{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,23]],"date-time":"2024-10-23T07:20:47Z","timestamp":1729668047830,"version":"3.28.0"},"reference-count":22,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2018,5]]},"DOI":"10.1109\/cscwd.2018.8465274","type":"proceedings-article","created":{"date-parts":[[2018,9,17]],"date-time":"2018-09-17T18:04:03Z","timestamp":1537207443000},"page":"677-682","source":"Crossref","is-referenced-by-count":2,"title":["A BIM Integrated Hospital Emergency Management Framework"],"prefix":"10.1109","author":[{"given":"Yue","family":"Guo","sequence":"first","affiliation":[]},{"given":"Yubin","family":"Zhang","sequence":"additional","affiliation":[]},{"given":"Yihua","family":"Zhao","sequence":"additional","affiliation":[]},{"given":"Qiong","family":"Jia","sequence":"additional","affiliation":[]},{"given":"Qian","family":"Li","sequence":"additional","affiliation":[]},{"given":"Zhe","family":"Jing","sequence":"additional","affiliation":[]},{"given":"Yifei","family":"Ren","sequence":"additional","affiliation":[]},{"given":"Rong","family":"Li","sequence":"additional","affiliation":[]}],"member":"263","reference":[{"doi-asserted-by":"publisher","key":"ref10","DOI":"10.1016\/j.autcon.2013.10.023"},{"doi-asserted-by":"publisher","key":"ref11","DOI":"10.1016\/j.aei.2010.06.003"},{"key":"ref12","doi-asserted-by":"crossref","first-page":"15","DOI":"10.5130\/AJCEB.v12i4.3032","article-title":"Building information modelling (BIM): now and beyond","volume":"12","author":"salman","year":"2015","journal-title":"Construction Economics and Building"},{"key":"ref13","article-title":"Research on allocation of the emergency evacuation in and around the major shopping malls","volume":"32","author":"wu","year":"2016","journal-title":"Journal of Fujian Normal University (Nature Science Edition)"},{"key":"ref14","volume":"40","author":"li","year":"2011","journal-title":"Based on space-time congestion concept"},{"doi-asserted-by":"publisher","key":"ref15","DOI":"10.1016\/j.ijinfomgt.2010.10.001"},{"doi-asserted-by":"publisher","key":"ref16","DOI":"10.1097\/DMP.0b013e31819ef060"},{"key":"ref17","article-title":"Smart-BIM virtual prototype implementation","volume":"39","author":"heidari","year":"2014","journal-title":"Smart-BIM virtual prototype implementation"},{"doi-asserted-by":"publisher","key":"ref18","DOI":"10.1061\/(ASCE)CP.1943-5487.0000522"},{"doi-asserted-by":"publisher","key":"ref19","DOI":"10.1016\/S1007-0214(08)70175-5"},{"doi-asserted-by":"publisher","key":"ref4","DOI":"10.1016\/j.ssci.2016.06.014"},{"key":"ref3","article-title":"Optimal design method of emergency evacuation signs at open public places","volume":"24","author":"zhao","year":"2015","journal-title":"Fire Safety Science"},{"doi-asserted-by":"publisher","key":"ref6","DOI":"10.1061\/(ASCE)LM.1943-5630.0000127"},{"year":"2013","journal-title":"The Royal Institute of Charted Surveyors","article-title":"RICS 2011 Building Information Modelling survey report","key":"ref5"},{"doi-asserted-by":"publisher","key":"ref8","DOI":"10.1061\/(ASCE)CO.1943-7862.0000433"},{"doi-asserted-by":"publisher","key":"ref7","DOI":"10.1016\/j.ijproman.2012.12.001"},{"key":"ref2","article-title":"Introduction to emergency management","author":"haddow","year":"2017","journal-title":"Butterworth-Heinemapp"},{"doi-asserted-by":"publisher","key":"ref1","DOI":"10.2307\/3134992"},{"key":"ref9","article-title":"BIM based virtual environment for fire emergency evacuation","author":"wang","year":"2014","journal-title":"WorId Scientific"},{"year":"2015","author":"fan","journal-title":"Study on safety management of constructing for high-rise building based on the technology of BIM","key":"ref20"},{"key":"ref22","first-page":"9","volume":"201710012102","author":"cui","year":"2017","journal-title":"Fire control real-time monitoring system based on BIM"},{"key":"ref21","first-page":"46","article-title":"Bim model renewal based on thermal imaging technology and real-time control for construction safety","volume":"12","author":"gan","year":"2017","journal-title":"Building Construction"}],"event":{"name":"2018 IEEE 22nd International Conference on Computer Supported Cooperative Work in Design (CSCWD)","start":{"date-parts":[[2018,5,9]]},"location":"Nanjing, China","end":{"date-parts":[[2018,5,11]]}},"container-title":["2018 IEEE 22nd International Conference on Computer Supported Cooperative Work in Design ((CSCWD))"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/8455506\/8464758\/08465274.pdf?arnumber=8465274","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,10,24]],"date-time":"2019-10-24T05:33:09Z","timestamp":1571895189000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/8465274\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,5]]},"references-count":22,"URL":"https:\/\/doi.org\/10.1109\/cscwd.2018.8465274","relation":{},"subject":[],"published":{"date-parts":[[2018,5]]}}}