{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,29]],"date-time":"2024-10-29T18:50:17Z","timestamp":1730227817111,"version":"3.28.0"},"reference-count":23,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2014,9]]},"DOI":"10.1109\/icacci.2014.6968518","type":"proceedings-article","created":{"date-parts":[[2014,12,2]],"date-time":"2014-12-02T22:33:17Z","timestamp":1417559597000},"page":"2355-2362","source":"Crossref","is-referenced-by-count":7,"title":["Railway track breakage detection method using vibration estimating sensor network: A novel approach"],"prefix":"10.1109","author":[{"given":"Kalpana","family":"Sharma","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Saurabh","family":"Maheshwari","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ruchika","family":"Solanki","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Vineet","family":"Khanna","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1049\/cp.2011.0618"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1109\/CIHSPS.2006.313313"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1109\/ICMA.2012.6284322"},{"key":"ref13","first-page":"21","article-title":"Train-Mounted GPR for High-Speed Rail Trackbed Inspection","author":"al-nuaimy","year":"2004","journal-title":"Tenth International Conference on Ground Penetrating Radar"},{"key":"ref14","article-title":"Automatic Broken Track Detection Using LED-LDR Assembly","volume":"1","author":"vanimiredd","year":"2013","journal-title":"International Journal of Engineering Trends and Technology (IJETT)"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1109\/TIA.1974.349164"},{"key":"ref16","first-page":"448","article-title":"Railway Security Through The Use of Wireless Sensor Networks Based on Fuzzy Logic","volume":"6","author":"sam daliri","year":"2011","journal-title":"International Journal of the Physical Sciences"},{"key":"ref17","article-title":"Railway Faults Tolerance Techniques using Wireless Sensor Networks","volume":"3","author":"ramesh","year":"2012","journal-title":"IJECT"},{"key":"ref18","first-page":"1280","article-title":"Monitoring Rail Traffic Using Wireless Sensor Network (WSN","volume":"2","author":"lorestani","year":"2012","journal-title":"IJCSE"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1109\/.2006.1629461"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1046\/j.1460-2695.2003.00693.x"},{"key":"ref3","article-title":"Study of Rail Breaks: Associated Risks and Maintenance Strategies","author":"kumar","year":"0","journal-title":"Technical Report Division of Operation and Maintenance Engineering Lule&#x00E5; Railway Research Center (JVCT)"},{"key":"ref6","article-title":"Track Geometry and Substructure Management","author":"ernest","year":"1994","journal-title":"Thomas Telfold"},{"journal-title":"Development of An Integrated Model for Assessment of Operational Risks in Rail Track","year":"2007","author":"reddy","key":"ref5"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1016\/S1389-1286(01)00302-4"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1046\/j.1460-2695.2003.00696.x"},{"key":"ref2","article-title":"Technical and economic evaluation of maintenance for rail and wheels on Malmbanan","author":"ahren","year":"2003","journal-title":"International Heavy Haul Association (IHHA) Specialist Technical Session Session 5c Wheel\/Rail Asset Life Extension"},{"article-title":"Modern Railway Track","year":"2001","author":"esveld","key":"ref1"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1002\/0470095121"},{"key":"ref20","first-page":"2278","article-title":"Innovative Railway Track Surveying with Sensors and Controlled by Wireless Communication","author":"kalairnathi","year":"0","journal-title":"International Journal of Advanced Electrical and Electronics Engineering (IJAEEE)"},{"key":"ref22","doi-asserted-by":"publisher","DOI":"10.1109\/TWC.2002.804190"},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.4108\/ICST.WICON2008.4863"},{"journal-title":"Study of Rail Breaks Associated Risks and Maintenance","year":"0","key":"ref23"}],"event":{"name":"2014 International Conference on Advances in Computing, Communications and Informatics (ICACCI)","start":{"date-parts":[[2014,9,24]]},"location":"New Delhi","end":{"date-parts":[[2014,9,27]]}},"container-title":["2014 International Conference on Advances in Computing, Communications and Informatics (ICACCI)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6949764\/6968191\/06968518.pdf?arnumber=6968518","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,10,14]],"date-time":"2020-10-14T14:47:44Z","timestamp":1602686864000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/6968518"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,9]]},"references-count":23,"URL":"https:\/\/doi.org\/10.1109\/icacci.2014.6968518","relation":{},"subject":[],"published":{"date-parts":[[2014,9]]}}}