{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,10,2]],"date-time":"2026-10-02T02:24:16Z","timestamp":1790907856648,"version":"4.1.0"},"reference-count":22,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2009,9]]},"DOI":"10.1109\/etfa.2009.5347066","type":"proceedings-article","created":{"date-parts":[[2009,12,10]],"date-time":"2009-12-10T14:44:11Z","timestamp":1260456251000},"page":"1-7","source":"Crossref","is-referenced-by-count":7,"title":["Application of EM algorithm to hybrid flow shop scheduling problems with a special blocking"],"prefix":"10.1109","author":[{"given":"Kun","family":"Yuan","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Nathalie","family":"Sauer","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Christophe","family":"Sauvey","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"263","reference":[{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2005.06.017"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1080\/09511920600678827"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1016\/S0360-8352(99)00023-6"},{"key":"ref13","first-page":"643","article-title":"Scheduling Problem of Job-Shop with Blocking: A Taboo Search Approach","author":"mati","year":"2001","journal-title":"Proc 4th Metaheuristics Int Conf (MIC)"},{"key":"ref14","article-title":"Heuristic algorithms for a two-stage hybrid flowshop with a new blocking constraint","author":"martinez","year":"2004","journal-title":"PMS"},{"key":"ref15","author":"martinez","year":"2005","journal-title":"Ordonnancement de syst&#x00E8;mes de production avec contraintes de blocage"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2004.08.046"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1016\/0377-2217(93)E0326-S"},{"key":"ref18","article-title":"Initial populations tests for genetic algorithm flowshop scheduling problems solving with a special blocking","author":"sauvey","year":"2009","journal-title":"INCOM"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1016\/S0895-7177(00)00110-2"},{"key":"ref4","doi-asserted-by":"crossref","first-page":"638","DOI":"10.1016\/j.ejor.2004.08.020","article-title":"A hybrid scatter search\/electromagnetism meta-heuristic for project scheduling","volume":"169","author":"dieter","year":"2006","journal-title":"EJOR"},{"key":"ref3","doi-asserted-by":"crossref","first-page":"323","DOI":"10.1007\/s10951-005-1640-y","article-title":"A genetic algorithm for hybrid flow-shop scheduling with multiprocessor tasks","volume":"8","author":"ceyda","year":"2005","journal-title":"Journal of Scheduling"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1080\/00207549608904972"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1016\/j.future.2004.03.014"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2005.02.001"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1023\/A:1018976827443"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1023\/A:1022452626305"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2004.09.034"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1287\/opre.44.3.510"},{"key":"ref20","doi-asserted-by":"publisher","DOI":"10.1080\/10170660409509387"},{"key":"ref22","article-title":"Application of EM algorithm to flowshop scheduling problems with a special blocking","author":"yuan","year":"2007","journal-title":"ISEM&#x2019;07"},{"key":"ref21","doi-asserted-by":"crossref","first-page":"1943","DOI":"10.3923\/jas.2009.1943.1949","article-title":"A Novel Simulated Annealing Algorithm to Hybrid Flow Shops Scheduling with Sequence-Dependent Setup Times","volume":"9","author":"tabriz","year":"2009","journal-title":"Journal of Applied Sciences"}],"event":{"name":"Factory Automation (ETFA 2009)","location":"Palma de Mallorca, Spain","start":{"date-parts":[[2009,9,22]]},"end":{"date-parts":[[2009,9,25]]}},"container-title":["2009 IEEE Conference on Emerging Technologies &amp; Factory Automation"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx5\/5340902\/5346987\/05347066.pdf?arnumber=5347066","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,6,18]],"date-time":"2017-06-18T22:41:23Z","timestamp":1497825683000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/5347066\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2009,9]]},"references-count":22,"URL":"https:\/\/doi.org\/10.1109\/etfa.2009.5347066","relation":{},"subject":[],"published":{"date-parts":[[2009,9]]}}}