{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,12,19]],"date-time":"2025-12-19T15:21:31Z","timestamp":1766157691165},"reference-count":30,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2013,7]]},"DOI":"10.1109\/eurocon.2013.6625092","type":"proceedings-article","created":{"date-parts":[[2013,10,17]],"date-time":"2013-10-17T21:48:16Z","timestamp":1382046496000},"page":"918-925","source":"Crossref","is-referenced-by-count":29,"title":["SITL and HLA co-simulation platforms: Tools for analysis of the integrated ICT and electric power system"],"prefix":"10.1109","author":[{"given":"Riccardo","family":"Bottura","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Davood","family":"Babazadeh","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Kun","family":"Zhu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Alberto","family":"Borghetti","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Lars","family":"Nordstrom","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Carlo Alberto","family":"Nucci","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"journal-title":"Modeling and Simulation High Level Architecture","year":"2010","key":"19"},{"year":"0","key":"17"},{"year":"0","key":"18"},{"key":"15","doi-asserted-by":"publisher","DOI":"10.1109\/JPROC.2011.2116110"},{"journal-title":"OPAL-RT EMEGAsim","year":"0","key":"16"},{"key":"13","doi-asserted-by":"publisher","DOI":"10.1109\/MPE.2011.943205"},{"key":"14","doi-asserted-by":"publisher","DOI":"10.1109\/PESGM.2012.6344839"},{"key":"11","doi-asserted-by":"publisher","DOI":"10.1109\/ICCES.2011.6140989"},{"key":"12","doi-asserted-by":"publisher","DOI":"10.1016\/j.comcom.2012.01.003"},{"journal-title":"IEEE Standard for Synchrophasors for Power System","year":"0","key":"21"},{"key":"20","article-title":"Virtualization of synchronized phasor measurement units within real-time simulators for smart grid applications","author":"al-hammouri","year":"2012","journal-title":"Proc of IEEE PES General Meeting"},{"journal-title":"System-In-The-Loop (SITL) Module","year":"0","key":"22"},{"journal-title":"OpenPDC The Open Source Phasor Data Concentrator","year":"0","key":"23"},{"key":"24","doi-asserted-by":"publisher","DOI":"10.1109\/PES.2011.6039672"},{"journal-title":"The TVA Code Library","year":"0","key":"25"},{"key":"26","doi-asserted-by":"publisher","DOI":"10.1017\/CBO9780511667572"},{"key":"27","article-title":"Mutual cooperation of external application and OPNET modeler simulation environment","author":"molna?r","year":"2009","journal-title":"Proc of the Intern Workshop Research in Telecommunication Technology"},{"journal-title":"EMTP User Manual","year":"2012","key":"28"},{"key":"29","article-title":"Real-time smart grid application testing using OPNET SITL","author":"babazadeh","year":"2012","journal-title":"OPNETWORK"},{"key":"3","article-title":"Design of a novel wide-area backup protection system","author":"wang","year":"2005","journal-title":"Proc IEEE\/PES Transmission and Distribution Conference and Exhibition Asia Pacific"},{"key":"2","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2004.843454"},{"key":"10","doi-asserted-by":"publisher","DOI":"10.1109\/SGMS.2011.6089201"},{"journal-title":"IEEE Std 2030-2011","article-title":"Interoperability of energy technology and information technology operation with the electric power system (EPS), end-use applications, and loads","year":"0","key":"1"},{"key":"7","doi-asserted-by":"publisher","DOI":"10.1109\/ISGTEurope.2012.6465734"},{"key":"30","article-title":"Design of robust wide-area damping controller based synchronized phasor","author":"zhu","year":"2012","journal-title":"IEE-APSCOM"},{"key":"6","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2012.2191805"},{"key":"5","doi-asserted-by":"publisher","DOI":"10.1109\/PES.2007.386202"},{"key":"4","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2006.873129"},{"key":"9","doi-asserted-by":"publisher","DOI":"10.1109\/SMARTGRID.2010.5622057"},{"key":"8","article-title":"A co-simulation approach for analysing the impact of the communication infrastructure in power system control","author":"monti","year":"2009","journal-title":"Proc of SCS Grand Challenges in Modeling and Simulation 2009"}],"event":{"name":"IEEE EUROCON 2013","start":{"date-parts":[[2013,7,1]]},"location":"Zagreb, Croatia","end":{"date-parts":[[2013,7,4]]}},"container-title":["Eurocon 2013"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6596534\/6624951\/06625092.pdf?arnumber=6625092","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,3,22]],"date-time":"2017-03-22T17:07:47Z","timestamp":1490202467000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/6625092\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2013,7]]},"references-count":30,"URL":"https:\/\/doi.org\/10.1109\/eurocon.2013.6625092","relation":{},"subject":[],"published":{"date-parts":[[2013,7]]}}}