{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,29]],"date-time":"2024-10-29T18:24:51Z","timestamp":1730226291465,"version":"3.28.0"},"reference-count":30,"publisher":"IEEE","license":[{"start":{"date-parts":[[2023,10,29]],"date-time":"2023-10-29T00:00:00Z","timestamp":1698537600000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2023,10,29]],"date-time":"2023-10-29T00:00:00Z","timestamp":1698537600000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2023,10,29]]},"DOI":"10.1109\/ias54024.2023.10406398","type":"proceedings-article","created":{"date-parts":[[2024,2,1]],"date-time":"2024-02-01T18:27:31Z","timestamp":1706812051000},"page":"1-9","source":"Crossref","is-referenced-by-count":1,"title":["Stochastic Scheduling Strategy for Integrated Energy System Considering Probability Interval Model of Integrated Demand Response Uncertainty"],"prefix":"10.1109","author":[{"given":"Yongling","family":"Cui","sequence":"first","affiliation":[{"name":"School of Electrical Engineering, Shandong University,Jinan,China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Chengfu","family":"Wang","sequence":"additional","affiliation":[{"name":"School of Electrical Engineering, Shandong University,Jinan,China"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Kang","family":"Wang","sequence":"additional","affiliation":[{"name":"School of Electrical Engineering, Shandong University,Jinan,China"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1109\/TSTE.2018.2876498"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2020.116402"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1109\/TIA.2021.3076020"},{"issue":"7","key":"ref4","first-page":"198","article-title":"Research on some key problems related to integrated energy systems","volume":"39","author":"Jia","year":"2015","journal-title":"Automation of Electric Power Systems"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1186\/s41601-019-0126-4"},{"issue":"24","key":"ref6","first-page":"7194","article-title":"Review and prospect of integrated demand response","volume":"38","author":"Xu","year":"2018","journal-title":"Proceedings of the CSEE"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1016\/j.energy.2021.120256"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1016\/j.energy.2023.126846"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1016\/j.energy.2022.123678"},{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1109\/TII.2018.2798820"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2021.3051720"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2022.119455"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2013.2257893"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1016\/j.rser.2022.112095"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2013.2244231"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1002\/2050-7038.12447"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1016\/j.est.2022.105536"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1049\/iet-gtd.2018.5943"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2023.121196"},{"key":"ref20","doi-asserted-by":"publisher","DOI":"10.1109\/TIA.2022.3145763"},{"issue":"20","key":"ref21","first-page":"43","article-title":"Distributed optimization of integrated energy system based on cooperative game in uncertain environment","volume":"46","author":"Yao","year":"2022","journal-title":"Automation of Electric Power Systems"},{"issue":"13","key":"ref22","first-page":"152","article-title":"Optimal dispatch of power system considering uncertainty of demand response based on extended sequence operation","volume":"42","author":"Xu","year":"2018","journal-title":"Automation of Electric Power Systems"},{"key":"ref23","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2022.3149959"},{"key":"ref24","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2020.3008180"},{"key":"ref25","doi-asserted-by":"publisher","DOI":"10.3390\/en11092448"},{"issue":"15","key":"ref26","first-page":"2","article-title":"Coordinated optimization of integrated electricity-gas energy system considering uncertainty of renewable energy output","volume":"43","author":"Wang","year":"2019","journal-title":"Automation of Electric Power Systems"},{"issue":"21","key":"ref27","first-page":"11","article-title":"Probabilistic optimal power flow of combined natural gas and electric system considering correlation","volume":"39","author":"Sun","year":"2015","journal-title":"Automation of Electric Power Systems"},{"issue":"1","key":"ref28","first-page":"33","article-title":"Decentralized low-carbon economic dispatch of electricity-gas network in consideration of demand-side management and carbon trading","volume":"47","author":"Guo","year":"2021","journal-title":"High Voltage Engineering"},{"issue":"22","key":"ref29","first-page":"21","article-title":"Coordinated scheduling model with multiple time scales considering response uncertainty of flexible load","volume":"43","author":"Zhao","year":"2019","journal-title":"Automation of Electric Power Systems"},{"issue":"2","key":"ref30","first-page":"163","article-title":"Optimal operation model of a park integrated energy system considering uncertainty of integrated demand response","volume":"50","author":"Yan","year":"2022","journal-title":"Power System Protection and Control"}],"event":{"name":"2023 IEEE Industry Applications Society Annual Meeting (IAS)","start":{"date-parts":[[2023,10,29]]},"location":"Nashville, TN, USA","end":{"date-parts":[[2023,11,2]]}},"container-title":["2023 IEEE Industry Applications Society Annual Meeting (IAS)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/10406298\/10406221\/10406398.pdf?arnumber=10406398","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,2,2]],"date-time":"2024-02-02T00:59:57Z","timestamp":1706835597000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/10406398\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,10,29]]},"references-count":30,"URL":"https:\/\/doi.org\/10.1109\/ias54024.2023.10406398","relation":{},"subject":[],"published":{"date-parts":[[2023,10,29]]}}}