{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,23]],"date-time":"2024-10-23T06:38:20Z","timestamp":1729665500072,"version":"3.28.0"},"reference-count":27,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2011,9]]},"DOI":"10.1109\/etfa.2011.6059036","type":"proceedings-article","created":{"date-parts":[[2011,10,24]],"date-time":"2011-10-24T20:30:25Z","timestamp":1319488225000},"page":"1-8","source":"Crossref","is-referenced-by-count":6,"title":["Requirements for the benchmarking of decentralized manufacturing control systems"],"prefix":"10.1109","author":[{"given":"Sebastian","family":"Schreiber","sequence":"first","affiliation":[]},{"given":"Alexander","family":"Fay","sequence":"additional","affiliation":[]}],"member":"263","reference":[{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1016\/j.compind.2007.05.004"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1016\/0278-6125(86)90036-1"},{"key":"ref12","first-page":"246","article-title":"Evaluation a Holonic Packing Cell","volume":"2744","author":"fletcher","year":"2003","journal-title":"1st International Conference on Industrial Applications of Holonic and Multi-Agent Systems (HoloMAS)"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1016\/S0952-1976(03)00075-7"},{"article-title":"An Agile and Adaptive Holonic Architecture for Manufacturing Control","year":"2004","author":"leit\u00e3o","key":"ref14"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1016\/j.engappai.2008.09.005"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1109\/TSMCC.2008.923881"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1109\/ISIE.2010.5637342"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.1997.640967"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1145\/1323688.1323698"},{"article-title":"Integration of scheduling and control in holonic manufacturing systems","year":"1998","author":"bongaerts","key":"ref4"},{"key":"ref27","doi-asserted-by":"publisher","DOI":"10.1007\/3-540-32062-8_7"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1109\/IECON.2010.5675113"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1016\/S0166-3615(01)00108-7"},{"key":"ref5","first-page":"90","article-title":"Evaluating the relative performance of alternative controlarchitectures for manufacturing","author":"brennan","year":"0","journal-title":"IEEE International Symposium on Intelligent Control (ISIC)"},{"key":"ref8","first-page":"225","article-title":"A benchmark framework for manufacturing control","author":"cavalieri","year":"1999","journal-title":"2nd International Workshop on Intelligent Manufacturing Systems"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1016\/S0166-3615(03)00038-1"},{"key":"ref2","volume":"1","author":"badr","year":"2011","journal-title":"Agent-Based Dynamic Scheduling for Flexible Manufacturing Systems"},{"key":"ref9","first-page":"133","article-title":"An experimental benchmarking of two multi-agent systems for production scheduling and control","author":"cavalieri","year":"1998","journal-title":"International Workshop on Intelligent Manufacturing Systems (IMS-EUROPE)"},{"journal-title":"ARGESIM Benchmark C2 Flexible Assembly System","year":"0","key":"ref1"},{"key":"ref20","doi-asserted-by":"crossref","first-page":"38","DOI":"10.11128\/sne.20.bn02.09968","article-title":"Event-based and State-Automata-based Modelling of FMS: A Comparative Case Study of Flexsim, Dymola and Matlab\/Stateflow based on the ARGESIM Benchmark C2","volume":"20","author":"schreiber","year":"2010","journal-title":"Simulation News Europe"},{"key":"ref22","first-page":"193","article-title":"Development of a Reference Architecture for Benchmarking Service of Manufacturing Systems","author":"terzi","year":"2003","journal-title":"7th IFAC workshop on Intelligent manufacturing systems (IMS)"},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.1109\/ETFA.2011.6059036"},{"key":"ref24","doi-asserted-by":"publisher","DOI":"10.1109\/ETFA.2003.1247718"},{"key":"ref23","doi-asserted-by":"publisher","DOI":"10.1007\/s10845-006-0036-y"},{"key":"ref26","doi-asserted-by":"publisher","DOI":"10.1007\/BF00186472"},{"key":"ref25","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2010.518746"}],"event":{"name":"Factory Automation (ETFA 2011)","start":{"date-parts":[[2011,9,5]]},"location":"Toulouse, France","end":{"date-parts":[[2011,9,9]]}},"container-title":["ETFA2011"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx5\/6045288\/6058966\/06059036.pdf?arnumber=6059036","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,18]],"date-time":"2019-06-18T14:17:18Z","timestamp":1560867438000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/6059036\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2011,9]]},"references-count":27,"URL":"https:\/\/doi.org\/10.1109\/etfa.2011.6059036","relation":{},"subject":[],"published":{"date-parts":[[2011,9]]}}}