{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,29]],"date-time":"2024-10-29T16:54:11Z","timestamp":1730220851155,"version":"3.28.0"},"reference-count":19,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2018,9]]},"DOI":"10.1109\/etfa.2018.8502606","type":"proceedings-article","created":{"date-parts":[[2018,11,15]],"date-time":"2018-11-15T22:20:08Z","timestamp":1542320408000},"page":"472-479","source":"Crossref","is-referenced-by-count":2,"title":["Large-Scale Scheduling with Routing, Batching and Release Dates for Wafer Fabs using Tabu Search"],"prefix":"10.1109","author":[{"given":"Clemens","family":"Schwenke","sequence":"first","affiliation":[]},{"given":"Henri","family":"Blankenstein","sequence":"additional","affiliation":[]},{"given":"Klaus","family":"Kabitzsch","sequence":"additional","affiliation":[]}],"member":"263","reference":[{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2009.5429173"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1007\/s10951-006-0325-5"},{"journal-title":"Job shop scheduling with consideration of due dates Potentials of local search based solution techniques","year":"2015","author":"kuhpfahl","key":"ref12"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2015.11.004"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1007\/s11227-017-2041-7"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1007\/0-306-48126-X_4"},{"key":"ref16","article-title":"Les problemes d'ordonnancement avec contraintes disjonctives","volume":"9","author":"roy","year":"1964","journal-title":"Note ds"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2011.639099"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1023\/B:JIMS.0000010078.30713.e9"},{"key":"ref19","doi-asserted-by":"crossref","first-page":"683","DOI":"10.1007\/s00170-010-2743-y","article-title":"A hybrid tabu search algorithm with an efficient neighborhood structure for the flexible job shop scheduling problem","volume":"52","author":"li","year":"2011","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.42.6.797"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4615-6329-7"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2014.10.008"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1007\/BF02023073"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2011.6147907"},{"key":"ref7","article-title":"Measurement and Improvement of Manufacturing Capacities (MIMAC): Final report","author":"fowler","year":"1995","journal-title":"Technical Report 9506286lA-TR"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1002\/jos.102"},{"key":"ref1","volume":"52","author":"m6nch","year":"2012","journal-title":"Production Planning and Control for Semiconductor Wafer Fabrication Facilities Modeling Analysis and Systems"},{"key":"ref9","doi-asserted-by":"crossref","first-page":"583","DOI":"10.1007\/s10951-010-0222-9","article-title":"A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations","volume":"14","author":"m6nch","year":"2011","journal-title":"Journal of Scheduling"}],"event":{"name":"2018 IEEE 23rd International Conference on Emerging Technologies and Factory Automation (ETFA)","start":{"date-parts":[[2018,9,4]]},"location":"Turin","end":{"date-parts":[[2018,9,7]]}},"container-title":["2018 IEEE 23rd International Conference on Emerging Technologies and Factory Automation (ETFA)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/8488382\/8502441\/08502606.pdf?arnumber=8502606","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,8,23]],"date-time":"2020-08-23T19:24:28Z","timestamp":1598210668000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/8502606\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,9]]},"references-count":19,"URL":"https:\/\/doi.org\/10.1109\/etfa.2018.8502606","relation":{},"subject":[],"published":{"date-parts":[[2018,9]]}}}