{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,23]],"date-time":"2024-10-23T01:03:59Z","timestamp":1729645439514,"version":"3.28.0"},"reference-count":13,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2016,2]]},"DOI":"10.1109\/icaci.2016.7449798","type":"proceedings-article","created":{"date-parts":[[2016,4,11]],"date-time":"2016-04-11T21:49:10Z","timestamp":1460411350000},"page":"29-35","source":"Crossref","is-referenced-by-count":0,"title":["Coordinative allocation model and method of equipment maintenance materiel"],"prefix":"10.1109","author":[{"given":"Tiening","family":"Wang","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Shuangshuang","family":"Yu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ning","family":"Li","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Shengliang","family":"Xu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Chao","family":"Yun","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Qinqin","family":"Wang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref10","first-page":"109","article-title":"The analysis of inventory management in the environment of supply chain","volume":"34","author":"xie","year":"2011","journal-title":"Logistics SCI-Tech"},{"key":"ref11","first-page":"21","article-title":"Method for optimizing stocks of spare parts of armoring equipment depots","volume":"32","author":"wang","year":"2013","journal-title":"Ordnance Industry Automation"},{"key":"ref12","doi-asserted-by":"crossref","first-page":"181","DOI":"10.1007\/s11633-013-0711-3","article-title":"Position control of electro-hydraulic actuator system using fuzzy logic controller optimized by particle swarm optimization","volume":"10","author":"daniel","year":"2013","journal-title":"International Journal of Automation and Computing"},{"key":"ref13","first-page":"33","article-title":"Reactive power optimization based on improved particle swarm optimization algorithm","volume":"33","author":"yang","year":"2011","journal-title":"Heilongjiang Electric Power"},{"key":"ref4","first-page":"106","article-title":"most optimum distribution of military logistics resources","volume":"4","author":"yang","year":"2008","journal-title":"Logistics SCI-Tech"},{"key":"ref3","first-page":"107","article-title":"resources configuration model of multi-Stages equipment support process","volume":"30","author":"chen","year":"2009","journal-title":"Journal of Sichuan Ordnance"},{"key":"ref6","first-page":"69","article-title":"Research on optimization of armored equipment materiel emergency dispatch based on multi-mode transportation","author":"tian","year":"2009"},{"key":"ref5","first-page":"100","article-title":"Research summary on resource scheduling problem","volume":"26","author":"xia","year":"2009","journal-title":"Mechanical & Electrical Engineering Magazine"},{"key":"ref8","first-page":"62","article-title":"A demand classification based approach of inventory management for spare-parts and its application","volume":"26","author":"xu","year":"2006","journal-title":"Systems Engineering-theory & Practice"},{"key":"ref7","first-page":"284","article-title":"Fuzzy decision model for emergency resource allocation and dispatch","volume":"37","author":"wei","year":"2011","journal-title":"Computer Engineering"},{"key":"ref2","first-page":"220","article-title":"Resources configuration of equipment maintenance support based on rough set theory","volume":"33","author":"song","year":"2007","journal-title":"Computer Engineering"},{"key":"ref1","first-page":"13","article-title":"Over-stocked materiel! under-stocked materiel analysis and degree evaluation of armored equipment materiel stock","volume":"28","author":"wang","year":"2014","journal-title":"Journal of Armor force engineer"},{"key":"ref9","first-page":"82","article-title":"An EOQ model with controllable lead time, setup cost and backlogging rate","volume":"25","author":"chen","year":"2007","journal-title":"Systems Engineering"}],"event":{"name":"2016 Eighth International Conference on Advanced Computational Intelligence (ICACI)","start":{"date-parts":[[2016,2,14]]},"location":"Chiang Mai, Thailand","end":{"date-parts":[[2016,2,16]]}},"container-title":["2016 Eighth International Conference on Advanced Computational Intelligence (ICACI)"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/7445578\/7449793\/7449798.pdf?arnumber=7449798","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,6,24]],"date-time":"2017-06-24T10:42:13Z","timestamp":1498300933000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/7449798\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,2]]},"references-count":13,"URL":"https:\/\/doi.org\/10.1109\/icaci.2016.7449798","relation":{},"subject":[],"published":{"date-parts":[[2016,2]]}}}