamp":1490402032000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/7231021\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,5]]},"references-count":16,"URL":"https:\/\/doi.org\/10.1109\/cscwd.2015.7231021","relation":{},"subject":[],"published":{"date-parts":[[2015,5]]}}}