{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,1,16]],"date-time":"2025-01-16T05:36:11Z","timestamp":1737005771399,"version":"3.33.0"},"reference-count":12,"publisher":"IEEE","license":[{"start":{"date-parts":[[2024,10,18]],"date-time":"2024-10-18T00:00:00Z","timestamp":1729209600000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2024,10,18]],"date-time":"2024-10-18T00:00:00Z","timestamp":1729209600000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2024,10,18]]},"DOI":"10.1109\/dtpi61353.2024.10778898","type":"proceedings-article","created":{"date-parts":[[2024,12,12]],"date-time":"2024-12-12T19:06:15Z","timestamp":1734030375000},"page":"15-22","source":"Crossref","is-referenced-by-count":0,"title":["Day-Ahead Optimization Scheduling of Hybrid AC\/DC Distribution Networks Considering Uncertainties"],"prefix":"10.1109","author":[{"given":"Yuxin","family":"Shi","sequence":"first","affiliation":[{"name":"China Nuclear Power Planning and Design Institute Co.LTD.,Beijing,China"}]},{"given":"Yunwei","family":"Li","sequence":"additional","affiliation":[{"name":"China Nuclear Power Planning and Design Institute Co.LTD.,Beijing,China"}]},{"given":"Ye","family":"Zhang","sequence":"additional","affiliation":[{"name":"Inner Mongolia Huomihongjun Aluminum Electric Co.LTD.,Tongliao,China"}]},{"given":"Yu","family":"Gao","sequence":"additional","affiliation":[{"name":"China Nuclear Power Planning and Design Institute Co.LTD.,Beijing,China"}]},{"given":"Qiuyao","family":"Zhang","sequence":"additional","affiliation":[{"name":"Inner Mongolia Huomihongjun Aluminum Electric Co.LTD.,Tongliao,China"}]},{"given":"Zaibao","family":"Xiong","sequence":"additional","affiliation":[{"name":"China Nuclear Power Planning and Design Institute Co.LTD.,Beijing,China"}]}],"member":"263","reference":[{"issue":"04","key":"ref1","first-page":"43","article-title":"Transformation of Global Energy Governance [J]","volume":"221","year":"2017","journal-title":"Macroeconomic Research"},{"issue":"24","key":"ref2","first-page":"10","article-title":"Research and Prospects on Low-Carbon Intelligent Distribution Network Planning [J]","volume":"45","author":"Peng","year":"2021","journal-title":"Automation of Electric Power Systems"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1109\/tpwrs.2019.2916227"},{"issue":"08","key":"ref4","first-page":"27","article-title":"Operational Modes and Coordinated Control Methods for Hybrid AC\/DC Distribution Networks [J]","volume":"33","author":"Xue","year":"2016","journal-title":"Power Supply"},{"key":"ref5","article-title":"A Decentralized Optimal Operation of AC\/DC Hybrid Distribution Grids[J]","author":"C","year":"2018","journal-title":"Smart Grid, IEEE Transactions on"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2011.2177867"},{"issue":"05","key":"ref7","first-page":"33","article-title":"Fuzzy Multi-objective Reactive Power Optimization Configuration in Distributed Generation Networks [J]","volume":"46","author":"Chao","year":"2018","journal-title":"Smart Power"},{"issue":"10","key":"ref8","first-page":"80","article-title":"Intermittent Distributed Generation Comprehensive Optimization Configuration Considering Reactive Power Compensation Factors [J]","volume-title":"Proceedings of the CSEE","volume":"32","author":"Wei"},{"issue":"06","key":"ref9","first-page":"216","article-title":"Optimization Configuration of Intermittent Distributed Generations in Distribution Networks Based on Complementarity [J]","volume":"28","author":"Wei","year":"2013","journal-title":"Transactions of China Electrotechnical Society"},{"issue":"18","key":"ref10","first-page":"11","article-title":"Optimal Siting and Sizing of Distributed Generations Considering Grid-Accessible Electric Vehicles [J]","volume":"35","author":"Zhipeng","year":"2011","journal-title":"Automation of Electric Power Systems"},{"issue":"13","key":"ref11","first-page":"36","article-title":"Study on Fuzzy Opportunity Constrained Unit Commitment with Large-Scale Intermittent Power Sources [J]","volume-title":"Proceedings of the CSEE","volume":"33","author":"Hu"},{"issue":"05","key":"ref12","first-page":"106","article-title":"Optimal Capacity Configuration of Energy Storage Considering Dual-Time-Scale Dispatch Cycles [J]","volume":"46","author":"Yayi","year":"2018","journal-title":"Power System Protection and Control"}],"event":{"name":"2024 IEEE 4th International Conference on Digital Twins and Parallel Intelligence (DTPI)","start":{"date-parts":[[2024,10,18]]},"location":"Wuhan, China","end":{"date-parts":[[2024,10,20]]}},"container-title":["2024 IEEE 4th International Conference on Digital Twins and Parallel Intelligence (DTPI)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx8\/10778636\/10778638\/10778898.pdf?arnumber=10778898","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,1,15]],"date-time":"2025-01-15T19:26:26Z","timestamp":1736969186000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/10778898\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024,10,18]]},"references-count":12,"URL":"https:\/\/doi.org\/10.1109\/dtpi61353.2024.10778898","relation":{},"subject":[],"published":{"date-parts":[[2024,10,18]]}}}