{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,4]],"date-time":"2024-09-04T08:30:34Z","timestamp":1725438634417},"reference-count":8,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2015,5]]},"DOI":"10.1109\/eit.2015.7293335","type":"proceedings-article","created":{"date-parts":[[2015,10,8]],"date-time":"2015-10-08T17:58:16Z","timestamp":1444327096000},"page":"158-164","source":"Crossref","is-referenced-by-count":1,"title":["Synchrophasor technology: Applications and benefits over conventional measurement"],"prefix":"10.1109","author":[{"given":"Andrew M.","family":"Berg","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Hossein","family":"Salehfar","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Arash","family":"Nejadpak","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref4","article-title":"Manitoba Hydro, Manitoba Hydro's Experience with Synchrophasor Implementation","author":"hadidi","year":"2011","journal-title":"IEEE Canada Electrical Power and Energy Conference"},{"key":"ref3","first-page":"3","article-title":"Oak Ridge National Laboratory, Frequency Control Concerns in the North American Electric Power System","author":"kirby","year":"0","journal-title":"US Department of Energy December 2002"},{"key":"ref6","article-title":"Schweitzer Engineering Laboratories, Inc","author":"moxley","year":"0","journal-title":"Turning Synchrophasor Data Into Actionable Information"},{"key":"ref5","article-title":"ERLPhase Power Technologies Ltd., Wide Area Monitoring Systems (WAMS) using Phasor Measurement Units (PMU)","author":"narendra","year":"2011","journal-title":"IEEE Canada Electrical Power and Energy Conference"},{"journal-title":"Remote Terminal Unit (RTU) Specifications","article-title":"State Load Dispatch Centre","year":"0","key":"ref8"},{"journal-title":"Synchrophasors and their Applications SEL_Synchrophasors pdf> [Provided by Schweitzer Engineering Laboratories Staff]","article-title":"Schweitzer Engineering Laboratories, Inc","year":"0","key":"ref7"},{"key":"ref2","article-title":"University of Manitoba, Wide Area Monitoring, Control and Protection Applications Using Synchrophasors","author":"rajapakse","year":"2011","journal-title":"IEEE Canada Electrical Power and Energy Conference"},{"key":"ref1","first-page":"1?6","article-title":"Power System State Estimation: Theory and Implementation","author":"abur","year":"2004","journal-title":"Marcel Dekker Inc"}],"event":{"name":"2015 IEEE International Conference on Electro\/Information Technology (EIT)","start":{"date-parts":[[2015,5,21]]},"location":"Dekalb, IL, USA","end":{"date-parts":[[2015,5,23]]}},"container-title":["2015 IEEE International Conference on Electro\/Information Technology (EIT)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/7274378\/7293314\/07293335.pdf?arnumber=7293335","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,3,24]],"date-time":"2017-03-24T18:00:33Z","timestamp":1490378433000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/7293335\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,5]]},"references-count":8,"URL":"https:\/\/doi.org\/10.1109\/eit.2015.7293335","relation":{},"subject":[],"published":{"date-parts":[[2015,5]]}}}